Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.6 L
EMD Value
₹5,292
Closing Date
22 Jun 2023, 6:00 pmClosed
District Soil Conservation Officer Division Bla
District Soil Conservation Officer Division Bla
LAYING OF CRATE WIRE STRUCTURE DRSM CHECK DAMS AT Boynar Nalla, BANDIPORA UNDER UT CAPEX BUDGET Dist. BANDIPORA
2023_SWCD_214688_5
e- NIT No. 04 of 2023-24
Open Tender
Civil Works
Percentage
210 days
Boynar Nallah
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
District Soil Conservation Officer Division Bla
₹5,292
Yes
7 Jul 2023
2 Jun 2023
23 Jun 2023
2 Jun 2023
22 Jun 2023
2 Jun 2023
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil 1m from cutting edge 1x16’-0”x5’-0”x [6”+ 1’-0”]/2 = 60cft or 1.70cum x 10= 17.00cum
Hand-packing stones in wire-crates; excluding cost of crates and stones 16’-0”x4’-0”x4’-0’=256cft or 7.25cum Deduct 15% voids = 1.08 cum T= 6.17 cum x 10= 61.7cum
Carriage of stones average lead of 600 m by head load Qtty vide (3) = 61.7cum
Supply of crate wire mesh (4”x4”) including carriage up to site of work 1x 16’-0”x 16’-0”= 256 sft Lids 2x 4’-0”x4’-0”= 16 sft 288sft @ 220gram / sft = 63.36kgx 10= 633.6 kg
CONSTRUCTION OF DRSM CHECK DAMS AT Boynar Nalla ZONE GUREZ DISTRICT BANDIPORA
Construction of DRSM check dam with fashioning of stones to be used along the exposed faces with bond stones including earth work in excavation in all kinds of soils / ordinary rock/ hard rock (as per site) in trench with an average minimum depth of 6” throughout the length of foundation including all necessary lead and lifts, excluding cost of stones & bond stones, its carriage up to site of work, labour component, supervision etc, complete job. Lat. = 34°-34’-25.18’’N Lo.= 74°- 63’-58.34’’ E Qty. =120 Cum 1x( 1.50m + 1.20m)/2 x 1.20m x 87.3 m = 1141.42 cum D/d 15% voids = (-) 21.21 cum ----------------------------- Net Vol = 120.21 cum or say 120cum
FAYAZ AHMAD MALIK
HILAL AHMAD MIR
SABA FAROOQ
M/s Mohd Ashraf Mir
M/s Mohd Ashraf Gojer
M/S BASHIR AHMAD RATHER
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .