Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹39.5 LAccepted-AOC COLABA MUMBAI | 1 | Accepted-AOC The M/s Monarch Enterprises is being L1 accepted pl. | |
| 2 | 2nd₹42.2 L+₹2.1 L (5.13%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | 2nd | Rejected-Finance Not being L1 | |
| 3 | 3rd₹42.9 L+₹2.8 L (6.98%)Rejected-Finance | 3rd | Rejected-Finance Not being L1 | |
| 4 | 4th₹43.6 L+₹3.5 L (8.69%)Rejected-Finance COLABA MUMBAI | 4th | Rejected-Finance Not being L1 | |
| 5 | 5th₹44.2 L+₹4.0 L (10.1%)Rejected-Finance PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | 5th | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | Monarch Enterprises L1 | Escon Elevators Pvt Ltd L2 | Veer High Tech Solution L4 | Shree Elevator Engineering Co. L3 | shakti engineering and electrical works L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | SCHEDULE 'A' PART I : COMPREHENSIVE ROUTINE MAINTENANCE)
Comprehensive Routine maintenance and repair including renewal/ replacements of minor defective parts other than those covered under Sch A Part II of electrically operated lift 06 passenger (408 Kgs) capacity, fully down collective with microprocessor based control panel, automatic operated sliding doors serving ground plus upper five floors (G+5), Make "Monarch" installed at following bldgs.including carrying out the daily check and periodical service of fully automatic electric lift with power operated door simplex collective control system with replacement of unserviceable parts such as bearing, bushes, all type of shoes, headers, hangers, door cards, door lock, control cards, control connectors/ links, hall push buttons, hall push button covers, rewinding of motors, welding of crack/ broken MS parts, repairs to door,safety edge working at any principle and any type of sensor or mechanical safety lock, magnetic lock or contact, cop buttons, car position indicator, door cill, car door cill, necessary wiring and cable as per requirement for safe operation of lift, lift cabin fan, cabin light including tube rod & tube light fitting etc.complete to ensure safety and smooth operation of lift.
(a) AOF A Block -- 02 Lift
(b) P-98 -- 01 Lift
-----------------------------------------
Total -- 03 Lifts x 11 = 33 per Lift per month all as specified & directed. | 33 | Per lift per months | 14,150 ₹4,66,950 | 12,360 ₹4,07,880 Lowest | 13,620 ₹4,49,460 | 16,371 ₹5,40,243 | 18,650 ₹6,15,450 |
| 2.00 | All as per item No. 1 but of 08 passenger (544 Kgs) lift automatic operated centre opening door, V V V F controlled panel serving groud plus thirteen upper floor(G+13) installed at Menka bldg, No of lifts-01 x 11 = 11 per Lift per month all as specified & directed. | 11 | Per lift per months | 15,800 ₹1,73,800 | 16,890 ₹1,85,790 | 17,850 ₹1,96,350 | 13,980 ₹1,53,780 | 12,360 ₹1,35,960 Lowest |
| 3.00 | All as per item No. 1 but for 05 passenger capacity (340 Kgs) serving ground plus upper three (G+3) upper floors having two landings (i.e. ground floor and 3rd floor) installed at P-24 Assaye building without attendant but with micro processor and VVVF control panel. (No of Lift -01 x 11 = 11) per Lift per month all as specified & directed. | 11 | Per lift per months | 12,640 ₹1,39,040 | 14,029 ₹1,54,319 | 12,410 ₹1,36,510 | 13,860 ₹1,52,460 | 12,360 ₹1,35,960 Lowest |
| 4.00 | All as per item No. 1 but of 13 passenger (884 Kgs) lift automatic operated centre opening door, V V V f controlled panel door, serving ground plus twelve upper floor (G+12) installed at P-106 building-(01 No lift x 11 = 11) per Lift per month all as specified & directed. | 11 | Per lift per months | 17,320 ₹1,90,520 | 17,050 ₹1,87,550 | 19,850 ₹2,18,350 | 16,100 ₹1,77,100 Lowest | 18,950 ₹2,08,450 |
| 5.00 | All as per item No. 1 but of 08 passenger (544 Kgs) lift automatic operated centre opening door, V V V f controlled panel door, serving ground plus twelve upper floor (G+12) installed at P-105, P-106, and Tilottama building-(03 No Lifts x 11 = 33) per Lift per month all as specified & directed. | 33 | Per lift per months | 15,650 ₹5,16,450 Lowest | 17,369 ₹5,73,177 | 18,800 ₹6,20,400 | 20,360 ₹6,71,880 | 16,980 ₹5,60,340 |
| 6.00 | All as per item No. 1 but of 08 passenger (544 Kgs) lift automatic operated centre opening door, V V V f controlled panel door, serving ground plus eight upper floor (G+08) installed at P-104 building-(02 No Lifts x 11 = 22) per Lift per month all as specified & directed. | 22 | Per lift per months | 14,630 ₹3,21,860 | 16,237 ₹3,57,214 | 15,620 ₹3,43,640 | 13,650 ₹3,00,300 Lowest | 16,466 ₹3,62,252 |
| 7.00 | All as per item No. 1 but of 2000 kg goods cum passenger lift automatic operated centre opening door, V V V f controlled panel door serving ground plus eight upper floor (G+08) installed at P-104 building-(02 No Lifts x 11 = 22) per Lift per month all as specified & directed. | 22 | Per lift per months | 15,430 ₹3,39,460 | 14,980 ₹3,29,560 Lowest | 18,535 ₹4,07,770 | 15,320 ₹3,37,040 | 20,320 ₹4,47,040 |
| 8.00Notes for SI Item Nos 1 to 7 :- (i) This schedule does not include the items covered under Sch A Part - II. (ii) All the items required to ensure the smooth and perfect working of the lifts other than those covered under Sch A Part - II shall be deemed to be included in this schedule. (iii) Cleaning of machine rooms and lift pit, drain out water from lift pit shall be included in quoted rates. (iv) For BER lifts Comprehensive will not be measured after dismantling of lift work started and instruction will given to contractor to stop the work by Engr -in- Charge. | ||||||||
| 9.00 | SCHEDULE A PART- II (REPAIR/ REPLACEMENT)
M & L in repair unserviceable Main traction steel wire rope 13 mm dia (8x19S) 9-9-1) construction), fibre main core, 1420 N per sqmm tensile grade, bright surface finish, RHO (lay type and direction) including clamping by dog clamp, nuts & bolts, washers etc complete from main pulley to pit pulley complete all as specified and directed. | 500 | RM | 375 ₹1,87,500 | 415 ₹2,07,500 | 360 ₹1,80,000 | 380 ₹1,90,000 | 330 ₹1,65,000 Lowest |
| 10.00 | S & F in repairs Governer steel wire rope 08 mm dia (8 X 19) constructions, fibre core, 1420 N per sq mm tensile grade, bright surface finish, RHO (lay type and direction), including clamping by dog clamp, nuts & bolts, washers etc complete complete all as specified and directed. | 300 | RM | 315 ₹94,500 | 305 ₹91,500 | 345 ₹1,03,500 | 298 ₹89,400 | 275 ₹82,500 Lowest |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
4 Oct 2025, 6:00 pmClosed
Shri Vinay Kumar, IDSE, SE (SAG), CWE
HQ Commander Works Engineer (Army) Mumbai 24 Assaye Building Colaba Mumbai 400 005
ROUTINE MAINT AND REPAIRS TO ELECTRICALLY OPERARTED SERVICES LIFTS OF MONARCH MAKE INSTALLED AT P-98, P-104, P-105, P-106 AND TILOTTAMA AT ARMY AREA UNDER GE (W) MUMBAI
2025_MES_729080_1
85231/W/E8
Open Tender
Civil Works
Item Rate
330 days
Colaba
As per NIT and tender documents
9 documents required · 9 mandatory
₹500
GE WEST COLABA MUMBAI
₹80,000
11 Nov 2025
8 Sept 2025
6 Oct 2025
8 Sept 2025
4 Oct 2025
22 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .