Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | ₹6.9 L | L1 | Accepted-AOC Quoted rate stands lowest |
| 2 | L2₹7.2 L+₹32,149 (4.67%)Rejected-Finance | ₹7.2 L+₹32,149 (4.67%) | L2 | Rejected-Finance Quoted rate stands 2nd lowest |
| 3 | L3₹7.9 L+₹1.0 L (15.1%)Rejected-Finance | ₹7.9 L+₹1.0 L (15.1%) | L3 | Rejected-Finance Quoted rate stands 3rd lowest |
Tender Value
₹9.0 L
EMD Value
₹18,011
Closing Date
25 May 2026, 2:00 pmClosed
EE Alipurduar Irrigation Division
Oo the EE, Alipurduar Irrigation Division
Maintenance and repair to protection work on the right bank of river Turturi Jhora for a length of 450 mtr within GP Turturikhanda in PS Samuktala Block Kumargram Dist. Alipurduar. 2nd call
2026_IWD_1024314_9
WBIW/EE/APD/NIT-03(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
150 days
PS Samuktala Block Kumargram Dist. Alipurduar
Please refer Tender documents.
8 documents required · 8 mandatory
₹18,011
Yes
17 Jun 2026
16 May 2026
28 May 2026
16 May 2026
25 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of materials from river bed /stoney soil as noted below as per designed section and throwing the spoils for making banks as profile or to deposit the same in any other place as directed by the Engineer-in charge for making embankment within a lead of 50 metre and lift upto 4 metre. including dressing etc. complete. (Work is to be done with mechanical devices)
a) Loose boulder mixed with shingles or sand having boulder of size above 20 cm. upto 30 cm. more than 20% upto 30% by volume including removing roots & stumps of trees, cost of profiling channel crossing etc. complete | 4,515 | Cum | 139.14 | ₹6,28,217.1 |
| 2 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg./sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 450 | Each | 132.35 | ₹59,557.5 |
| 3 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny/poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer-in-Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of nylon crate is 1 m x 1 m x 1 m. Where boats are not necessary | 450 | Each | 472.84 | ₹2,12,778 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_2517516.xls
BOQ • 0.30 MB
form2911.pdf
Tender Documents • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .