Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-Finance H NO 113 APR COLONY KATANGA CANTT JABALPUR M P PIN 482001 | JABALPUR | MADHYA PRADESH | 482001 | L1 | Accepted-Finance Accepted being L1 | |
| 2 | L2₹5.8 L+₹48,846 (9.27%)Rejected-Finance FLAT NO 104 SARITA ELEGANCE SINHAGAD ROAD PUNE DIST PUNE | PUNE | MAHARASHTRA | 410301 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹6.3 L+₹99,813 (18.9%)Rejected-Finance PLOT NO 59 60 WAZIDPUR JAIMAU KANPUR 208010 | KANPUR NAGAR | UTTAR PRADESH | 208010 | L3 | Rejected-Finance Rejected | |
| 4 | L4₹6.3 L+₹1.0 L (19.6%)Rejected-Finance | L4 | Rejected-Finance Rejected | |
| 5 | L5₹6.7 L+₹1.4 L (26.4%)Rejected-Finance | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | R. S. Associates L7 | B. S BUILDERS L3 | RIZCON L5 | SAGAR ENTERPRISES L4 | M/S BHARAT BUILDERS L2 | M/s Vijay Enterprises L6 | P.H. CONSTRUCTION CO. L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for preparation of existing roof surface by scraping, cleaning and making rough to receive the roof treatment complete all as specified and directed by Engineer-in-Charge. | 750 | Sqm | 4 ₹3,000 Lowest | 19 ₹14,250 | 5 ₹3,750 | 5 ₹3,750 | 10 ₹7,500 | 20 ₹15,000 | 10 ₹7,500 |
| 2.00 | M&L for PCC 1:2:4 type B-0 (using 12.5mm graded aggregate) finishing cement concrete surface even and smooth without using extra cement in roof padding of any position of any height complete all as specified and directed by Engineer-in-Charge. | 42 | Cum | 5,500 ₹2,31,000 | 3,199 ₹1,34,358 | 2,750 ₹1,15,500 | 2,999 ₹1,25,958 | 2,500 ₹1,05,000 Lowest | 4,000 ₹1,68,000 | 2,875 ₹1,20,750 |
| 3.00 | M&L for applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.20 kg per sq.m including cleaning base surfaces complete all as specified and directed by Engineer-in-Charge. | 750 | Sqm | 35 ₹26,250 Lowest | 63 ₹47,250 | 88 ₹66,000 | 60 ₹45,000 | 50 ₹37,500 | 150 ₹1,12,500 | 55 ₹41,250 |
| 4.00 | M&L for 3mm thick APP based polymeric membrance weighing not less than 3Kg/Sqm, reinforced with polyester non wove fabric (Wt not less than 150 gms/sqm) laid on primed surface by forced application using gas torch with an overlapping 100mm on each side complete all as specified and directed by Engineer-in-Charge.
Note: No extra charges shall be paid for gas & other arrangements. | 750 | Sqm | 625 ₹4,68,750 | 399 ₹2,99,250 | 485 ₹3,63,750 | 499 ₹3,74,250 | 435 ₹3,26,250 | 370 ₹2,77,500 Lowest | 375 ₹2,81,250 |
| 5.00 | M&L for preparation of new surfaces of any description, over 10cm in width or girth,not otherwise described and applying two coats of aluminium paint complete all as specified and directed by Engineer-in-Charge. | 750 | Sqm | 15 ₹11,250 Lowest | 59 ₹44,250 | 79 ₹59,250 | 50 ₹37,500 | 60 ₹45,000 | 60 ₹45,000 | 45 ₹33,750 |
| 6.00 | M&L for PCC 1:2:4 type B-1 (using 20 mm graded agg) in kerbs , rounded or chamfered on edges including necessary form work complete all as specified and directed by Engineer-in-Charge. | 2 | Cum | 5,000 ₹10,000 | 3,390 ₹6,780 | 3,000 ₹6,000 | 2,200 ₹4,400 | 3,000 ₹6,000 | 4,500 ₹9,000 | 2,150 ₹4,300 Lowest |
| 7.00 | Disconnecting existing tanks of 500 litre capacity, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position and writing 'date of cleaning' on tank with white paint complete all as specified and directed by Engineer-in-Charge. | 1 | Each | 200 ₹200 | 300 ₹300 | 99 ₹99 | 50 ₹50 Lowest | 200 ₹200 | 200 ₹200 | 100 ₹100 |
| 8.00 | Disconnecting existing tanks of 1000 litre capacity, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position and writing 'date of cleaning' on tank with white paint complete all as specified and directed by Engineer-in-Charge. | 1 | Each | 500 ₹500 | 501 ₹501 | 99 ₹99 | 50 ₹50 Lowest | 100 ₹100 | 300 ₹300 | 100 ₹100 |
| 9.00 | Dismantling water tank exc 500 & n exc 1000 ltr and removing from site complete all as specified and directed by Engineer-in-Charge. | 3 | Each | 300 ₹900 | 500 ₹1,500 | 99 ₹297 | 10 ₹30 Lowest | 100 ₹300 | 300 ₹900 | 100 ₹300 |
| 10.00 | S&F of rotational moulded polythene water storage tank triple layers (Cylindrical vertical withclosed top) hoisted and fixed in position of 1000 ltrs capacity any description,complete all as specified in SSR Part I and directed by Engineer-in-Charge. | 3 | Each | 6,700 ₹20,100 | 8,000 ₹24,000 | 5,999 ₹17,997 | 5,200 ₹15,600 | 6,000 ₹18,000 | 6,000 ₹18,000 | 2,150 ₹6,450 Lowest |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
11 Aug 2026, 6:00 pmClosed
AGE(I) (U) B/R
AGE(I) (U) B/R DELHI CANTT-10
REPAIR TO ROOF TREATMENT UNDER THE AOR OF AGE SLDC E/S INSTALLATION SUB STN UNDER AGE(I) (U) B/R DELHI CANTT-10
2026_MES_777745_1
AGE(I)(U)B/R-TOKEN-21/2026-27
Open Tender
Civil Works
Item Rate
150 days
Delhi Cantt
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
AGE(I) (U) B/R Delhi Cantt
₹20,000
Yes
14 Aug 2026
10 Jul 2026
13 Aug 2026
10 Jul 2026
11 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for preparation of existing roof surface by scraping, cleaning and making rough to receive the roof treatment complete all as specified and directed by Engineer-in-Charge. | 750 | Sqm | - | - |
| 2 | M&L for PCC 1:2:4 type B-0 (using 12.5mm graded aggregate) finishing cement concrete surface even and smooth without using extra cement in roof padding of any position of any height complete all as specified and directed by Engineer-in-Charge. | 42 | Cum | - | - |
| 3 | M&L for applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.20 kg per sq.m including cleaning base surfaces complete all as specified and directed by Engineer-in-Charge. | 750 | Sqm | - | - |
| 4 | M&L for 3mm thick APP based polymeric membrance weighing not less than 3Kg/Sqm, reinforced with polyester non wove fabric (Wt not less than 150 gms/sqm) laid on primed surface by forced application using gas torch with an overlapping 100mm on each side complete all as specified and directed by Engineer-in-Charge.
Note: No extra charges shall be paid for gas & other arrangements. | 750 | Sqm | - | - |
| 5 | M&L for preparation of new surfaces of any description, over 10cm in width or girth,not otherwise described and applying two coats of aluminium paint complete all as specified and directed by Engineer-in-Charge. | 750 | Sqm | - | - |
| 6 | M&L for PCC 1:2:4 type B-1 (using 20 mm graded agg) in kerbs , rounded or chamfered on edges including necessary form work complete all as specified and directed by Engineer-in-Charge. | 2 | Cum | - | - |
| 7 | Disconnecting existing tanks of 500 litre capacity, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position and writing 'date of cleaning' on tank with white paint complete all as specified and directed by Engineer-in-Charge. | 1 | Each | - | - |
| 8 | Disconnecting existing tanks of 1000 litre capacity, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position and writing 'date of cleaning' on tank with white paint complete all as specified and directed by Engineer-in-Charge. | 1 | Each | - | - |
| 9 | Dismantling water tank exc 500 & n exc 1000 ltr and removing from site complete all as specified and directed by Engineer-in-Charge. | 3 | Each | - | - |
| 10 | S&F of rotational moulded polythene water storage tank triple layers (Cylindrical vertical withclosed top) hoisted and fixed in position of 1000 ltrs capacity any description,complete all as specified in SSR Part I and directed by Engineer-in-Charge. | 3 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_871044.xls
BOQ • 0.49 MB
TENDER21.pdf
Tender Documents • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .