Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
21 Aug 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SITC of 2 Nos 160 KVA DG sets
6719144
GEM/2024/B/5231984
Two Packet Bid
Sub Head I Supply of Equipments,Sub Head II ITC of EA set with acoustic enclosure and AMF control p
90 days
Delhi; New Delhi
Total value wise evaluation
BOQ
4 documents required · 4 mandatory
3 yrs
₹3
₹1.2 L
21 Aug 2024
31 Jul 2024
21 Aug 2024
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Sub Head I Supply of Equipments | Supply of multi cylinder water cooled electric start Ready to Use directly coupled type DEA set confirming to CPCB IV norms in an acoustic enclosure along with AMF control panel capable of generating three phase, 415 V, 50 HZ, full load capacity of 160KVA 128 KW at site conditions with diesel engine of mini. 200 BHP at 1500 RPM compl. with all accessories as required as per attached specifications and consisting of the follow.
Diesel Engine 4 stroke, electric start of minimum 200 BHP at 1500 RPM suit. for below mention output of alternator and conf. to BS 5514, IS 3046 I, BS 6491, IS 10000. capable of taking 10 percent over loading for one hour after 12 hours of continuous operation.The engine will be fitted complete with all the reqd. accessories.
a. Manufacturer Model No. BHP
Cummins QSB67G21 206.8
Kirloskar 6K1080ETA4G1 200
The make of Engine Alternator shall be BSNL approved as per product list attached.
b. ENGINE SAFETY DEVICES
Engine stop solenoid, PROTECTIVE FEATURES LED indications, Alarm , LLOP, HCT HWT High Engine temp and High canopy temp, Low fuel level, Over under speed, Battery High Low Weak Volts, Emergency STOP Features Manual stop
c. Microprocessor based Digital DG set controller unit with LED backlit and graphic display or as provided by OEM for monitoring, metering and controlling
d. Starting System 12 V DC starting system consisting of Self starter with 02 number suitable batteries leads or as provided by OEM, Battery charging alternator
e. Exhaust System of suitable capacity as per ISO 22241
f. Alternator 3 Phase Synchronous alternator rated at 160 KVA, 415 volts at 1500 RPM, 3 phase 50 Hz, AC supply
g. Base Frame Both the engine and alternator shall be directly coupled mounted on suitable base frame
h. Fuel Tank Daily service fuel tank with 385 Ltr. Capacity complete as per specifications
Items are as per schedule of work item no. 1 of Sub Head I | 2 | Nos | Vikas Anand 110001,Eastern Court, Janpath, New Delhi | 90 |
| 2 | Sub Head II ITC of EA set with acoustic enclosure and AMF control panel | Installation, testing and commissioning of the above EA set with acoustic enclosure and AMF control panel Item No.1 with all equipments, accessories and associated items on the existing elevated plinth elevated structure foundation, connections of existing Body and Neutral earth, cable termination including supplying consumables like lube oil, fuel and providing artificial resistive load with cabling, switching arrangements. etc. for pre acceptance testing i.e., 12 hours full load, 1 hour 10 percent overload and 1 hour at no load and final Acceptance Testing of EA set i.e. running of EA set on full load for 6 hours and running on 10 percent overload for 1 hour including topping up of lube oil up to full mark and filling of extra fuel up to a level suitable for 2 hours full load working etc. as per specifications as required.
Note Minor civil works such as cutting of floor or breaking of wall for laying of fuel pipes making supports to exhaust pipes shall be within the scope of the contractor without any extra cost
Items are as per schedule of work item no. 2 of Sub Head II | 2 | Job | Vikas Anand 110001,Eastern Court, Janpath, New Delhi | 90 |
| 3 | Sub Head II SITC of extra exhaust pipe | SITC of extra exhaust pipe as per the CPCB norms with insulation & cladding, fabrication of suitable support made of MS structure, clamping with nut & bolts, vibration isolators complete as required.
Items are as per schedule of work item no. 3 of Sub Head II | 12 | Metre | Vikas Anand 110001,Eastern Court, Janpath, New Delhi | 90 |
| 4 | Sub Head III AMC During 1st Year of warranty period | Comprehensive Preventive Breakdown Maintenance of above 2x160 KVA EA set with all its associated items by deploying specialized man power, supplying and fixing required spares, tools and plant etc., to keep all the equipments healthy and operational including scheduled maintenance as per manufacturer recommendations as per the specification attached. Note The Rate Quoted shall be for 2Nos 160KVA sets together.
During 1st Year of warranty period for consumables only under warranty
Items are as per schedule of work item no. 4 a of Sub Head III | 1 | Year | Vikas Anand 110001,Eastern Court, Janpath, New Delhi | 90 |
| 5 | Sub Head III AMC During 2nd Year of warranty period | During 2nd Year of warranty period for consumables only under warranty
Items are as per schedule of work item no. 4 b of Sub Head III | 1 | Year | Vikas Anand 110001,Eastern Court, Janpath, New Delhi | 90 |
| 6 | Sub Head III AMC During 1st Year of AMC after warranty period | During 1st Year of AMC after warranty period.
Items are as per schedule of work item no. 4 c of Sub Head III | 12 | Month | Vikas Anand 110001,Eastern Court, Janpath, New Delhi | 90 |
| 7 | Sub Head III AMC During 2nd Year of AMC after warranty period. | During 2nd Year of AMC after warranty period.
Items are as per schedule of work item no. 4 d of Sub Head III | 12 | Month | Vikas Anand 110001,Eastern Court, Janpath, New Delhi | 90 |
| 8 | Sub Head III AMC During 3rd Year of AMC after warranty period | During 3rd Year of AMC after warranty period.
Items are as per schedule of work item no. 4 e of Sub Head III | 12 | Month | Vikas Anand 110001,Eastern Court, Janpath, New Delhi | 90 |
| 9 | Sub Head III AMC During 4th year of AMC after warranty period | During 4th year of AMC after warranty period.
Items are as per schedule of work item no. 4 f of Sub Head III | 12 | Month | Vikas Anand 110001,Eastern Court, Janpath, New Delhi | 90 |
| 10 | Sub Head III AMC During 5th year of AMC after warranty period | During 5th year of AMC after warranty period.
Items are as per schedule of work item no. 4 g of Sub Head III | 12 | Month | Vikas Anand 110001,Eastern Court, Janpath, New Delhi | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_6719144.pdf
GEM_BID
atc_2024-07-31-15-56-46_76e91fd1da93c7ba2aea93600fa838f3.pdf
BOQ
boq_item_sample_file_2024-07-31-15-56-46_95975af97adb697f50f50d8cf6250139.csv
BOQ
1722422595.xlsx
OTHER
ATC_4b760335-c27f-4af7-a78c1722422841861_sanjaygaur@bsnl.co.in.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .