Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Fee/PreQual/Technical/Finance | -35.00% | ₹2.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.6 L+₹3,437.84 (1.35%)Admitted-Fee/PreQual/Technical/Finance | -34.12% | ₹2.6 L+₹3,437.84 (1.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.7 L+₹15,719.20 (6.17%)Admitted-Fee/PreQual/Technical/Finance | -30.99% | ₹2.7 L+₹15,719.20 (6.17%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.8 L+₹23,476.88 (9.21%)Admitted-Fee/PreQual/Technical/Finance | -29.01% | ₹2.8 L+₹23,476.88 (9.21%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.8 L+₹24,696 (9.69%)Admitted-Fee/PreQual/Technical/Finance | -28.70% | ₹2.8 L+₹24,696 (9.69%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
EMD Value
₹11,760
Closing Date
20 Aug 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
C/O ROAD FROM MAIN ROAD TO BONDAL 803
2026_RDPR_319485_16
e- NIT No. 54 OF REWK/PRI/2026-27 Dated 05-08-2026
Open Tender
Civil Works
Percentage
45 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
EX ENGINEER REW KULGAM
₹11,760
4 Sept 2026
5 Aug 2026
22 Aug 2026
5 Aug 2026
20 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m
in width as well as10 sqm on plan including disposal of excavated earth,
leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil : | 85.4 | sqm | - | - |
| 2 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | 24.84 | cum | - | - |
| 3 | P/L Nallah stone solling hand packed and GSB including all carriages.and Plums.complete job | 95 | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)including all carriages. | 0.89 | cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)including all carriages. | 34.6 | cum | - | - |
| 6 | Formwork of ordinary timber planks for in situ concrete work all complete. | 89 | sqm | - | - |
| 7 | Reinforcement for RCC work including cutting bending binding and placing in position all complete. | 82 | kgs | 1 | ₹81.92 |
| 8 | carriage of sand/aggregates by Mt and H/L | 48.26 | cum | - | - |
| 9 | photograph /signboard charges(2.5X2.5)size | 1 | job | 0.6 | ₹0.6 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1058472.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .