Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.2 LAdmitted-Finance | -38.99% | ₹15.2 L | L1 | Admitted-Finance |
| 2 | L2₹15.7 LAdmitted-Finance | -36.92% | ₹15.7 L | L2 | Admitted-Finance |
| 3 | L3₹17.4 LAdmitted-Finance | -30.32% | ₹17.4 L | L3 | Admitted-Finance |
| 4 | L4₹17.7 LAdmitted-Finance | -28.99% | ₹17.7 L | L4 | Admitted-Finance |
| 5 | L4₹17.7 LAdmitted-Finance | -28.99% | ₹17.7 L | L4 | Admitted-Finance |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
13 Apr 2026, 6:55 pmClosed
Commissioner, Municipal Corporation Udaipur
Municipal Corporation Udaipur, Town Hall Link Road
Repair and maintenance work of crematoriums in different wards in nagar nigam area ARC (e_02 / Nirman_02)
2026_DLB_550048_1
E_02_2026-27_Nirman_02
Open Tender
Civil Works
365 days
Udaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Commissioner, Municipal Corporation Udaipur
₹50,000
Yes
25 Apr 2026
4 Apr 2026
15 Apr 2026
4 Apr 2026
13 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer-Dismantling Brick / Tile work:Dry brick pitching or brick soling | - | cum | 241.5 | - |
| 2 | Brick on edge flooring with bricks of class designation 75 including cement slurry etc. complete in cement mortar:1:4 (1 cement : 4 coarse sand) | - | sqm | - | - |
| 3 | Providing corrugated G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete upto any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.0.63 mm thick with zinc coating not less than 275gm/m² | - | sqm | 914 | - |
| 4 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. 1:4 (1 cement : 4 fine/ coarse sand) | - | sqm | 315.5 | - |
| 5 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete | - | sqm | 204.5 | - |
| 6 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). | - | sqm | 144 | - |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work | - | sqm | 114 | - |
| 8 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade :One or more coats on old work. | - | sqm | 75.6 | - |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work. | - | sqm | 72.6 | - |
| 10 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank | - | per litre | 8.8 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_980537.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid