| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | ₹2.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.1 Cr+₹9.1 L (4.44%)Rejected-Finance | ₹2.1 Cr+₹9.1 L (4.44%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.2 Cr+₹17.5 L (8.53%)Rejected-Finance VILLAGE GOBINDAPUR POST SONHA DISTRICT BASTI | BASTI | UTTAR PRADESH | ₹2.2 Cr+₹17.5 L (8.53%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.2 Cr+₹18.2 L (8.90%)Rejected-Finance GRAM TINANHARI POST NATHNAGAR THANA MAHULI DISTRICT SANT KABIR NAGAR | AMROHA | UTTAR PRADESH | 244102 | ₹2.2 Cr+₹18.2 L (8.90%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | - | - | Rejected-Technical As per Uploaded |
| Sl No | Description | Qty | Unit | M/S BALA JI ENTERPRISES L3 | M/S BABA TRADERS L2 | M/S SHYAM ASSOCIATE L1 | SHIVANAND SHUKLA L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in all type soil with all lead, lift & proper disposal of earth and back filling etc.required for proper complection of the work | 6,240.6 | M3 | 63 ₹3,93,157.8 | 60 ₹3,74,436 | 50 ₹3,12,030 Lowest | 70 ₹4,36,842 |
| 2.00 | Laying P C.C. 1:2:4 (A40 M-15) in foundation & C.C.Blocks with 20-40mm size stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc required for proper completion of the work. | 242.68 | M3 | 7,900 ₹19,17,172 | 8,000 ₹19,41,440 | 7,300 ₹17,71,564 Lowest | 9,000 ₹21,84,120 |
| 3.00 | Laying R C.C. 1:1.5:3 (A20 M-20) in wing wall superstructure work with 4.75 to 20 mm size stone grit & coarsesand having F.M not less than 2.0 including cost of all material , labour and T&P etc. required for proper completion of the work | 221.21 | M3 | 9,800 ₹21,67,858 | 9,000 ₹19,90,890 | 8,900 ₹19,68,769 Lowest | 9,500 ₹21,01,495 |
| 4.00 | Laying R C.C. 1:1:2 (A10 M-25) in Raft,Piers, Abutments Slab work with 4.75 to 20 mm size stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc .required for proper completion of the work | 921.45 | M3 | 10,300 ₹94,90,935 | 9,500 ₹87,53,775 | 9,450 ₹87,07,702.5 Lowest | 10,000 ₹92,14,500 |
| 5.00 | laying R.C.C. 1: 1: 2 (A 10 M25 ) in weaing coat with 4.75 to 10 mm size stone grit & coarse sand having F.M not less . required for proper completion of the workthan 2.0 including cost of all material labour and T&P etc. required for proper completion of the work | 1.58 | M3 | 11,000 ₹17,380 | 10,600 ₹16,748 | 9,400 ₹14,852 Lowest | 10,000 ₹15,800 |
| 6.00 | Cutting, bending, binding and placing steel reinforcement including cost of binding wire and cost of steel, labour, T&P etc. required for proper completion of the work. | 67 | M.T. | 64,000 ₹42,88,000 | 68,500 ₹45,89,500 | 63,000 ₹42,21,000 Lowest | 72,000 ₹48,24,000 |
| 7.00 | Centering & shuttering for R.C.C work (A20M20/A20 M25) including cost of all material , labour and T&P etc .required for proper completion of the work | 1,145.8 | M2 | 620 ₹7,10,396 | 500 ₹5,72,900 Lowest | 500 ₹5,72,900 Lowest | 600 ₹6,87,480 |
| 8.00 | Shuttering for PCC work in foundation including cost of all material, labour and T&P etc required for proper completion of the work. | 73.94 | M2 | 170 ₹12,569.8 | 210 ₹15,527.4 | 150 ₹11,091 Lowest | 300 ₹22,182 |
| 9.00 | Shuttering for RCC/PCC work in foundation and C.C block including cost of all material, labour and T&P etc required for proper completion of the work. | 927.97 | M2 | 370 ₹3,43,348.9 | 400 ₹3,71,188 | 250 ₹2,31,992.5 Lowest | 500 ₹4,63,985 |
| 10.00 | S/ laying boulder 40-60 kg by weight including cost of boulder labour and T&P etc. required for proper completion of the work | 293.95 | M3 | 4,700 ₹13,81,565 | 4,500 ₹13,22,775 | 4,000 ₹11,75,800 Lowest | 4,000 ₹11,75,800 Lowest |
Tender Value
₹2.6 Cr
EMD Value
₹5.3 L
Closing Date
20 Aug 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Construction of Cross Regulator including Escape Chainage Head Regulator at Km 22.800 Of Bansgaon Dy.
2026_UPIDC_1175065_1
01/S.E/2026-27
Open Tender
Civil Works
Item Wise
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,101
₹5.3 L
8 Sept 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all type soil with all lead, lift & proper disposal of earth and back filling etc.required for proper complection of the work | 6,240.6 | M3 | - | - |
| 2 | Laying P C.C. 1:2:4 (A40 M-15) in foundation & C.C.Blocks with 20-40mm size stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc required for proper completion of the work. | 242.68 | M3 | - | - |
| 3 | Laying R C.C. 1:1.5:3 (A20 M-20) in wing wall superstructure work with 4.75 to 20 mm size stone grit & coarsesand having F.M not less than 2.0 including cost of all material , labour and T&P etc. required for proper completion of the work | 221.21 | M3 | - | - |
| 4 | Laying R C.C. 1:1:2 (A10 M-25) in Raft,Piers, Abutments Slab work with 4.75 to 20 mm size stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc .required for proper completion of the work | 921.45 | M3 | - | - |
| 5 | laying R.C.C. 1: 1: 2 (A 10 M25 ) in weaing coat with 4.75 to 10 mm size stone grit & coarse sand having F.M not less . required for proper completion of the workthan 2.0 including cost of all material labour and T&P etc. required for proper completion of the work | 1.58 | M3 | - | - |
| 6 | Cutting, bending, binding and placing steel reinforcement including cost of binding wire and cost of steel, labour, T&P etc. required for proper completion of the work. | 67 | M.T. | - | - |
| 7 | Centering & shuttering for R.C.C work (A20M20/A20 M25) including cost of all material , labour and T&P etc .required for proper completion of the work | 1,145.8 | M2 | - | - |
| 8 | Shuttering for PCC work in foundation including cost of all material, labour and T&P etc required for proper completion of the work. | 73.94 | M2 | - | - |
| 9 | Shuttering for RCC/PCC work in foundation and C.C block including cost of all material, labour and T&P etc required for proper completion of the work. | 927.97 | M2 | - | - |
| 10 | S/ laying boulder 40-60 kg by weight including cost of boulder labour and T&P etc. required for proper completion of the work | 293.95 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
Lot1ok.pdf
Tender Documents • 2.75 MB
BOQ_2208480.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .