Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1L1L1₹5.1 CrAccepted-AOC | ₹5.1 Cr Quoted ₹3.4 Cr | L1L1L1 | Accepted-AOC Bidder was called in the meeting of ULHPPC |
| 2 | L2L2L2₹3.9 Cr+₹44.7 L (13.0%)Rejected-AOC 28 A KG MARG CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | ₹3.9 Cr+₹44.7 L (13.0%) | L2L2L2 | Rejected-AOC Bidder was not called in the meeting of ULHPPC |
| 3 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹14.4 L
Closing Date
4 Feb 2022, 5:00 pmClosed
SE Purchase
Shakti bhawan panchkula
REPAIR OF EHV TRANSFORMER OF 220kV CLASS AND 100 MVA CAPACITY
2021_HBC_195173_1
QDP-1342_NIT-1225 dated 08.11.2021
Open Tender
Electrical Works
Works
180 days
any where in haryana
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
₹14.4 L
Yes
4 Jul 2022
10 Nov 2021
17 Feb 2022
10 Nov 2021
4 Feb 2022
11 Nov 2021
Repairing of EHV Transformers of 220kV class and 100 MVA capacity. (100MVA, 220/33kV)
PART - A (FIXED CHARGES) Labour Charges for (a) Preliminary joint inspection of T/F at site
Labour Charges for (b) Charges for minor repair of any part at site
(a) Labour charges for Joint inspection at the works of bidder to decide about extent and assessment of repairs etc., including opening of T/F cover, draining of oil, if any, detanking core and coil assembly assessment and estimation for repairs.
(b) Labour charges for replacement of damaged parts, minor repair of any part. Including core and tank, cleaning washing of dust & dirt etc. from all parts including core, tank, cooling tubes of radiators, removal of damaged parts requiring replacement, fitting, fixing of new parts, making connection and assembly complete in all respect, retanking after repairs, filling fresh transformer oil, making transformer ready for test and testing for all test as specified in technical specification.
Transportation: Transportation/carriage of transformer from HVPNL site to bidder works and thereafter returning the transformer to anywhere Haryana including packing of bushing etc. plus transit insurance, insurance during repair and 45 days after return of transformer against all repairs.
Loading at one place and un-loading at any other place (To & Fro)
Painting inside and outside of transformer including radiators, tubes, conservator with suitable primer and two coat of grey color and marking etc. as per clause 16 & 17 of Technical Specification
Set of Gasket as per clause 18.2 of Technical Specification..
Sundry charges as per clause 3.2 of Technical Specification.
Labour charges of joint inspection at contractor works for transformer if found un-economical for repairs
PART - B (VARIABLE CHARGE) Supply of new spare parts for replacement of damaged parts. HV leg coils complete with insulations, varnishing by vacuum impregnation (if required as per sample) and leaking of oil assembly.
LV leg coils complete with insulations, varnishing by vacuum impregnation (if required as per sample) and leaking of oil assembly.
HV/LV/Neutral bushings as per Clause 18.3 of Technical Specification. 220 KV Bushing
33 KV Bushing
Neutral Bushing for HV
Neutral Bushing for LV
Metal parts of bushings 220KV bushing metal parts
33 KV bushing metal parts
HV Neutral bushing metal part
LV Neutral bushing metal part
Silica Gel Breather of main conservators tank
Silica Gel Breather of OLTC conservators tank
Magnetic type oil level gauge with low level alarm contact for main conservator.
Double float buchholz relay complete with alarm and contacts for main tank
Oil surge relay for OLTC
PRV 6 inch diameter for main tank
PRV for OLTC tank
Drain/Filter/Sampling valve of main tank ½” valve
1” valve
1½” valve
2” valve
3” valve
Radiator valve
Capillary type temperature gauges precimeasure or equivalent make OTI with two mercury contacts
WTI with four mercury contacts
Providing core laminations as per clause 8.0 of Technical Specification.
Providing new radiators as per original design
Oil flow indicator
Cooling fan of reputed make
Oil circulating pump of reputed make
Marshaling Box
RTCC Panel
CT for winding temperature
Air cell (cops) in conservator tank
Fresh transformer oil of naphthenic base as per BS: 148 / IEC:296 class-1.
Overhauling of OLTC Replacement of OLTC with existing make or reputed make, if irrepairable.
If Repairable:- Drive motor
Motor arm assembly
Motor protection relay
Moving contact assembly
Fixed contact assembly
Main tank to OLTC barrier board Epoxy type
Phase barrier
Fuse & general writing (wiring)
Tap position indicator
If irrepairable:- Transition resistance
Epoxy arm
Limit switches
Auxiliary transformer
Gear assembly
Oil seal
Heat Run Test Charges
PART - C (SALVAGE) Burnt/Damaged leg coils to be retained by the contractor
Damaged metal parts of Bushing to be retained by contractor. Aluminum
Brass
Cooper
Transformer oil which to be drained out
Damaged/burnt CRGO core laminations
Valves different sizes.
Damaged radiator and other M.S. fabricated items
Part D : Charges for Special Test (Digree of polymerization)
Description of Work / Item(s)
Repairing of EHV Transformers of 220kV class and 100 MVA capacity. (100MVA, 220/66kV)
PART - A (FIXED CHARGES) Labour Charges for (a) Preliminary joint inspection of T/F at site
Labour Charges for (b) Charges for minor repair of any part at site
(a) Labour charges for Joint inspection at the works of bidder to decide about extent and assessment of repairs etc., including opening of T/F cover, draining of oil, if any, detanking core and coil assembly assessment and estimation for repairs.
(b) Labour charges for replacement of damaged parts, minor repair of any part. Including core and tank, cleaning washing of dust & dirt etc. from all parts including core, tank, cooling tubes of radiators, removal of damaged parts requiring replacement, fitting, fixing of new parts, making connection and assembly complete in all respect, retanking after repairs, filling fresh transformer oil, making transformer ready for test and testing for all test as specified in technical specification.
Transportation: Transportation/carriage of transformer from HVPNL site to bidder works and thereafter returning the transformer to anywhere Haryana including packing of bushing etc. plus transit insurance, insurance during repair and 45 days after return of transformer against all repairs.
Loading at one place and un-loading at any other place (To & Fro)
Painting inside and outside of transformer including radiators, tubes, conservator with suitable primer and two coat of grey color and marking etc. as per clause 16 & 17 of Technical Specification
Set of Gasket as per clause 18.2 of Technical Specification..
Sundry charges as per clause 3.2 of Technical Specification.
Labour charges of joint inspection at contractor works for transformer if found un-economical for repairs
PART - B (VARIABLE CHARGE) Supply of new spare parts for replacement of damaged parts. HV leg coils complete with insulations, varnishing by vacuum impregnation (if required as per sample) and leaking of oil assembly.
LV leg coils complete with insulations, varnishing by vacuum impregnation (if required as per sample) and leaking of oil assembly.
HV/LV/Neutral bushings as per Clause 18.3 of Technical Specification. 220 KV Bushing
66 KV Bushing
Neutral Bushing for HV
Neutral Bushing for LV
Metal parts of bushings 220KV bushing metal parts
66 KV bushing metal parts
HV Neutral bushing metal part
LV Neutral bushing metal part
Silica Gel Breather of main conservators tank
Silica Gel Breather of OLTC conservators tank
Magnetic type oil level gauge with low level alarm contact for main conservator.
Double float buchholz relay complete with alarm and contacts for main tank
Oil surge relay for OLTC
PRV 6 inch diameter for main tank
PRV for OLTC tank
Drain/Filter/Sampling valve of main tank ½” valve
1” valve
1½” valve
2” valve
3” valve
Radiator valve
Capillary type temperature gauges precimeasure or equivalent make OTI with two mercury contacts
WTI with four mercury contacts
Providing core laminations as per clause 8.0 of Technical Specification.
Providing new radiators as per original design
Oil flow indicator
Cooling fan of reputed make
Oil circulating pump of reputed make
Marshaling Box
RTCC Panel
CT for winding temperature
Air cell (cops) in conservator tank
Fresh transformer oil of naphthenic base as per BS: 148 / IEC:296 class-1.
Overhauling of OLTC Replacement of OLTC with existing make or reputed make, if irrepairable.
If Repairable:- Drive motor
Motor arm assembly
Motor protection relay
Moving contact assembly
Fixed contact assembly
Main tank to OLTC barrier board Epoxy type
Phase barrier
Fuse & general writing (wiring)
Tap position indicator
If irrepairable:- Transition resistance
Epoxy arm
Limit switches
Auxiliary transformer
Gear assembly
Oil seal
Heat Run Test Charges
PART - C (SALVAGE) Burnt/Damaged leg coils to be retained by the contractor
Damaged metal parts of Bushing to be retained by contractor. Aluminum
Brass
Cooper
Transformer oil which to be drained out
Damaged/burnt CRGO core laminations
Valves different sizes.
Damaged radiator and other M.S. fabricated items
Part D : Charges for Special Test (Degree of polymerization)
Description of Work / Item(s)
Repairing of EHV Transformers of 220kV class and 100 MVA capacity. (100MVA, 220/132kV)
PART - A (FIXED CHARGES) Labour Charges for (a) Preliminary joint inspection of T/F at site
Labour Charges for (b) Charges for minor repair of any part at site
(a) Labour charges for Joint inspection at the works of bidder to decide about extent and assessment of repairs etc., including opening of T/F cover, draining of oil, if any, detanking core and coil assembly assessment and estimation for repairs.
(b) Labour charges for replacement of damaged parts, minor repair of any part. Including core and tank, cleaning washing of dust & dirt etc. from all parts including core, tank, cooling tubes of radiators, removal of damaged parts requiring replacement, fitting, fixing of new parts, making connection and assembly complete in all respect, retanking after repairs, filling fresh transformer oil, making transformer ready for test and testing for all test as specified in technical specification.
Transportation: Transportation/carriage of transformer from HVPNL site to bidder works and thereafter returning the transformer to anywhere Haryana including packing of bushing etc. plus transit insurance, insurance during repair and 45 days after return of transformer against all repairs.
Loading at one place and un-loading at any other place (To & Fro)
Painting inside and outside of transformer including radiators, tubes, conservator with suitable primer and two coat of grey color and marking etc. as per clause 16 & 17 of Technical Specification
Set of Gasket as per clause 18.2 of Technical Specification..
Sundry charges as per clause 3.2 of Technical Specification.
Labour charges of joint inspection at contractor works for transformer if found un-economical for repairs
PART - B (VARIABLE CHARGE) Supply of new spare parts for replacement of damaged parts. HV leg coils complete with insulations, varnishing by vacuum impregnation (if required as per sample) and leaking of oil assembly.
LV leg coils complete with insulations, varnishing by vacuum impregnation (if required as per sample) and leaking of oil assembly.
HV/LV/Neutral bushings as per Clause 18.3 of Technical Specification. 220 KV Bushing
132 KV Bushing
Neutral Bushing for HV
Neutral Bushing for LV
Metal parts of bushings 220KV bushing metal parts
132 KV bushing metal parts
HV Neutral bushing metal part
LV Neutral bushing metal part
Silica Gel Breather of main conservators tank
Silica Gel Breather of OLTC conservators tank
Magnetic type oil level gauge with low level alarm contact for main conservator.
Double float buchholz relay complete with alarm and contacts for main tank
Oil surge relay for OLTC
PRV 6 inch diameter for main tank
PRV for OLTC tank
Drain/Filter/Sampling valve of main tank ½” valve
1” valve
1½” valve
2” valve
3” valve
Radiator valve
Capillary type temperature gauges precimeasure or equivalent make OTI with two mercury contacts
WTI with four mercury contacts
Providing core laminations as per clause 8.0 of Technical Specification.
Providing new radiators as per original design
Oil flow indicator
Cooling fan of reputed make
Oil circulating pump of reputed make
Marshaling Box
RTCC Panel
CT for winding temperature
Air cell (cops) in conservator tank
Fresh transformer oil of naphthenic base as per BS: 148 / IEC:296 class-1.
Overhauling of OLTC Replacement of OLTC with existing make or reputed make, if irrepairable.
If Repairable:- Drive motor
Motor arm assembly
Motor protection relay
Moving contact assembly
Fixed contact assembly
Main tank to OLTC barrier board Epoxy type
Phase barrier
Fuse & general writing (wiring)
Tap position indicator
If irrepairable:- Transition resistance
Epoxy arm
Limit switches
Auxiliary transformer
Gear assembly
Oil seal
Heat Run Test Charges
PART - C (SALVAGE) Burnt/Damaged leg coils to be retained by the contractor
Damaged metal parts of Bushing to be retained by contractor. Aluminum
Brass
Cooper
Transformer oil which to be drained out
Damaged/burnt CRGO core laminations
Valves different sizes.
Damaged radiator and other M.S. fabricated items
Part D : Charges for Special Test (Degree of polymerization)
ECE Industries Ltd.
ECE Industries Ltd.
ECE Industries Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .