| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance PLOT 41 PHASE 1A RAJKISHOR NAGAR LINGAYDIH RAJKISHOR NAGAR BILASPUR CHHATTISGARH 495006 | BILASPUR | CHHATTISGARH | 495006 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance B 4 PLOT NO 114 GURU KIRPA BUILDING SHIV SHAKTI NAGAR TN MISHRA MARG NIRMAN NAGAR JAIPUR JAIPUR RAJASTHAN JAIPUR RAJASTHAN 302019 | JAIPUR | RAJASTHAN | 302019 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹80.2 L
EMD Value
₹1.4 L
Closing Date
10 Aug 2023, 2:00 pmClosed
Shri R S Sabat, DGM Tech. (Purchase)
Purchase Department, IREL (India) Limited Matikhalo
Construction of Covering Slab for Underground RCC Thorium Oxalate Trench
2023_IREL_161888_1
12/23769
Open Tender
Civil Works - Others
Works
105 days
IREL (India) Limited Matikhalo
as per NIT
2 documents required · 2 mandatory
₹0
₹1.4 L
Yes
1 Nov 2023
21 Jul 2023
11 Aug 2023
21 Jul 2023
10 Aug 2023
21 Jul 2023
21 Jul 2023 - 10 Aug 2023
Supplying and placing in position machine mixed and mechanically vibrated design mix RCC of grade M-30 with minimum cement content of 420 kg/cum using 20mm & downgraded stone aggregate including cost of watering, curing, consolidation, mixing etc. but excluding cost of all shuttering & reinforcement at and at all heights above and . depth below plinth level in foundation footing, columns, base slab, wall and beams, roof slab etc. complete in all respects in line and level as indicated in the drawing or as directed by E.I.C. including all labour, material, T&P etc. complete:The RCC will be cast in precast panels at site and will be erected and fixed on the top of existing RCC trench after curing and shall be quoted accordingly. as per scope of work
Supplying, providing, straightening, decoiling wherever necessary, cutting, bending binding with approved 18 gauge GI binding wires and placing in position all reinforcement (confirming to IS:1786) at and at all heights and 9 mtr. depth below plinth level including fixing of cover blocks, scaffolding, all conveyance, labour, T&P etc. complete including the cost of reinforcement steel. (HYSD steel confirming to IS: 1786 will be used at site. as per scope of work
Centering and shuttering including strutting, propping, de shuttering etc. and removal of form work : For all concrete works as per scope of work
Supply, fabrication and erection of Structural steel (Confirming to IS:2062) single/ built up sections such as MS beams, angles ,channels , tees, flats, RSJs ,rods, pipes and plates for columns, gable beams, purlins, bracings, ties, plates, shutters, trusses, louvers, portal frames, bracings, gabble runners, mono rails, weld mesh fabric, etc. with fixtures such as end stop , clamps, bolts and nuts etc. including charges for cutting splicing, drilling holes as required ,fixing to lines and levels including cutting, welding, supply & erecting with necessary MS bolts and nuts including hire for plants and equipments, cost of materials, taxes and labour charges, proper scaffolding, safety appliances etc. and painting the exposed surface with one coat of Micaceous Iron oxide- (DFT-70-90 micron) and one coat of chlorinated rubber finish paint (DFT 35 microns) over two coats of chloro rubber based zinc phosphate primer (DFT 35micron each) of approved quality and colour etc. Complete .as directed by Engineer-in- Charge as per scope of work
Dismantling of bolted/riveted /welded STRUCTURAL STEEL WORK of all descriptions (taking all necessary safety precautions), including supply of all tools and tackles, consumables, necessary scaffolding etc., providing temporary bracings as required, cutting (by flame or saw) gusset plates, bolts, nuts, welding etc., transporting and stacking of the serviceable materials and returning to IREL store ,cleaning the site of work of all unserviceable materials and dumping in disposal yard, all complete at all depths and heights, as specified and directed. as per scope of work
Dismantling GI/asbestos/translucent sheets, ridges, gutters etc. (taking all necessary safety precautions) in roofing and wall claddings, including supply of all tools & tackles, necessary scaffolding, consumables, cutting (by flame or saw) of fixing hooks, transporting and stacking the serviceable materials, cleaning the site and disposal of the unserviceable material in disposal yard, all complete at all heights, as specified and directed. as per scope of work
Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: (a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. (b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs. (c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge. (d) Finishing the surface with 20 mm thick joint less cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep. (e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.“All above operations to be done in order and as directed and specified by the Engineer-in-Charge : With average thickness of 120 mm and minimum thickness at khurra as 65 mm. as per scope of work
M/s Surendra Swain
Sunita Infra Projects Pvt Ltd
METAL ENGINEERING
SWANIP INFRACON PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .