| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAccepted-AOC | ₹4.0 Cr | L1 | Accepted-AOC Tender Awarded |
| 2 | L2₹4.8 CrRejected-Finance | ₹4.8 Cr | L2 | Rejected-Finance Financial Bid rejected being higher rate |
| 3 | L3₹5.5 CrRejected-Finance | ₹5.5 Cr | L3 | Rejected-Finance Financial Bid rejected being higher rate |
| Sl No | Description | Qty | Unit | m/s Sandeep shukla L1 | M/s Raj Laxmi Enterprises L2 | AMBE INFRAPROJECTS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately.
(Including labour Cess & Excluding GST) | 189 | Cum | 410.85 ₹77,650.65 | 550 ₹1.0 L | 550 ₹1.0 L |
| 2.00 | Construction of Embankment and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 (Carted Earth)
(Including labour Cess & Excluding GST) | 1,480 | Cum | 134.46 ₹2.0 L | 150 ₹2.2 L | 200 ₹3.0 L |
| 3.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.
(Including labour Cess & Excluding GST) | 2,268 | Cum | 42.21 ₹95,722.07 | 50 ₹1.1 L | 60 ₹1.4 L |
| 4.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401(B)
(Closed Graded Grade-1)
(Including labour Cess & Excluding GST) | 1,480 | Cum | 2,420.28 ₹35.8 L | 2,950 ₹43.7 L | 3,600 ₹53.3 L |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
(Including labour Cess & Excluding GST) | 2,960 | Cum | 2,636.91 ₹78.1 L | 3,150 ₹93.2 L | 3,800 ₹1.1 Cr |
| 6.00 | Primer coat with SS-2 Grade bitumen Emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
(Including labour Cess & Excluding GST) | 18,000 | Sqm | 28.76 ₹5.2 L | 35 ₹6.3 L | 40 ₹7.2 L |
| 7.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
(DBM Grade-1)
(Including labour Cess & Excluding GST) | 1,800 | Cum | 7,186.14 ₹1.3 Cr | 9,000 ₹1.6 Cr | 9,800 ₹1.8 Cr |
| 8.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder(VG-40) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
(DBM Grade-2)
(Including labour Cess & Excluding GST) | 900 | Cum | 7,746.39 ₹69.7 L | 9,700 ₹87.3 L | 10,600 ₹95.4 L |
| 9.00 | Providing and applying tack coat with bitumen (VG-10) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
(Including labour Cess & Excluding GST) | 18,000 | Sqm | 8.59 ₹1.5 L | 11 ₹2.0 L | 11.5 ₹2.1 L |
| 10.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.
(BC Grade-2)
(Including labour Cess & Excluding GST) | 720 | Cum | 8,859.42 ₹63.8 L | 11,000 ₹79.2 L | 12,050 ₹86.8 L |
Tender Value
₹5.4 Cr
EMD Value
₹10.8 L
Closing Date
28 Jan 2026, 12:00 pmClosed
SE Unnao Circle PWD Unnao
SE Unnao Circle PWD Unnao
Widening and Strengthening of Purwa Mirrikala Bhagwantnagar Doodhikagar road SH 165 from Ch 68.875 to Ch 70.675 in district Unnao with five year maintenance
2026_CEUCZ_1107829_1
171MT/1MT/E-Tender/UC/25 Dt. 12-01-2026
Open Tender
Civil Works
365 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹10.8 L
Yes
SE Unnao Circle PWD Unnao
27 Feb 2026
20 Jan 2026
28 Jan 2026
20 Jan 2026
28 Jan 2026
20 Jan 2026
20 Jan 2026
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately. (Including labour Cess & Excluding GST)
Construction of Embankment and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 (Carted Earth) (Including labour Cess & Excluding GST)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. (Including labour Cess & Excluding GST)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401(B) (Closed Graded Grade-1) (Including labour Cess & Excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including labour Cess & Excluding GST)
Primer coat with SS-2 Grade bitumen Emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including labour Cess & Excluding GST)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (DBM Grade-1) (Including labour Cess & Excluding GST)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder(VG-40) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (DBM Grade-2) (Including labour Cess & Excluding GST)
Providing and applying tack coat with bitumen (VG-10) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including labour Cess & Excluding GST)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (BC Grade-2) (Including labour Cess & Excluding GST)
Providing & laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35 The finished surface to be lever, uniform and free streaks & holes. (Including labour Cess & Excluding GST)
Maintenance of Constructed Road for next Five Year after the actual date of completion,Total maintenace Cost 2.50% of BOQ shall be paid in the form of installment as below,The payment shall be the inclusive of cess but Excluding GST,Payment shall be done as per satisfaction of Engineer-in-Charge regarding maintenance work carried out by Contractor. (i) From Completion of 1 Year to 2nd Year 0.25% of Bill Amount.
(ii) 2nd Year to 3rd Year 0.50% of Bill Amount.
(iii) 3rd Year to 4th Year 0.75% of Bill Amount.
(iv) 4th Year to 5th Year 1.00% of Bill Amount.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.02 MB
Tendernotice_2.pdf
PDF • 9.14 MB
SBD1.pdf
Additional Documents • 6.36 MB
SBD2.pdf
Additional Documents • 0.72 MB
BOQ_2044788.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid