Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹7.4 L+₹126 (0.02%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹8.1 L+₹68,065 (9.15%)Accepted-Finance | L3 | Accepted-Finance Accepted | |
| 4 | L4₹8.4 L+₹93,526 (12.6%)Accepted-Finance KHALADI PO UDALA DIST MAYUR BHANJ | UDALA | MAYURBHANJ | ODISHA | L4 | Accepted-Finance Accepted | |
| 5 | L5₹8.6 L+₹1.1 L (15.3%)Accepted-Finance AT BARAMBAGARH SUNAPAL PO PS BARAMBA DIST CUTTACK PIN 754031 | BARAMBA | CUTTACK | ODISHA | 754031 | L5 | Accepted-Finance Accepted |
Tender Value
₹12.6 L
EMD Value
₹12,610
Closing Date
29 Jun 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, UDALA
Repair to HL Bridge over river Sono on Udala Teldihudi Dimagadia road_Road_Approach road with PMC and Seal coat and colouringAt 1.300 km
2026_CERWI_132685_1
02(Online)/ RWD/ Udala2026-27
Open Tender
Civil Works - Roads
Percentage
30 days
SE RW Division, Udala
2 documents required · 2 mandatory
₹6,000
₹12,610
Yes
12 Oct 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
23 Jun 2026 - 29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Built up spray grouting of 75 mm thick including cost conveyance royalty etc complete. | 158.86 | sqm | 812.03 | ₹1,28,999.09 |
| 2 | Cleaning the existing BT surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags etc. complete | 1,020 | sqm | 5.59 | ₹5,701.8 |
| 3 | Providing tack coat @ 2 Kg / 10 Sqm over the bitumenous course as per specification for road works etc. completed. | 1,020 | sqm | 29.19 | ₹29,771.45 |
| 4 | Providing 20mm thick primix carpet using 20mm 10mm 6mm chipes and 14.8kg bitumen on road surface with all cost convence royalty of meterials inclouding rolling with PRR etc. completed. | 1,020 | sqm | 267.66 | ₹2,73,013.2 |
| 5 | Providing seal coat type B (precoated seal coat) 6mm thick over the prepared base with premixed stone chips of size 2.36 MM @ 0.06 Cum / 10 Sqm and bitumen @ 6.8 Kg / 10 Sqm including royality, cost, running charges of PRR etc. completed. | 1,020 | sqm | 110.2 | ₹1,12,404 |
| 6 | Finishing wall surfce with acrylic wall putty (water based) of approved make a finished smooth and even surface to receive painting etc complete. | 2,023.53 | sqm | 92.74 | ₹1,87,654.08 |
| 7 | Painting Two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surface etc complete. | 2,023.53 | sqm | 243.13 | ₹4,91,984.09 |
| 8 | Providing and laying moorum topping on the road surface of both side berms of the road including cost, conveyance, royalty and taxes of all materials labour and T&P etc.complete as per specification and direction of the Engineer-in-charge. | 36.72 | cum | 842.46 | ₹30,935.19 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_597526.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.75 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_597526.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .