Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹42.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹46.4 L+₹3.6 L (8.52%)Admitted-Fee/PreQual/Technical/Finance VILL GUNJABALA PO BADAKHAIRAKHAMA PS KODALA DIST GANJAM PIN 761035 | KODALA | GANJAM | ODISHA | 761035 | +8.52% | ₹46.4 L+₹3.6 L (8.52%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹42,782
Closing Date
19 Aug 2026, 5:00 pmClosed
Commissioner, Brahmapur Municipal Corporation
Brahmapur Municipal Corporation, Brahmapur
Construction and Renovation of First Floor Cooperative Urban Bank, Berhampur under BeMC
2026_ORULB_137887_11
BMC(BAM)/331/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
BRAHMAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹42,782
Yes
24 Aug 2026
4 Aug 2026
20 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
4 Aug 2026 - 12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in exavation of foundation all kinds of soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect | 12.24 | Cum | 291.75 | ₹3,569.56 |
| 2 | Supplying & filling foundation and plinth with course sand well watered and rammed including cost, cost of all labour, carriage, royalty, etc complete. | 0.67 | Cum | 1,553.39 | ₹1,039.22 |
| 3 | C.C (1:4:8) with 4cm size HG CRUSHER BROKEN metal including all cost, conveyance,royalty & taxes etc.comp.to work site as per specification approved by the department & direction of E.I.C | 0.67 | Cum | 5,748.17 | ₹3,845.53 |
| 4 | 2.50 cm thick grading concrete using C.C. (1:2:2) with 6mm sizes down graded H.G. chips on new work FIRST FLOOR | 314.75 | sqm | 431.61 | ₹1,35,847.09 |
| 5 | R.C.C work of M-25 grade with 20mm & down grade BHG C/B chips including hoisting, laying & all cost, conveyance, royalty & taxes etc. comp. to work site as per the specification approved by the deptt. & direction of EIC
FOUNDATION & PEDASTAL | 1.78 | cum | 6,983.92 | ₹12,424.39 |
| 6 | COLUMN, PEDASTAL TO PLINTH | 2.14 | cum | 17,057.76 | ₹36,520.66 |
| 7 | PLINTH BEAM | 0.49 | cum | 7,751.88 | ₹3,790.67 |
| 8 | COLUMN & BEAM GROUND FLOOR | 1.13 | cum | 17,057.76 | ₹19,189.98 |
| 9 | COLUMN & BEAM FIRST FLOOR | 28.48 | cum | 21,008.74 | ₹5,98,349.92 |
| 10 | COLUMN & BEAM SECOND FLOOR | 1.12 | cum | 23,992.69 | ₹26,967.78 |
stage.html
html • 0.02 MB
finance_604613.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
DTCN.pdf
Tender Documents • 1.63 MB
BOQ_604613.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .