| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹79.3 LAccepted-AOC 2162 SECTOR 1 4 HISAR 125001 | HISAR | HARYANA | 125001 | l1 | Accepted-AOC l1 | |
| 2 | l2₹80.9 L+₹1.7 L (2.08%)Rejected-AOC VPO GORIPUR TEHSIL DISTT BHIWANI | BHIWANI | BHIWANI | HARYANA | l2 | Rejected-AOC l2 |
Tender Value
₹81.0 L
EMD Value
₹1.6 L
Closing Date
5 May 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, M/Garh Canal W/S Division, NNL
Executive Engineer, M/Garh Canal W/S Division, Narnaul
Rehabilitation of Narnaul Minor from Km 0.000 to 3.278(Tail)
2021_HRY_169822_10
No. 1480-98/6A Dated 20/04/2021
Open Tender
Civil Works
Item-rate/Agreement basic
90 days
NARNAUL
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹1.6 L
Yes
7 Jun 2021
27 Apr 2021
6 May 2021
27 Apr 2021
5 May 2021
27 Apr 2021
90 days
Amount
E/ Work in excavation for strengthening of banks and raising of service road1. E/ Work in excavation for strengthening of banks and raising of service road in av. lead of 495 mtr. (HSR No. 6.2)
Compaction for earth work (HSR No. 6.2(i+ii+v))
Earthwork in excavation for coping.(HSR item No.6.1)
Providing & placing in position/design mix cement concrete for lining of grade M-15, with minimum cement contents 240Kg/cum for coping
Earth Work in excavation in foundation, trenches etc. in all kind of soils, not exceeding 2 meters depth including dressing of bottom and sides of trenches stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6).
C.C. 1:4:8 with 20mm nominal size aggregate in F&P (HSR No. 10.38)
10mm thick cement plaster cement sand in mortar 1:5
Washing, Brushing & scrubbing existing old lining for laying Cement Conc. M-15 (HSR No. 10.119)
Laying cement slurry 2mm thick over existing old tile lining (HSR No. 19.12)
Prov. & placing in position/design mix cement concrete for lining of grade M-15 with minimum cement contents 240 Kg/cum 75mm thick manually in curved portion & side slopes, mixing, transporting, vibrating smooth finishing curing of lining by water, striking of joints, the lined surface on side slopes including dewatering, pumping out of water caused by rain water required & machinery, watering & compacting side slopes, collecting debris & disposed off collected material outside the channel as per approved design and specifications
Centering & Shuttering for sides for coping (HSR No. 9.13)
Filling construction joints with special imperivous hot pour 12mm wide (HSR No. 19.17)
Dismantling of brick masonary in Cement/sand mortar (HSR No. 8.5-b)
Dismantling RCC pipe 600 mm (HSR 8.35 b)
Dismantling CC 1:2:4 (HSR 8.6 d)
Providing, lowering, laying, cutting (cut surface to be uniformity finished) jointing with rubber rings marked with IS:5382 and testing of SPIGOT AND SOCKETTED RCC NP-3 MARKED WITH IS:458-1988 900mm dia and specials into trenches for all depths including carriage, loading, unloading, stacking, handling, re-handling etc. complete in all respects to the satisfaction to the Engineer-in-Charge. (HSR Item No. 29.96 viii)
RCC 1:1.5:3 with stne agg. 20mm ominal size for RCC work in slab with inclination not exceeding 25 degree with horizontal excluding steel reinforcement but including centering shuttering laid in position complete in all respect (HSR No. 10.82+10.95-a)
Cold twisted deformend bars for RCC works were not included in the complete rate of RCC including bending, binding and placing position compete (HSR 18.22)
First class brick work laid in cement sand marter 1:3 in foundation and plinth (HSR 11.5)
Cement Plaster 12 mm thick 1:5 for repair of pucca structure ( HSR 15.6)
Cement conc. 1:2:4 with stone agg. 20mm nominal size in F&P (HSR No. 10.41)
Finishing walls with exterior decorative cement based paints such as snocem robbisem etc on new work 2 coat to given an even shade (HSR No. 16.61)
Letter writing on Syphon/Bridge/Drainage crossing etc. height /cm /letter (HSR No. 16.66-b)
Dry brick on edge paving sand grouted over 50mm thick earth & mud plaster (HSR No. 14.20)
Providing, lowering, laying, cutting (cut surface to be uniformity finished) jointing with rubber rings marked with IS:5382 and testing of SPIGOT AND SOCKETTED RCC NP-3 MARKED WITH IS:458-1988 600mm dia and specials into treches for all depths including carriage, loading, unloading, stacking, handling, re-handling etc. complete in all respects to the satisfaction to the Engineer-in-Charge. (HSR Item No. 29.96)
Providing and fixing CI double flanged sluice valves PN 1.6 marked with IS: 14846 including nuts & bolts marked with IS:1363, Ruber sheet marked with IS:638 etc, carriage, loading, unloading stacking handling Re-handling etc. complete in all respect to the specification of engineer-in-chief (Make –AARKO, VENUS, LEADER, SI, PANJA, UPADHAY) complete in all respect 350mm i/d
Credit of brick/brick bats from dismantling brick/tile lining (Rate below DTR for credit items will not be acceptable)
Credit of old pipe 600mm from dismantalling of syphon (Rate below DTR for credit items will not be acceptable)
AJIT SINGH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .