Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹16.8 L+₹12,791 (0.77%)Rejected-Finance | L2 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | L.G.ARASU L2 | SRI THIRUMURUGA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work Excavation and depositing on bank with initial lead and lift as per SS 20 B etc. complete as per standard specification. | 134.5 | m3 | 269 ₹36,180.5 | 263 ₹35,373.5 Lowest |
| 2.00 | Collection and Supply of Stone dust, including cost and conveyance of materials and labour charges for Stone dust filling etc., complete as per standard specification. | 12.5 | m3 | 451 ₹5,637.5 Lowest | 496 ₹6,200 |
| 3.00 | Plain Cement Concerete 1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials and labour charges etc., complete as per standard specification. | 12.5 | m3 | 6,148 ₹76,850 | 6,145 ₹76,812.5 Lowest |
| 4.00 | Centering and Shuttering for all items of R.C.C works includings labour charges etc., complete as per standard specification. Beam | 84 | m2 | 576 ₹48,384 | 572 ₹48,048 Lowest |
| 4.01 | Column | 106 | m2 | 1,419 ₹1,50,414 | 1,416 ₹1,50,096 Lowest |
| 5.00 | RCC 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials and labour charges etc., as per standard specification. | 41.5 | m3 | 9,428 ₹3,91,262 | 9,425 ₹3,91,137.5 Lowest |
| 6.00 | Supply and Fabrication of steel including cost and conveance of all materials and labour charges etc., as per standard specification. | 3,113 | Kg | 98 ₹3,05,074 | 95.35 ₹2,96,824.55 Lowest |
| 7.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five M Sand ) using new best country Bricks of size 8 ¾” x 4 ¼” x 2 ¾” from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications. | 44.5 | m3 | 7,935 ₹3,53,107.5 | 7,931 ₹3,52,929.5 Lowest |
| 8.00 | Plastering with cement mortor 1:5 to 12mm thick including cost and conveyance of all materials and all other labour charges etc., complete as per standard specifications. | 508.2 | m2 | 315 ₹1,60,083 | 312.5 ₹1,58,812.5 Lowest |
| 9.00 | Painting two coats ready mixed Approved Exteriar Emulsion of first quality and of approved colour over a primingcoat including through scarbing clan removel ofone coat of priming with best Cement paint as directed by the department officers etc complete and including necessary plaster of paris whever regd.(S.l.No.358) -10sqm | 508.2 | m2 | 294 ₹1,49,410.8 | 290 ₹1,47,378 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
19 Sept 2025, 3:00 pmClosed
executive officer naravarikuppam town panchayat
executive officer naravarikuppam town panchayat
Construction of Compound wall Alamathi Lake in Naravarikuppam Town Panchayat
2025_DTP_605232_1
290/2025/A1
Open Tender
Civil Works
Works
180 days
Construction of Compound wall Alamathi Lake in Nar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
Yes
30 Oct 2025
17 Sept 2025
19 Sept 2025
17 Sept 2025
19 Sept 2025
17 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .