Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹3.3 L+₹231.30 (0.07%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SRI SPS ASSOCIATES L1 | N S P ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | 1. Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers etc. completed. | 24 | m3 | 203 ₹4,872 Lowest | 204 ₹4,896 |
| 2.00 | 2. Plain cement Concrete in 1:4:8 mix (one cement, four sand,eight metal) using 40mm size Hard Broken stone as per the direction of departmental officers etc., complete | 2 | m3 | 5,590 ₹11,180 Lowest | 5,591 ₹11,182 |
| 3.00 | 3. Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 75 | m2 | 489 ₹36,675 Lowest | 490 ₹36,750 |
| 4.00 | 4. Reinforced Cement concrete 1:1.1/2:3 (one cement, one and half sand and three aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 14.5 | m3 | 9,373 ₹1,35,908.5 Lowest | 9,374 ₹1,35,923 |
| 5.00 | 5.Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 14.5 | Qtl | 9,321 ₹1,35,154.5 Lowest | 9,322 ₹1,35,169 |
| 6.00 | 6.Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specifications. | 0.3 | m³ | 6,963 ₹2,088.9 Lowest | 6,964 ₹2,089.2 |
| 7.00 | 7.Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications. | 9 | m2 | 292 ₹2,628 Lowest | 293 ₹2,637 |
| 8.00 | 8. Conveying excavated earth from the site to 2 km distance from the city limit including loading, unloading and transportation etc. complete. | 32 | m3 | 67 ₹2,144 Lowest | 69 ₹2,208 |
| 9.00 | 9.Desilting the existing drain with initial lead and initial lift as per the department officer | 3 | m3 | 97 ₹291 Lowest | 98 ₹294 |
| 10.00 | 10.Dismantling damaged cement concrete etc., completed. | 5 | m3 | 465 ₹2,325 Lowest | 470 ₹2,350 |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
16 Jul 2025, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Reconstruction of Storm Water Drain at Sathy road near Ragam Bakery in Ward No 10, North Zone.
2025_MAWS_580196_27
E2/NorthZone/2025-26
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹4,000
14 Oct 2026
14 Jul 2025
17 Jul 2025
14 Jul 2025
16 Jul 2025
14 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .