Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.3 LAccepted-Finance 4TH FLOOR OLYMPUS 179 PERIN NARIMAN STREET FORT MUMBAI MAHARASHTRA 400001 UDYAM MH 19 0008507 27AAAFV1434B1ZP R M MII STATUS AS VERIFIED | MUMBAI | MAHARASHTRA | 400001 | ₹48.3 L | L1 | Accepted-Finance Rate Approved Below BSR |
| 2 | l2₹57.9 LAccepted-Finance | ₹57.9 L | l2 | Accepted-Finance L2 |
Tender Value
₹50.4 L
EMD Value
₹1.0 L
Closing Date
20 Apr 2026, 6:00 pmClosed
Executive Engineer WDSC Nohar
Office of EXEN WDSC NOHAR
Construction of Tanka MJSA 2.2 Block Nohar Dist Hanumangarh
2026_WDSC_551125_1
NOHAR NIT 1 2026-27 MJSA 2.2
Open Tender
Civil Works - Water Works
GP Khuiya PS Nohar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
0075-00-800-52-01
₹1.0 L
28 Apr 2026
11 Apr 2026
21 Apr 2026
11 Apr 2026
20 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
E/W in excavation for foundation trenches upto 1.5 mt depth including ramming the bottom, finishing & dressing of side, filling the gape with soil & disposal of surplus soil upto 50 mt. lead (In ordinary soil(cum)(RDPR BSR item 2A) | - | Cu.m | - | - | |
Additional lift from 1.5 to 3.0 m | - | Cu.m | - | - | |
Additional lift from 3.0 m to 4.5 m | - | Cu.m | - | - | |
P/L cement concrete for foundation in 1:5:10 ( 1 cement : 5 bajri : 10 stone ballast) including curing, compaction etc complete(cum)(RDPR BSR item 9A) | - | Cu.m | - | - | |
Ist class brick masonary for foundation & plinth in 1:6 (1 cement : 6 bajri) filling the joints, curing etc complete.(Cum)(RDPR BSR item 20A) | - | Cu.m | - | - | |
P/L C/C in1:1.5:3 ratio in R.C.C. work for slab,lintel,beam,chhajja etc. compation &curing complete using 12mm size of stone ballast excluding cost of centering & shuttetring(Cum)(RDPR BSR item 13B) | - | Cu.m | - | - | |
P/L reinforcement for R.C.C. work as per specification(RDPR BSR item 61) | - | kg | - | - | |
Centering & Shuttering for R.C.C. work upto 4.5m height including laying & removing complete(RDPR BSR item 93B) | - | Sq.m | - | - | |
P/L stone patties roof as per jodhpur practice, including filling the gape with stone chips in 1:4 cm, as per specification (sqm.) Span 1.5-2.4 m(RDPR BSR item 45B) | - | Sq.m | - | - | |
अधिक पकी ईंटो का खरंजा किसी भी वोंड व केम्बर तथा ग्रेड में लगाना तथा जोड़ों में मिट्टी भरकर ईंटों के ऊपर फैलाना सहित । पट्ट ईंट में (RDPR BSR item 150B) | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.16 MB
BOQ_982128.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid