RequiredExperience with Government
RequiredAnnual Turnover
RequiredOEM Authorization Certificate
RequiredOEM Annual Turnover Bid to RA enabled No Fogging Machine ( 1 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) Certification Conformity to Indian Standard IS 14855 (Part-I):Latest Yes * ISI Marked Yes * CM/L No and validity date - * Capacity of machine will also certified by Yes * 1/4 ILAC/NABL/Gov. lab Test Report Details Availability of Type Test Report covering all test parameters as per IS:14855(Part-I)latest and claims in the product on GeM from any ILAC/NABL accredited/Central Gov. Lab Yes * Test certificate Number - * Test Report Date - * Name of the Lab where test Conducted - * Type and Starting of Machine Type Vehicle Mountable Vehicle Mountable Starting Electrical Manual
RequiredElectrical Material Chemical Tank Material HDPE HDPE Fuel Tank Material Stainless Steel Stainless Steel Chemical Tank (Material)/thickness HDPE density:0.935g/c c
Requiredpolymer content 99.45% HDPE density:0.935g/c c
Requiredpolymer content 99.45% Fuel Tank (Material)/thickness Stainless steel/0.95mm Grade X04Cr19Ni9 HDPE density:0.935g/c c
Requiredpolymer content 99.45%
RequiredStainless steel/0.95mm Grade X04Cr19Ni9 Engine Output Engine Output (minimum)/Chemical Discharge Capacity (max.) (KW/LPH) 37/75 (Vehicle Mountable) 37/75 (Vehicle Mountable) Engine Output (minimum)/Chemical Tank Capacity (min.) (KW/Litres) 37/75 37/75 Engine Output (minimum)/Fuel Tank Capacity (min.) (KW/Litres) 37/10 37/10 Other Physical Characteristics Duration to Operate Without refuel (Hrs) 2 2 Noise Level (decibel) 102 102 Durability after 50 hrs - * Strap test as per Cl.8.4 Yes * Standard Tools
Requiredspares and accessories Yes * Rechargeable 12 12 2/4 Battery Unit capacity (Volts) AMC for Fogging Machine (Years) 1 1 * Specifications highlighted in bold are the Golden Parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer. Additional Specification Documents