Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC low price | |
| 2 | L2₹4.9 L+₹756.77 (0.15%)Rejected-Finance | L2 | Rejected-Finance high price |
| Sl No | Description | Qty | Unit | VAIDHIYALINGAM L1 | DINESHKUMAR. M L2 |
|---|---|---|---|---|---|
| 1.00Construction of Passenger Waiting Shed at Gopalapuram in Bramanavayal Panchayat | |||||
| 2.00 | Earth work exacavation and depositing on bank with initial lead and lift in all clauses of soils such as as per S.S.20B for narrow foundation etc. complete. | 11.25 | Cum | 263 ₹2,958.75 Lowest | 264 ₹2,970 |
| 3.00 | Supplying and Filling Gravel including cost and Conveyance of all materials to Site and all labour Charges etc | 5.58 | Cum | 679 ₹3,788.82 Lowest | 680 ₹3,794.4 |
| 4.00 | Supplying and Filling with M.Sand including cost and Conveyance of all materials to Site and all labour Charges etc | 2.83 | Cum | 2,228 ₹6,305.24 Lowest | 2,230 ₹6,310.9 |
| 5.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 2.82 | Cum | 6,094 ₹17,185.08 Lowest | 6,095 ₹17,187.9 |
| 6.00 | Centering charges for concrete works including cost and conveyance of all materials to site and all labour charges etc., complete. | 64.97 | Sqm | 1,094 ₹71,077.18 Lowest | 1,097 ₹71,272.09 |
| 7.00 | Supply and fabrication of steel including cost and conveyance of all materials to site and labour charges etc., complete | 0.69 | Mt | 91,969 ₹63,366.64 Lowest | 91,970 ₹63,367.33 |
| 8.00 | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete. | 8.64 | Cum | 9,896 ₹85,501.44 Lowest | 9,898 ₹85,518.72 |
| 9.00 | Brick work in cm 1:5 mix using country bricks including cost and conveyance of all materials to site including labour charges incidental charges and curing etc., complete | 8.67 | Cum | 6,277 ₹54,421.59 Lowest | 6,279 ₹54,438.93 |
| 10.00 | Supplying and applying of two Coats of Putty of 3mm thick over the exposed Rcc surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing.The Surface shall be then be allowed to dry for atleast 48 hours.It Shall then be sand papered (water proof abrasive sheet) to give a smooth and even surface.Any unevenness Shall be made good by applying 1st Coat of Putty mixed with water on the entire surface including filling up the undulations and applying 2nd Coat of putty after 6 hours of 1st Coat of putty and then sand preparing (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly,etc,Complete complying with standard specification and as directed by the Departmental officers.[the rates are inclusive of the charges for grinding machine with wheel.cost of sand paper (water proof abrasive sheet),cost of putty , blade, labour charges for grinding the joints and sand papering,two coat of putty Scrapping the putty area to level the surface smooth,etc.,complete].The Putty should be got approved by the Executive engineerbefore use on work, | 18.32 | Sqm | 308 ₹5,642.56 Lowest | 310 ₹5,679.2 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
3 Nov 2025, 4:00 pmClosed
BDO
PT UNION OFFICE
Construction of Passenger Waiting Shed at Gopalapuram in Bramanavayal Panchayat
2025_RDTN_618691_1
MLACDS Work In Bramanavayal Pt 1790/2025/A3
Open Tender
Civil Works
Item Rate
180 days
MANAMELKUDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
Yes
22 Dec 2025
30 Oct 2025
3 Nov 2025
30 Oct 2025
3 Nov 2025
30 Oct 2025
Earth work exacavation and depositing on bank with initial lead and lift in all clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Supplying and Filling Gravel including cost and Conveyance of all materials to Site and all labour Charges etc
Supplying and Filling with M.Sand including cost and Conveyance of all materials to Site and all labour Charges etc
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Centering charges for concrete works including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and fabrication of steel including cost and conveyance of all materials to site and labour charges etc., complete
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Brick work in cm 1:5 mix using country bricks including cost and conveyance of all materials to site including labour charges incidental charges and curing etc., complete
Supplying and applying of two Coats of Putty of 3mm thick over the exposed Rcc surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing.The Surface shall be then be allowed to dry for atleast 48 hours.It Shall then be sand papered (water proof abrasive sheet) to give a smooth and even surface.Any unevenness Shall be made good by applying 1st Coat of Putty mixed with water on the entire surface including filling up the undulations and applying 2nd Coat of putty after 6 hours of 1st Coat of putty and then sand preparing (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly,etc,Complete complying with standard specification and as directed by the Departmental officers.[the rates are inclusive of the charges for grinding machine with wheel.cost of sand paper (water proof abrasive sheet),cost of putty , blade, labour charges for grinding the joints and sand papering,two coat of putty Scrapping the putty area to level the surface smooth,etc.,complete].The Putty should be got approved by the Executive engineerbefore use on work,
Plastering with Cement Mortar 1:5 mix 12mm thick including cost and conveyance of all materials and all labour charges etc,. complete.
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with one course of pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification
SUPPLY AND FIXING OF GLAZED TILES including cost and conveyance of all materials to site and all labour charges etc. complete
Emulsion Painting two coats inluding cost and conveyance of all materials to site and all labour charges
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_739585.xls
BOQ • 0.24 MB
TECH_BIT.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .