| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹14.9 L+₹45,740 (3.17%)Rejected-Finance | L2 | Rejected-Finance Being not a lowest | |
| 3 | L3₹15.7 L+₹1.2 L (8.41%)Rejected-Finance | L3 | Rejected-Finance Being not a lowest | |
| 4 | L4₹16.6 L+₹2.1 L (14.6%)Rejected-Finance HOUSE NO 104 WARD NO4 MOHALLA WADHERIAN PATHANKOT GURDASPUR PUNJAB 145001 UDYAM PB 16 0006453 | PATHANKOT | PUNJAB | 145001 | L4 | Rejected-Finance Being not a lowest | |
| 5 | L5₹19.4 L+₹5.0 L (34.5%)Rejected-Finance | L5 | Rejected-Finance Being not a lowest |
Tender Value
₹27 L
EMD Value
₹54,000
Closing Date
28 Aug 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE West Pathankot
GE West Pathankot
PERIODICAL SERVICES AND ALLIED WORKS UNDER AGE B/R-I OF GE (WEST) PATHANKOT
2020_MES_365778_1
GE/PKT-09/2020-21
Open Tender
Civil Works
Works
335 days
GE West Pathankot
Class E Cat a i
9 documents required · 9 mandatory
₹500
GE West Pathankot
₹54,000
Yes
7 Sept 2020
31 Jul 2020
31 Aug 2020
31 Jul 2020
28 Aug 2020
14 Aug 2020
60 days
Amount
Taking down cement plaster of any description and thickness on walls/ceilings etc including racking out joints, hacking for key, scrubbing down with water etc including necessary scaffolding up to four storeys height of bldgs if required and removing of debris out of MoD land complete all as specified and as directed.
Material and labour for rendering 15mm thick in CM 1:4 mixed with liquid water proofing compound (as per manufacturer’s instructions) on fair faces of brick work ,concrete surface of wall, fin, facia, chajjas, parapet and similar article finished surface even and smooth without using extra cement complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor & WPC shall be measured and paid separately.
Material and labour for two coat plaster 35 mm thick (20 mm + 15 mm) on rough concrete surfaces of fin, facia, chajjas and similar article in cm 1:3 with liquid water proofing compound (as per manufacturer’s instructions) mixed in both coats, finished even and smooth without using extra cement complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor ,WPC shall be measured and paid separately & Two coat plaster shall be carried out as mentioned in clause 14.18 of SSR-2009, Part-I complete.
Material and labour for preparation of newly plastered surfaces of wall and applying two coats of Cement Base Paint without any brush marks on the surface in any colour over and including a coat of alkali resistant primer (as per manufacturer’s recommendations) including curing before and after providing of each coat complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor, all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt, Shade/colour shall be approved by GE.
Material and labour for preparation of newly plastered surfaces of wall and applying two coats of exterior grade emulsion paint (weather proof/weather coat) without any brush marks on the surface in any colour over and including one coat of primer (as per manufacturer’s recommendations) complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt ,Shade/colour shall be approved by GE.
Material and labour for preparation of newly plastered wall surface and applying three coats of white wash without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt.
Material and labour for repairing of chajjas, roof projection and faces of exposed reinforcement surface or damaged loose RCC surface and applying one coat of cement slurry @3kg/Sqm and filling with cement concrete 1 : 2 :4 type B-0 (using 12.5 mm graded crushed stone aggregate ) mixed with liquid water proofing compound (as per manufacturer’s instructions) and finished with 05mm thick rendering with cement sand mortar 1 : 3 with liquid water proofing compound finished even & smooth without using extra cement(as per manufacturer’s instructions) using coarse sand in patch area not exc 1.00 sqm each and thickness of RCC member not exc 150 mm and reinforced with welded mesh of weight exc 2.00 Kg per sqm but not exc 3.00 Kg per sqm and finally applying two coats of exterior grade emulsion paint (weather proof/weather coat) without any brush marks on the surface in any colour over and including one coat of primer (as per manufacturer’s recommendations) complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Supply only liquid water proofing compound all as specified and as directed.
Material and labour for rendering 15 CM thick in CM 1:6 on other than fair faces of brick work , concrete surfaces of wall,fin, facia, chajjas,parapet and similar article etc finishing surfaces even and smooth without using extra cement including necessary scaffolding up to four storeys height of bldgs if required complete all as specified and as directed.
Material and labour for preparation of newly plastered surfaces of wall and applying 2mm thick wall care putty on the surfaces & making the surface absolutely smooth surface and applying one coat of primer (as per manufacturer’s recommendations) on the surfaces and applying two coats of distemper oil emulsion finished without any brush marks on the surface in any colour complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for preparation of newly plastered surfaces of wall and applying one coat of putty made of Plaster of Paris with water on the surface and sand papering the same when surface is dry,making the surface absolutely smooth and applying two coats of plastic emulsion paint(water thinable) confirming to IS 5411 (Part 1 ) 1974 (Interior) finished without any brush/roller marks on the surface in any tint over and including one coat of paint primer (as per manufacturer’s recommendations) complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for 10 mm thick rendering on brick work or concrete surfaces in CM 1:3 as in ceiling of roof slab,fin, facia, chajjas,parapet and similar article etc finishing surfaces even and smooth without using extra cement including necessary scaffolding up to four storeys height of bldgs if required complete all as specified and as directed.
Material and labour for preparation of newly plastered surfaces of ceiling and applying three coats of white wash without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt.
M&L for preparation of old plastered or un-plastered surface of ceiling by brooming down or steel wire brushing,scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of distemper oil emulsion of any colour finished without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for complete removal of existing treatment on surface of ceiling and applying 2mm thick wall care putty on the surfaces and making surface absolutely smooth and applying two coats of distemper oil emulsion without any brush marks on the surface in any tint complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for preparation of old plastered or un-plastered old decorated surface of ceiling by brooming down or steel wire brushing,scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of white wash without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt.
Material and labour for complete removal of existing treatment from ceiling surface and applying two coat of white wash on undecorated surfaces without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt.
Material and labour for preparation of old plastered or un-plastered surface of wall by brooming down or steel wire brushing,scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of white wash on old decorated surface without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt.
Material and labour for complete removal of existing treatment on surface of wall and applying two coats of white wash on undecorated surface without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt.
Material and labour for preparation of old plastered or un-plastered surface of wall by brooming down or steel wire brushing,scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of cement base paint of any colour without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for complete removal of existing treatment on surface of wall and applying two coats of Cement Base Paint without any brush marks on the surface in any colour over and including a coat of alkali resistant primer (as per manufacturer’s recommendations) complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for preparation of old plastered or un-plastered surface of wall by brooming down or steel wire brushing,scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of exterior grade emulsion paint (weather proof/weather coat) of any colour without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for complete removal of existing treatment on surface of wall and applying two coats of exterior grade emulsion paint (weather proof/weather coat) without any brush marks on the surface in any colour over and including one coat of primer (as per manufacturer’s recommendations) complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for complete removal of existing treatment on surface of wall and applying 2mm thick wall care putty on the surfaces and making surface absolutely smooth and applying two coats of exterior grade emulsion paint (weather proof/weather coat) without any brush marks on the surface in any colour over and including one coat of primer (as per manufacturer’s recommendations) complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
M&L for preparation of old plastered or un-plastered surface of wall by brooming down or steel wire brushing,scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots etc and applying one coat of distemper oil emulsion of any colour finished without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for complete removal of existing treatment on surface of wall and applying 2mm thick wall care putty on the surfaces and making surface absolutely smooth and applying two coats of distemper oil emulsion without any brush marks on the surface in any tint complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt, Shade/colour shall be approved by GE.
Material and labour for complete removal of existing treatment on surface of wall and applying one coat of primer (as per manufacturer’s recommendations) on the surfaces and applying two coats of distemper oil emulsion without any brush marks on the surface in any tint complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt, Shade/colour shall be approved by GE.
Material and labour for complete removal of existing treatment on surface of wall and applying 2mm thick wall care putty on the surfaces and making surface absolutely smooth and applying one coat of primer (as per manufacturer’s recommendations) on the surfaces and applying two coats of distemper oil emulsion without any brush marks on the surface in any tint complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for preparation of old plastered or un-plastered old painted surface of wall by brooming down or steel wire brushing,scrapping down smoke soot, moulds, moss,efflorescent salts,trading oil,greasy spots,clear finishes including cleaning, stopping and rubbing down etc and applying one coat of plastic emulsion paint confirming to IS 5411 (Part 1 ) 1974 (Interior) of any colour without any brush marks on the surface complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for preparation of old plastered or un-plastered old painted surface of wall by brooming down or steel wire brushing,scrapping down smoke soot, moulds, moss,efflorescent salts,trading oil,greasy spots,clear finishes including cleaning, stopping and rubbing down etc and applying two coat of plastic emulsion paint confirming to IS 5411 (Part 1 ) 1974 (Interior) of any colour without any brush marks on the surface over and including a coat of paint primer (as per manufacturer’s recommendations) complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Material and labour for complete removal of existing treatment on surface of wall and applying one coat of 2mm thick putty made of Plaster of Paris with water on the surface and sand papering the same when surface is dry,making the surface absolutely smooth and applying two coats of plastic emulsion paint(water thinable) confirming to IS 5411 (Part 1 ) 1974 (Interior) finished without any brush/roller marks on the surface in any tint over and including one coat of paint primer (as per manufacturer’s recommendations) complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt,Shade/colour shall be approved by GE.
Taking down old heritage finish /Existing treatment and Preparation of old treated surface and Material & labour for applying based coat including two coat wall care putty on the surfaces and making surface absolutely smooth including primming coat and providing decorative Textures / coatings finish either in internal or external surfaces all as per manufacturer recommendations,in any colour, including necessary scaffolding up to four storeys height of bldgs if required,Texture /granular finish with any colours in any design & pattern in any shade and in any colour shall be approved by GE,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt complete all as specified and as directed. Make:-(a) Unitile (b) Bakelite Hylam (Heritage). (c) Dulux (acratex)(d) Apex (Duracast).
Material and labour for Painting lines, dashes, arrows, letters, etc. on roads, pavements & the like exc 10cm wide with road marking paint, white or golden yellow or any colour etc including preparation of previously treated surfaces of road to receive the painting complete all as spd and directed. Note:-(a) The rates included for provision of red signals to keep off traffic from wet paint, cleaning road surface and working during odd hours when traffic is light. (b) 'The line painting shall stand out boldly and solidly without showing signs of brush marks or surface underneath. If necessary, the surface shall be repainted until the desired result is obtained as directed by GE & Shade/Colour shall be approved by GE.
Material and labour for Painting lines, dashes, arrows, letters, etc. on roads, pavements & the like not exc 10cm wide with road marking paint, white or golden yellow or any colour etc including preparation of previously treated surfaces of road to receive the painting complete all as spd and directed. Note:-(a) The rates included for provision of red signals to keep off traffic from wet paint, cleaning road surface and working during odd hours when traffic is light. (b) 'The line painting shall stand out boldly and solidly without showing signs of brush marks or surface underneath. If necessary, the surface shall be repainted until the desired result is obtained as directed by GE & Shade/Colour shall be approved by GE.
Material and labour for applying one coat of synthetic enamel paint on brick, stone, concrete, asbestos cement or plaster surface of any description,in any colour, on any floor/wall surface over 10cm girth or width, not otherwise described,finished without brush mark on surface including preparation of old surface including necessary scaffolding up to four storeys height of bldgs if required,Shade/colour shall be approved by GE, all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt complete all as specified and as directed.
Material and labour for applying two coat of synthetic enamel paint on brick, stone, concrete, asbestos cement or plaster surface of any description,in any colour, on any floor/wall surface over 10cm girth or width, not otherwise described,finished without brush mark on surface including preparation of old surface including necessary scaffolding up to four storeys height of bldgs if required,Shade/colour shall be approved by GE, all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt complete all as specified and as directed.
Material and labour for preparation of old painted wooden surfaces of any description over 10 centimetre width or girth and applying one coat of synthetic enamel paint in any colour finished without brush mark on surface including necessary scaffolding up to four storeys height of bldgs if required,Shade/colour shall be approved by GE,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt complete all as specified and as directed.
M&L for preparation of old painted wooden surfaces of any description not otherwise described n exc 10 cm width or girth and applying one coat of white / tined synthetic enamel paint all as specified and directed .
Material and labour for preparation of old painted steel and iron surfaces of any description over 10 centimeter width or girth and applying one coat of synthetic enamel paint in any colour finished without brush mark on surface including necessary scaffolding up to four storeys height of bldgs if required,Shade/colour shall be approved by GE, all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt complete all as specified and as directed.
Material and labour for French polishing on surfaces of any description, width or girth including cleaning & preparing the surface including a coat of wood filler on old works with one or more coats in any colour finished without brush mark on surface including necessary scaffolding up to four storeys height of bldgs if required,Shade/colour shall be approved by GE,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt complete all as specified and as directed.
Material and labour for writing letters or figures (block, Roman, Italic or Indian) exceeding 15 centimeter high but not exceeding 30 centimeter high etc with synthetic enamel paint complete all as specified and as directed. Note:-All necessary scaffolding arrangement if required at site up to four storeys height of bldgs shall be included in the quoted rate by the contractor,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt, Shade/colour shall be approved by GE.
Material and labour for Stops, commas, short lines, dashes, hyphens, brackets, etc. including necessary scaffolding up to four storeys height of bldgs if required,Shade/colour shall be approved by GE,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt complete all as specified and as directed.
Material and labour for obliterating the old writing of any description, not exceeding 0.1 square meter, with paint to match with the existing work including necessary scaffolding up to four storeys height of bldgs if required,Shade/colour shall be approved by GE,all painted areas site to be cleaned and hand over as earlier without any extra cost to Govt complete all as specified and as directed.
Material and labour for cutting down plants / trees of girth not exc 15 cm & surface are not exc 0.36 Sqm each from roof tops /sides of external walls of buildings, chajja, wall junctions, junctions of of rain water / soil /waste vent pipes including taking out roots entered in wall/slab surfaces and making good the surfaces including repairing the CI/GI/PVC joints of affected locations by applying TUFALO (herbal medicine )and making good to suit the adjoining surfaces using PCC type 1:2:4, type B-O or cement mortar 1:2 complete all as per manufacturer instructions and as specified. NOTE: Any CI/GI/PVC pipes and fittings damaged during work shall be replaced by new one to insure leakage / seepage free joint without any extra cost to the department and Unit rate quoted by tenderer shall included for use of all scaffolding, trestles, ladders, cradles etc ,hoisting, lowering and protective measures etc up to four storeys height of bldgs including Removing rubbish to a distance exc 500 m but not exc 1.5 km complete all as directed
Material and labour for Cutting, cleaning ,surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep in any type of soil and getting out and removing spoil/earth, bushes, grass etc along fencing/ boundary wall/path/road to access to periodical services and removing of debris out of MoD land complete all as specified and as directed.
Note:- Unit rate quoted by tenderer shall included for (A) Cleaning stains and dripping mortar from floors and walls, etc. (B) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures.(C) Removing of nails, making good holes, cracks, etc.(D) Work in patches, and in narrow \widths. bands, cornices, pilasters, etc. and cutting in edges to line, where necessary.(E) Spreading and removing coverings to doors, windows, floors, fittings, fixtures, fittings, furniture etc., to protect them from splashes.(F) Removing and replacing furniture, movable cupboard, chicks, blinds, etc.(G) Washing floors, cleaning glass, joinery, electric fittings, wiring, etc. of drops and splashes and leaving premise, clean and tidy. (H) Taking down, cleaning as directed and re-fixing blinds and fittings, picture rods, cornice poles and small items of builder’s hardware such as door knobs, finger plates, escutcheons, hooks etc. which are not required to be painted.
Notes :- (a) The contract sum shall be arrived at after deduction of amount of Schedule of Credit. ( NIL). (b) PERFORMANCE SECURITY :- (Refer condition 19 of IAFW-2249) The performance security for an amount equivalent to 5% (Five percent) of the accepted contract sum shall be delivered by the successful bidder immediately after the date of intimation letter of acceptance and all provisions shall be applicable as per condition 19 of IAFW 2249
VIKRAM SINGH MANHAS
M/S Raghuvanshi Builders
Ambika Construction Co
MEHTA BUILDERS
kay gee construction co
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .