| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance 1301 3 SHASTRI NAGAR MEERUT U P 250004 | MEERUT | UTTAR PRADESH | 250004 | -18.00% | ₹7.9 L | L1 | Admitted-Finance |
| 2 | L2₹8.9 L+₹1.0 L (12.8%)Admitted-Finance | -7.50% | ₹8.9 L+₹1.0 L (12.8%) | L2 | Admitted-Finance |
| 3 | L3₹10.1 L+₹2.2 L (28.0%)Admitted-Finance | +5.00% | ₹10.1 L+₹2.2 L (28.0%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical P O PURUWALA TEHSIL PAONTA SAHIB DISTT SIRMOUR 173025 H P | PAONTA SAHIB | SIRMOUR | HIMACHAL PRADESH | 173025 | - | - | - | Rejected-Technical reject |
Tender Value
₹9.6 L
EMD Value
₹19,300
Closing Date
16 Jul 2026, 11:00 amClosed
Superintending Engineer ES Circle Totu Shimla
Superintending Engineer ES Circle Totu Shimla
Tender for Complete overhauling of 145 KV ABB make SF 6 Circuit Breaker Type ELF SF 2-1, make 1995, in 132 KV Sub Station Solan under ES Division, HPSEBL, Solan.
2026_HPSEB_136913_1
SEES/SHIMLA-387/2025-26
Open Tender
Electrical Works
Percentage
90 days
Solan
Please refer tender documents
4 documents required · 4 mandatory
₹1,180
Yes
₹19,300
Yes
29 Jul 2026
18 Jun 2026
17 Jul 2026
18 Jun 2026
16 Jul 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of overhauling kit for 3 pole column | 1 | cum | 1,54,875 | ₹1,54,875 |
| 2 | Supply of overhauling kit for 3 nos. pneumatic drive | 1 | cum. | 3,70,461 | ₹3,70,461 |
| 3 | Supply of Tool and tackle set for overhauling of breaker | 1 | cum. | 85,491 | ₹85,491 |
| 4 | Complete dismantling of all three poles of 145 KV SF6 Circuit Breaker ( ABB make SF-6 Circuit Breaker Type: ELF SF 2-1, make 1995) including dismantling of all three poles, safe lowering, opening of interrupter chambers, replacement of complete gasket/O-ring set, cleaning of flange faces, servicing of operating mechanism, spring charging motor, gearbox, trip & closing coils (220V DC), auxiliary contacts, checking of main contacts wear, lubrication, replacement of worn bushes / bearings if required, proper re-assembly with torque tightening, pole alignment, re-fixing on structure, SF6 gas pressure checking, SF6 gas system including evacuation, moisture removal and topping-up/refilling of SF6 gas as required; checking of density monitor, pressure switches, control wiring and interlocks: adjustment of operating mechanism, replacement of leaking air pressure copper pipes, timing verification, mechanical and electrical operations including O-C-O operation, measurement of contact resistance of all three poles, functional testing, final testing, commissioning and submission of test reports, complete in all respects as per OEM recommendation leakage test, breaker timing test, IR test and making the breaker fully operational in all respects as per satisfaction of Engineer-in-Charge. (Including Supervisory Service Support including Transportation cost, Hotel accomodation, local conyeyance including all miscellaneous expenditure required to complete the job in all respect. (Approx. 5 mandays with Rs. 60,000/- per day expense) | 1 | cum | 3,54,000 | ₹3,54,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Technocommercial387.xls
Additional Documents • 0.04 MB
BOQ_202640.xls
BOQ • 0.31 MB
Tenderdocuments387.pdf
Tender Documents • 0.56 MB
corrigendum.pdf
PDF • 0.29 MB
corrigendum387.pdf
PDF • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .