| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.6 LAccepted-AOC A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹98.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹99.6 LRejected-Finance | ₹99.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹1.0 CrRejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.0 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.0 CrRejected-Finance GRAM SAIDPUR KHURD TIKOLI DISTRICT BAGHPAT UTTAR PRADESH PIN CODE 250001 | BAGHPAT | BAGHPAT | UTTAR PRADESH | 250001 | ₹1.0 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.1 CrRejected-Finance | ₹1.1 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | ARTIST BRO L1 | M/S SUDHIR KUMAR CONTRACTOR L4 | Mukut Bihari Lal Contractor L7 | GOMATINETRA CONSTRUCTIONS L3 | M/S RAJPAL SINGH CONTRACTOR L2 | SIDDHARTHALAXMI ENGITECH PVT LTD L6 | mamber singh L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in all types of soil including all lift and all lead also including back filling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as per direction of the engineer-in-charge. | 972.42 | CUM | 50 ₹48,621 | 100 ₹97,242 | 100 ₹97,242 | 50 ₹48,621 | 45 ₹43,758.90 | 108 ₹1.1 L | 80 ₹77,793.60 |
| 2.00 | Providing & dumping 20-40 Kgs. Boulder in Launching Apron of floor of Bridge with all lead including all cost of material,Labour and T&P etc. complete. | 99.9 | CUM | 1,800 ₹1.8 L | 3,194 ₹3.2 L | 2,800 ₹2.8 L | 1,800 ₹1.8 L | 2,619.08 ₹2.6 L | 2,700 ₹2.7 L | 2,600 ₹2.6 L |
| 3.00 | Centering and shuttering of cement concrete work including rent of shuttering material, labour and T & P required for proper completion of the work for slab ,lintels ,sun shades,columns & walls etc. | 29.34 | SQM | 650 ₹19,071 | 575 ₹16,870.50 | 500 ₹14,670 | 200 ₹5,868 | 402.5 ₹11,809.35 | 360 ₹10,562.40 | 450 ₹13,203 |
| 4.00 | Centering and shuttering for RCC Work including rent of shuttering material, labour and T & P required for proper completion of the work . | 1,126.75 | SQM | 650 ₹7.3 L | 860 ₹9.7 L | 600 ₹6.8 L | 180 ₹2.0 L | 670.8 ₹7.6 L | 450 ₹5.1 L | 600 ₹6.8 L |
| 5.00 | Providing & laying C.C. ( A-40,M-10)(1:3:6) i/c all cost of material, labour and T&P etc complete. | 98.94 | CUM | 5,000 ₹4.9 L | 5,200 ₹5.1 L | 4,700 ₹4.7 L | 4,200 ₹4.2 L | 4,282.2 ₹4.2 L | 7,020 ₹6.9 L | 5,000 ₹4.9 L |
| 6.00 | Providing & laying C.C. (A-20, M-20) (1:1.5:3) i/c all cost of material,labour and T&P etc complete. | 18 | CUM | 5,700 ₹1.0 L | 6,400 ₹1.2 L | 5,800 ₹1.0 L | 6,000 ₹1.1 L | 5,527.55 ₹99,495.90 | 6,300 ₹1.1 L | 5,500 ₹99,000 |
| 7.00 | Providing & laying R.C.C. (A-20, M-25) (1:1:2) i/c all cost of material, labour and T&P etc complete . | 822.16 | CUM | 6,000 ₹49.3 L | 5,440 ₹44.7 L | 7,000 ₹57.6 L | 6,800 ₹55.9 L | 6,569.1 ₹54.0 L | 6,300 ₹51.8 L | 6,500 ₹53.4 L |
| 8.00 | Providing & fixing Steel Reinforcement including cost of steel, binding wire, bending, binding welding, cutting, placing in proper position i/c all cost of material, labour and T&P etc. complete . | 50.15 | M.T. | 66,000 ₹33.1 L | 71,600 ₹35.9 L | 67,000 ₹33.6 L | 70,000 ₹35.1 L | 58,712 ₹29.4 L | 75,600 ₹37.9 L | 70,000 ₹35.1 L |
| 9.00 | Dismantling bricks or stone masonry in lime or cement including stacking of material within 60 Meters. | 13.8 | CUM | 1,000 ₹13,800 | 518 ₹7,148.40 | 400 ₹5,520 | 200 ₹2,760 | 207.2 ₹2,859.36 | 270 ₹3,726 | 500 ₹6,900 |
| 10.00 | Painting letters including cost of material for writing chainage on VRB including all cost of materials, T&P and labour etc. | 1 | NOS | 1,000 ₹1,000 | 392 ₹392 | 392 ₹392 | 200 ₹200 | 137.2 ₹137.20 | 15,300 ₹15,300 | 300 ₹300 |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
12 Sept 2025, 3:00 pmClosed
SE 1ST IWC MEERUT
SE OFFICE 1ST IWC MEERUT
As per the NIT
2025_UPIDC_1071640_7
04/SE-1/2025-26
Open Tender
Civil Works
90 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.5 L
SE OFFICE 1ST IWC MEERUT
25 Dec 2025
6 Sept 2025
12 Sept 2025
6 Sept 2025
12 Sept 2025
6 Sept 2025
10 Sept 2025
Amount
Earth work in foundation in all types of soil including all lift and all lead also including back filling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as per direction of the engineer-in-charge.
Providing & dumping 20-40 Kgs. Boulder in Launching Apron of floor of Bridge with all lead including all cost of material,Labour and T&P etc. complete.
Centering and shuttering of cement concrete work including rent of shuttering material, labour and T & P required for proper completion of the work for slab ,lintels ,sun shades,columns & walls etc.
Centering and shuttering for RCC Work including rent of shuttering material, labour and T & P required for proper completion of the work .
Providing & laying C.C. ( A-40,M-10)(1:3:6) i/c all cost of material, labour and T&P etc complete.
Providing & laying C.C. (A-20, M-20) (1:1.5:3) i/c all cost of material,labour and T&P etc complete.
Providing & laying R.C.C. (A-20, M-25) (1:1:2) i/c all cost of material, labour and T&P etc complete .
Providing & fixing Steel Reinforcement including cost of steel, binding wire, bending, binding welding, cutting, placing in proper position i/c all cost of material, labour and T&P etc. complete .
Dismantling bricks or stone masonry in lime or cement including stacking of material within 60 Meters.
Painting letters including cost of material for writing chainage on VRB including all cost of materials, T&P and labour etc.
Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials labour t&p etc. per SqM.
Providing and fixing P.V.C. pipe 100 mm dia & 6Kg./cm Sq. I.S.I. Mark including all cost of materials, T&P and labour etc.
M/S RAJPAL SINGH CONTRACTOR (BID ID -5529047)
GOMATINETRA CONSTRUCTIONS (BID ID -5529936)
M/S SUDHIR KUMAR CONTRACTOR (BID ID -5527481)
mamber singh (BID ID -5529683)
SIDDHARTHALAXMI ENGITECH PVT LTD (BID ID -5530110)
Mukut Bihari Lal Contractor (BID ID -5530049)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid