Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC Being L1 bidder | |
| 2 | L2₹1.7 L+₹8,528 (5.23%)Rejected-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | L2 | Rejected-Finance Not being lowest bidder | |
| 3 | L3₹1.7 L+₹10,586 (6.49%)Rejected-Finance BHAGWATI NAGAR JAMMU | L3 | Rejected-Finance Not being lowest bidder | |
| 4 | L4₹1.9 L+₹28,030 (17.2%)Rejected-Finance BARI BRAHMANA JAMMU | L4 | Rejected-Finance Not being lowest bidder |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
23 Jun 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer MID Jammu
Repair replacement of worn out parts of pumping unit II (11 cusec 45 mt head) at LIS Gurha Pattan and 3 cusec pumping unit no. 2 at LIS Datriyal along with allied works.
2021_IFC_126186_1
MID/J/e-NIT/2021-22/14
Open Tender
Repair and Maintenance Works
Lump-sum
10 days
Gurah Pattan Datriyal
As per tender notice
7 documents required · 7 mandatory
₹200
Executive Engineer MID Jammu
₹4,500
Yes
Jammu
28 Oct 2021
4 Jun 2021
24 Jun 2021
4 Jun 2021
23 Jun 2021
8 Jun 2021
4 Jun 2021 - 23 Jun 2021
7 Jun 2021
180 days
Amount
Repair/replacement of worn out parts of pumping unit II (11 cusec 45 mt head) at LIS Gurha Pattan along with allied works. Decoupling of 11 cusec Horizontal split casing pump of unit no.2 from the motor assembly and dismantling the pump from the base frame. Carriage of the dismantled 11cusec Split casing pump set by using manual labour, head load to the nearest roadside, loading in transport vehicle, carriage to the workshop in the mechanical transport for repairs. Repair to 11 cusec Split casing pump set at workshop by way of dismantling and extraction of damaged internal parts. Providing & fitting of new gun metal impeller in place of damaged one as per sample. Job includes repairs to pump shaft by way of welding, turning, aligning, threading at ends and making of new keyways and straightening of the same to proper size. Providing and fitting of new bushes-2 Nos., new check nut, new gland rings, new bearings as per sample, new studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, complete assembling of pump set after carrying out necessary repairs. Shifting back to the LIS Gurha Pattan after carrying out necessary repairs at workshop and then fitting/reinstallation at the base frame, coupling with the motor by making proper alignment and testing on partial/full load. Complete job including cost of material and labour charges etc. C/job
Repair/replacement of worn out parts of 3 cusec pumping unit no. 2 at LIS Datriyal along with allied works. Decoupling of 03 cusec Horizontal casing pump of unit no.2 of LIS Datriyal from the motor assembly and dismantling the pump from the base frame at site. Carriage of the dismantled 03 cusec Horizontal casing pump set, to the nearest roadside, using manual labour, head load to nearest road side, loading in transport vehicle, carriage to the workshop in the mechanical transport for repairs. Repair to the 03 cusec Split casing pump set at workshop by way of dismantling for extraction of damaged internal parts. Replacement of damaged pump shaft with new pump shaft by way of turning & finishing to accurate size, threading at ends and making of new key way. Repair to impeller by way of brazing, turning and finishing to accurate size including making of new key way of the same size and specifications. Providing and fitting of new bush- 02 Nos. , new check nuts, new gland rings-02 nos., new bearings as per sample, new studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, re-assembling of pump at workshop after carrying out necessary repairs and then back carriage to the LIS. Fitting/reinstallation at the base frame, coupling and making proper alignment of the pump motor and testing on part/full load at site. Providing & fitting of new CI coupling set by way of machining for keyway on either side of shaft (motor and pump side) as per sample by way of resizing of holes. Job also includes Providing and fitting of new coupling nuts/bolts & rubber bushes. Complete job including cost of material and labour charges. Complete Job Dismantling/decoupling of the damaged 20 H.P electric motor of Pumping unit no-2 from base frame, pump & motor starter electrical connections. Repairs to rotor of motor by providing/fitting of new bearings (DE & NDE) after rebuilding of the rotor shaft and finishing to bearing sizes, making new keyway for coupling, providing/fitting of bearing end cover plates. Complete greasing of the bearing, providing/fitting of side strainers. Complete job including cost of material and labour charges
Rebate on Old Parts
G S ENGINEERING WORKS
BEE AAR ENTERPRISES
JAGDEMBAY MECH ENGG WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .