| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-Finance | ₹3.3 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹4.4 Cr+₹1.1 Cr (35.2%)Rejected-Finance 140 BAJRANG NAGAR SIKANDRA AGRA | ₹4.4 Cr+₹1.1 Cr (35.2%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.1 Cr+₹1.9 Cr (57.4%)Rejected-Finance MOH SHER MOHAMMAD PILIBHIT | PILIBHIT | UTTAR PRADESH | 262001 | ₹5.1 Cr+₹1.9 Cr (57.4%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 5 | Rejected-Technical 2486 CHURKHI ROAD PATEL NAGAR ORAI JALAUN UTTAR PRADESH 285501 | ORAI | JALAUN | UTTAR PRADESH | 285501 | - | - | Rejected-Technical Reject |
Tender Value
Refer Docs
EMD Value
₹6.8 L
Closing Date
20 Mar 2024, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Renewal of Orai Konch Nadigaon road (MDR-46B) in Ch. 2.300 to 28.330
2024_CEJNS_915590_1
1765/ 44 C- Jhansi Circle/23 Date 06.03.2024
Open Tender
Civil Works - Roads
Item Rate
150 days
Orai (Jalaun)
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,500
₹6.8 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
12 Jul 2024
13 Mar 2024
20 Mar 2024
13 Mar 2024
20 Mar 2024
13 Mar 2024
17 Mar 2024
Amount
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. ENC Circular No.
Bituminous Concrete (Grading 2 With VG-30) Bitumen Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects as per Morth specification 507 Sr. 5.05 (B)
The routine maintenance of above road work including embankment,patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
The routine maintenance of above road work including embankment,patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (1.5% Construction Cost)
The routine maintenance of above road work including embankment,patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (3% Construction Cost)
The routine maintenance of above road work including embankment,patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (4.5% Construction Cost)
The routine maintenance of above road work including embankment,patri, pavement road surface and sides etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (6% Construction Cost)
M/S Rakesh Kumar Contractor
M/S HINDUSTAN CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .