Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Justified rate quoted. |
| 2 | L2₹1.8 Cr+₹3.1 L (1.79%)Rejected-Finance | ₹1.8 Cr+₹3.1 L (1.79%) | L2 | Rejected-Finance Highly rate quoted than L1. |
| 3 | L3₹1.8 Cr+₹6.8 L (3.93%)Rejected-Finance | ₹1.8 Cr+₹6.8 L (3.93%) | L3 | Rejected-Finance Highly rate quoted than L1. |
| 4 | L4₹1.8 Cr+₹7.1 L (4.10%)Rejected-Finance | ₹1.8 Cr+₹7.1 L (4.10%) | L4 | Rejected-Finance Highly rate quoted than L1. |
| 5 | L5₹1.9 Cr+₹21.1 L (12.1%)Rejected-Finance WARD NO 08 BRAHMA NAGAR UDAIPURA RAISEN | UDAIPURA | RAISEN | MADHYA PRADESH | ₹1.9 Cr+₹21.1 L (12.1%) | L5 | Rejected-Finance Highly rate quoted than L1. |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
10 May 2023, 5:30 pmClosed
EXECUTIVE ENGINEER, P.W.D. DN. NARMADAPURAM.
EXECUTIVE ENGINEER, P.W.D. DN. NARMADAPURAM.
Construction of Punoor to Pachuwa road, Length 1.90 Km. 1st Call, PAC Rs. 206.98 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 180 days i/c rainy season.
2023_PWDRB_272133_1
14/2023/e-Tender/N.Puram/Dated 28.04.2023
Open Tender
Civil Works - Roads
Percentage
180 days
PIPARIYA DISTT. NARMADAPURAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹2.1 L
11 Oct 2023
29 Apr 2023
12 May 2023
29 Apr 2023
10 May 2023
29 Apr 2023
eProcurement System Government of Madhya Pradesh Created By: PAWAN SAXENA Created Date/Time: 12-May-2023 06:49 PM Tender Title: Construction of Punoor to Pachuwa road, Length 1.90 Km. 1st Call, PAC Rs. 206.98 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 180 days i/c rainy season. Tender ID: 2023_PWDRB_272133_1
Tender Inviting Authority: Executive Engineer, P.W.D. Division Narmadapuram.
Name of Work :- Construction of Punoor to Pachuwa road, Length 1.90 Km. 1st Call, PAC Rs. 206.98 Lacs on Road & Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 180 days i/c rainy season.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SANJAY PALIYA CONTRACTOR(GSTN-23BOFPP0435J1Z3) 20698000.00 -12.80 18048656.00 One Crore Eighty Lakh Fourty Eight Thousand Six Hundred and Fifty Six
2.00 ADITYA CONTRUCTION(GSTN-23BFTPP5590R2Z9) 20698000.00 -16.10 17365622.00 One Crore Seventy Three Lakh Sixty Five Thousand Six Hundred and Twenty Two
3.00 PALIYA ENTERPRISES(GSTN-23CQUPP0890H2ZC) 20698000.00 -14.60 17676092.00 One Crore Seventy Six Lakh Seventy Six Thousand Ninty Two
4.00 U S INFRA PROJECT(GSTN-NA) 20698000.00 -12.66 18077633.20 One Crore Eighty Lakh Seventy Seven Thousand Six Hundred and Thirty Three
5.00 PRABHAKAR SHARMA CONSTRUCTION(GSTN-NA) 20698000.00 -5.92 19472678.40 One Crore Ninty Four Lakh Seventy Two Thousand Six Hundred and Seventy Eight
Lowest Amount Quoted BY: ADITYA CONTRUCTION(17365622.00)
BOQ Summary Details Tender Title: Construction of Punoor to Pachuwa road, Length 1.90 Km. 1st Call, PAC Rs. 206.98 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 180 days i/c rainy season. Tender ID: 2023_PWDRB_272133_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ADITYA CONTRUCTION 17365622.00 L1
2 PALIYA ENTERPRISES 17676092.00 L2
3 SANJAY PALIYA CONTRACTOR 18048656.00 L3
4 U S INFRA PROJECT 18077633.20 L4
5 PRABHAKAR SHARMA CONSTRUCTION 19472678.40 L5
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .