Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
20 Feb 2026, 2:00 pmClosed
Executive Engineer, P.W.Division, Nashik
Executive Engineer Public Works Division Nashik Bhandkam Bhawan Trimbak Road Nashik Tal. Dist. Nashik Tel. No.- 0253-2583761-64 2575324
E-Rate Quotation of Non DSR Items for Preparation of Estimate for the Verious Works for Roads, buildings, parking arrangements and other alied works under Sinhastha 2026-27 at Nashik District
2026_PWR_1275945_1
e-Quotation Notice No.07 for 2025-26
Open Tender
Miscellaneous Works
Item Rate
30 days
Dist. Nashik
As Per NIT
3 documents required · 3 mandatory
₹0
Exempted
23 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Water Logging Stoppage Concrete pavement block -Providing and Laying water sepage concrete is a specialized process that differs from conventional concrete factory made Water Logging Stoppage Sustainable Pavement blocks of required strength, thickness & size/shape, Typically requires digging 300 mm to 450 mm deep depending on expected loads. 60-100 MM thickness Base Layer: Install 150 mm to 300 mm of open-graded crushed stone (20 mm to 40 mm size). This acts as a reservoir for water. Bedding Layer: Add a 25 mm to 50 mm layer of smaller clean aggregate (e.g., 5 mm to 10 mm crushed stone) to create a level surface for the tiles.Laying: Place pervious tiles snugly against each other. For structural stability, use edge restraints like concrete curbs or specialized metal edging to prevent the tiles from shifting horizontally. Alignment: Check levels frequently with a straightedge. Unlike regular tiles, you do not need a slope for drainage since water goes through the surface.Stormwater Management: Acts as an on-site retention basin, reducing the need for costly detention ponds or large storm sewers. Environmental Impact: Filters pollutants (hydrocarbons, heavy metals) from runoff and helps mitigate the Urban Heat Island (UHI) effect by allowing the ground to "breathe". Safety: Reduces hydroplaning, tire spray, and glare at night by eliminating standing water. Tree Health: Allows water and air to reach tree root systems in paved urban environments as per manufacturer specifications & direction of Engineer-in-Charge.
Movable Precast toilet Pods-Precast concrete toilet pods are pre-manufactured, self-contained toilet or bathroom units made from high-grade reinforced cement concrete (RCC), which are transported to the construction site for rapid installation. They offer a durable, efficient, and customizable alternative to traditional on-site constructionMaterial: Primarily Reinforced Cement Concrete (RCC).Built Type: Modular and prefabricated, allowing for off-site manufacturing and quick assembly on-site.Precast Concrete Structure: The toilet pod itself is made from high-grade reinforced cement concrete (RCC), providing a robust, long-lasting, and weather-resistant cabin. The pre-manufacturing process ensures quality control and rapid on-site installation.Outputs: The process produces two main byproducts: Treated Water (Effluent): The liquid effluent is odorless, colorless, and largely pathogen-free, making it safe for non potable uses like irrigation and gardening. Durability and Resistance: The high-grade concrete ensures robustness, weather resistance, and low maintenance. They are also waterproof, with factory-applied membranes to prevent leaks and dampness. Integrated Systems: Pods come with pre-installed and pre-tested plumbing, electrical fittings, and ventilation systems, requiring only final hook-ups on-site. Finish: Fully finished interiors, including sanitaryware, tiling, lighting, mirrors, doors, and windows, designed according to customer specifications. Dimensions: Available in a wide range of sizes and designs, from single-seater units 2350x1500x2480 mm to multi-compartment blocks. Weight: The weight of a precast concrete pod is generally comparable to a traditionally built bathroomEco-Friendly: The system prevents the contamination of groundwater, rivers, and lakes by treating waste on-site and producing valuable byproducts instead of harmful sewage. Off-Grid Solution: It eliminates the need for expensive and complex conventional sewage lines, making it ideal for remote areas, construction sites, and public spaces. Low Maintenance: The bacterial consortium is self-sustaining and generally does not require repeat dosing, resulting in a low-maintenance system with no recurring operational costs for emptying the tank like traditional septic systems. Odorless Operation: The anaerobic digestion process happens in a sealed environment, which is virtually odor-free, a significant advantage over conventional septic tanks.
Natural system For Rain water, Drainge and Water flow -RWH-ShallowPercolation Pit providing, constructing 2.0mdeep shallowdepth percolationpit comprisingof 1.0mdiapre-castRCCrings, 300mmthickside filling around outside of RCC rings (annular space with40mm sizeboulder sincludingfillingof percolationpitupto 0.5mdepth(frombottomup with25-75mm cleanwashedgravelsfollowedby0.5mdepthof10-25mmofcleanwashedstonesfollowedby0.5mofwashed river fine aggregateincluding netlonmesh between eachgravel/fineaggregate(natural sand/crushed sand VSI grade finelywashed etc.)media layer including covering with RCC slab, manhole frame & cover, PVC rungs etc. includingarrangement for inlet&outletpipe,excavation&back filling as shown in the drawing.Boring/drilling bore well of 300mm dia for casing/ strainer pipe, by suitable methodprescribedinIS:2800(part I), includingcollectingsamplesfromdifferentstrata, preparingand submitting strata chart/ bore log, including hire&running charges of all equipments, tools, plants&machinery required for the job, all complete as per direction of Engineer in charge, upto 90m depth below ground level SOLAR MUDULE SUBMERCIBLE MONOBLACK 2 - 5 HP Water Discharge Capacity 3 INCH Pump Head 250 meter Solar Street Lighting Road lighting,Farmhouses,Pathway
Using M35 grade concrete and Fe 500 TMT bars offers a robust combination ideal for high-quality precast retaining walls. L-shaped or T-shaped units. According to precast.org, using concrete with strengths in excess of 4,000 psi (around 28 MPa) is recommended for durability and to avoid damage during handling, making M35 (which is 35 MPa) an excellent choice. A low water-cement ratio for this grade helps reduce permeability and improves overall durability.Strength: Fe 500 TMT bars have a minimum yield strength of 500 N/mm², providing superior structural strength and load-bearing capacity suitable for commercial complexes, bridges, and flyovers.Ductility & Earthquake Resistance: The dual microstructure (tough outer layer, soft inner core) provides a good balance of strength and ductility, which is essential for absorbing seismic energy and preventing sudden, brittle collapse in earthquake-prone area. Better Bonding: The ribbed surface of TMT bars ensures a superior grip and better load transfer with the concrete, preventing slippage and enhancing overall structural integrity- 2m height
4 m Height
6 m Height
Making a documentary requires a blend of creative vision, technical tools, and rigorous logistical planning.Preproduction, Production, and Post-production. Essential Gear Requirements While high-end equipment is helpful, the story often outweighs the gear. A standard kit includes: Camera: DSLRs, mirrorless cameras, or even smartphones are suitable. Portability is key for on-the-fly shoots. Audio Equipment: Audiences are less forgiving of poor sound than poor video. Use lavalier microphones for interviews and a backup boom mic. Lighting: Portable LED kits or natural light are essential for adding depth to visuals. Stabilization: Use tripods, monopods, or gimbals (like the DJI Osmo) to ensure stable footage. Production Planning Research & Treatment: Deep research adds character and uncovers hidden storylines. A written treatment acts as a roadmap for funders and crew. Shot List: Categorise your shots into A-Roll (primary footage/interviews) and B-Roll (supplemental footage used to illustrate the story and cover transitions). Budgeting: Factor in travel, crew salaries, equipment rentals, and post-production costs. Many filmmakers use tools like the Documentary Budget Template. Styles of Documentary Choosing a "mode" dictates your filming requirements: Expository: Focuses on a strong argument or viewpoint, often using a "Voice of God" narrator. Observational (Cinema Vérité): The camera acts as a "fly on the wall," capturing events without interference. Participatory: The filmmaker interacts directly with the subjects - Documentaries films
Tele- films
Add films – 30-60sec of Tv channels
Theatre films
Beautification of parks, impotence’s places like bridges designing and painting Beautifying parks and urban infrastructure like bridges transforms functional spaces into vibrant community hubs. Modern projects focus on integrating artistic design, interactive elements, and sustainable landscaping to enhance city aesthetics. Creating small, "vest-pocket" parks (1/4 acre or less) in dense urban areas using innovative Idea with native vegetation and modern furniture.Installing sculptures made from scrap materials or creating Enhancing the evening charm with multi-colored LED lights Park Beautification Strategies
Bridge Design and Painting Wall and Pillar Murals: Embellishing overpasses and railway bridge pillars with vibrant wall painting to turn concrete eyesores into extraordinary landmarks.Structural Aesthetics: Designing bridges with upward-cambered soffits and haunched girders to ensure visually Pleasure Underpass Reclamation: Transforming dark spaces under bridges dedicated areas for public art and festivalsColor as Focal Point: Using bold colors Small Bridge
Medium Bridge
Large Bridge
River Cleaning by Mechanized River Cleaning Machine on Rental basis: proposal for introducing a mechanized river cleaning solution for effective and continuous cleaning of the Godavari River during the Nashik Trimbakeshwar Kumbh Mela. Maintaining the purity, cleanliness, and ecological health of the river during such a large-scale religious event is of paramount importance. propose deploying a fully mechanized River Cleaning Machine (Trash Skimmer Boat) designed to collect floating garbage and flotsam efficiently without disturbing pilgrims or river flow. large quantities of floating waste such as flowers, puja materials, plastic waste, cloth, and other biodegradable and non-biodegradable materials are generated. Manual cleaning alone becomes insufficient, and therefore mechanized cleaning is essential for continuous and visible cleanliness.The machine operates directly on the water surface and transfers collected waste to designated unloading points on the riverbank. The machine can be deployed on a rental or contract basis along with a trained operator and technical support, allowing the Authority to avoid capital expenditure while ensuring professional river maintenance throughout the Kumbh Mela period.
Precast box culverts are rigid, rectangular reinforced concrete structures used for drainage, underpasses, and utility tunnels. They are manufactured off-site in a controlled environment to ensure high strength, durability, and rapid installation compared to cast-in-place alternatives.Structural Components & Dimensions Joints: Typically utilize tongue and groove ends for precise interlocking.Wall Thickness: Generally ranges from 150 mm to 300 mm, depending on the load and span requirements. Haunches: Often include corner splays (haunches) of 150 mm to 225 mm to enhance structural integrity at the joints Concrete Reinforcement: Uses welded wire fabric (WWR) or conventional Fe500D/Fe550D rebar. Grade: Typically uses high-strength concrete such as M30 Bedding: Usually laid on a 150 mm to 200 mm layer of compacted granular material or a lean concrete blinding layer.Lifting: Sections include cast-in lifting anchors or pins for safe handling by cranes. Follows IRC:122-2017 (Standard Specifications for Precast Concrete Segmental Box Culverts) and IRC:SP:13. SIZE PRECAST BOX CULVERT SIZE 2 M X 1.5 M
Prefabricated SEWAGE TREATMENT PLANT A. PRIMARY TREATMENT: 1. BAR SCREEN CHAMBER: 2. OIL AND GREASE TANK: 3. EQUALIZATION TANK: B. SECONDARY TREATMENT: 1. MBBR TANK: 2. TUBE SETTLER TANK: C. TERTIARY TREATMENT: 1. FILTER FEED TANK: Filter Feed Tank is provided to pass the Treated sewage water further through tertiary treatment comprised of filtration with a Pressure Sand filter and activated Carbon Filter. 2. PRESSURE SAND FILTER: The Pressure Sand Filter helps to remove the suspended solids present in treated water. The Sand media removes the fine impurities through graded filter beds and then water is passed to the Activated Carbon Filter. 3. ACTIVATED CARBON FILTER: Activated Carbon Filter reduces the colour & odour and polishes the supernatant treated water through a carbon column design. The outlet from the Activated carbon filter is then collected in a Treated Water tank for further reuse. 4. CHLORINATION SYSTEM: Chlorination is a widely used process in water and wastewater treatment that involves adding chlorine or its compounds to disinfect and purify the water or wastewater. Chlorination is an effective and economical method of removing harmful pathogens and microorganisms from water and wastewater.D. SLUDGE HANDLING SYSTEM The sludge from the Tube Settler tank is to be removed from bottom of tank and transferred to the Sludge Holding Tank by pumping. Source of Sewage : Domestic Sewage Treatment Methodology : Primary Treatment is followed by Aerobic biodegradation (MBBR based) followed by Tertiary Treatment Treatment Objective : To use the water for purposes like gardening, irrigation, toilet flushing, etc. Plant Capacity for People : 300,Working hours : 20 Hours Average Flow : As per design
Pepole 500
Pepole 700
Pepole 1000
Pepole 1500
GAS BALLOONS FOR FUNCTION WITH PRINT OPTION -Helium – 12 fit dia it will go hight upto 250 fit various options for gas balloons with print, ranging from small custom party balloons to large promotional advertising ones. Many options are available for personalization with custom logos, messages, or photos. A 12-foot diameter helium balloon used for advertising is typically tethered and can be expected to reach a height of around 50 to 60 feet for practical, safe operation and visibility. Advertising balloons with print, such as the 12-foot diameter. Material: They are normally made of PVC or a rubber-like material, typically 0.20-0.25mm thick, which is weather-resistant and allows for vibrant digital printing.Printing: Digital printing is used for logos, slogans, and product graphics to ensure clarity and impact. Gas Use: They can be filled with either helium (safe, non-flammable) or hydrogen (more cost-effective, but highly flammable and not recommended for casual use). Structure: They come with anchoring points and a tether system for secure outdoor use.
Self-Sealing/Quick-Fill Balloons: These are the most popular and convenient type, allowing users to fill and automatically tie dozens of balloons in under a minute by connecting a pre-assembled bunch to a standard tap or hosepipe via an included adapter.
Inflatable balloons are versatile items made from various materials like latex, foil (Mylar), and durable PVC, used for everything from small party decorations to large-scale commercial advertising and even scientific research. They can be filled with air or lighter-than-air gases like helium
Latex Balloons: These are the traditional, everyday party balloons made from natural rubber latex. They are stretchy, come in a wide range of colors and sizes, and are biodegradable
Foil (Mylar) Balloons: These balloons are made from a thin, non-stretchable, metallic-coated plastic film (like nylon or Mylar). They have a shiny appearance and can be shaped into letters, numbers, characters, and intricate designs
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.58 MB
Notice07nd.pdf
Tender Documents • 2.57 MB
BOQ_2195823.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .