Tender Value
₹35.2 L
EMD Value
₹36,000
Closing Date
10 Dec 2019, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA DINDIGUL
THE PROJECT DIRECTOR DRDA DINDIGUL
Renovation of MI Tanks Ponds and Ooranies under SFC Grants for the year 2019-2020 at Vedasandur block TN-05-169
2019_RDTN_149976_1
Roc.No.6271-A11-2019 TN-05-169
Open Tender
Civil Works - Water Works
Item Rate
180 days
THE PROJECT DIRECTOR DRDA DINDIGUL
Renovation of MI Tanks Ponds and Ooranies under SFC Grants for the year 2019-2020 at Vedasandur block TN-05-169
4 documents required · 4 mandatory
₹0
₹36,000
Yes
THE PROJECT DIRECTOR DRDA DINDIGUL
14 Jan 2020
2 Dec 2019
10 Dec 2019
2 Dec 2019
10 Dec 2019
4 Dec 2019
4 Dec 2019
Amount
Part 1 : Renovation of Aruppampattykulam MI Tank in Nallamanarkottai panchayat Estimate Amount : Rs 9.94 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Repairs to Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 2 : Renovation of Palaniyandipillaikulam MI Tank in V.Pudhukottai panchayat Estimate Amount : Rs 3.80 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 3 : Renovation of Elandhaikulam in Malvarpatty panchayat Estimate Amount : Rs 3.50 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 4 : Renovation of Mandhaikulam MI Tank in Marambady panchayat Estimate Amount : Rs 9.00 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 5 : Renovation of Muniyankulam MI Tank in Nathapatty panchayat Estimate Amount : Rs 9.00 Lakhs
Clearing the Juliflora jungle with uprooting and disposing by the engineer incharge of the works as per technical
Eathwork in all expacted hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete
Contruction of Wier
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
For Centering without strutting(up to basement)
for centering With Strutting
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sugan K
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .