Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.9 LAdmitted-Finance | ₹25.9 L | L1 | Admitted-Finance |
| 2 | L2₹26.3 LAdmitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹26.3 L | L2 | Admitted-Finance |
| 3 | L3₹27.7 LAdmitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹27.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L2 | K DHINAKARAN L3 | Dillibabu L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete. | 16 | M2 | 5 ₹80 | 5 ₹80 | 2 ₹32 Lowest |
| 2.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth.
In Hard stiff clay, stiff black cotton, hard red earth, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B 85% | 294 | M3 | 150 ₹44,100 | 150 ₹44,100 | 100 ₹29,400 Lowest |
| 3.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 18.25 | cu.m | 2,000 ₹36,500 | 2,000 ₹36,500 | 100 ₹1,825 Lowest |
| 4.00 | Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from R.C.C inside the cable trench and free from debris and without cable laying work including cost of labour, hinderence to the initial lead, lifts, labour, tools and plants, complete. | 21.87 | cum | 5,000 ₹1,09,350 Lowest | 5,000 ₹1,09,350 Lowest | 10,000 ₹2,18,700 |
| 5.00 | Supplying and erection of New Earthpit including material, labour, tools and plants, complete. | 2 | nos. | 20,000 ₹40,000 | 20,000 ₹40,000 | 5,000 ₹10,000 Lowest |
| 6.00 | Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 90 | cu.m | 60 ₹5,400 | 60 ₹5,400 | 5 ₹450 Lowest |
| 7.00 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete. | 17.5 | cu.m | 6,000 ₹1,05,000 | 6,000 ₹1,05,000 | 5,000 ₹87,500 Lowest |
| 8.00 | RCC 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, labour, lead, lift, curing, etc., but excluding cost of steel reinforcement complete in all respects. Precast slab | 46.58 | cum | 10,000 ₹4,65,800 Lowest | 10,000 ₹4,65,800 Lowest | 20,000 ₹9,31,600 |
| 9.00 | Supplying and fixing MS angle, channel, Chequered plate, MS rail, etc wherever required as directed by the Engineer as per standard specifcation | 1,117.2 | Kg | 100 ₹1,11,720 Lowest | 100 ₹1,11,720 Lowest | 100 ₹1,11,720 Lowest |
| 10.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete. | 4.66 | MT | 65,000 ₹3,02,900 | 65,000 ₹3,02,900 | 55,000 ₹2,56,300 Lowest |
Tender Value
Refer Docs
EMD Value
₹26,620
Closing Date
4 Aug 2026, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
Vallam Vadagal 110/33kV SS
2026_EB_689407_1
OT-08/2026-27 of SE/GCC-II/CNI
Open Tender
Civil Works
Works
120 days
Vallam Vadagal
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹26,620
Yes
12 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
4 Aug 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete. | 16 | M2 | - | - |
| 2 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth.
In Hard stiff clay, stiff black cotton, hard red earth, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B 85% | 294 | M3 | - | - |
| 3 | Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 18.25 | cu.m | - | - |
| 4Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from R.C.C inside the cable trench and free from debris and without cable laying work including cost of labour, hinderence to the initial lead, lifts, labour, tools and plants, complete. | |||||
| 5 | Supplying and erection of New Earthpit including material, labour, tools and plants, complete. | 2 | nos. | - | - |
| 6 | Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 90 | cu.m | - | - |
| 7 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete. | 17.5 | cu.m | - | - |
| 8 | RCC 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, labour, lead, lift, curing, etc., but excluding cost of steel reinforcement complete in all respects. Precast slab | 46.58 | cum | - | - |
| 9 | Supplying and fixing MS angle, channel, Chequered plate, MS rail, etc wherever required as directed by the Engineer as per standard specifcation | 1,117.2 | Kg | - | - |
| 10 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete. | 4.66 | MT | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_828707.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].