Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.6 LAdmitted-Finance 0 DAR COMPLEX RANGRETH OLD AIRPORT ROAD RANGRETH WAVOOSA RANGRETH BUDGAM JAMMU KASHMIR 191111 | BUDGAM | JAMMU AND KASHMIR | 191111 | L1 | Admitted-Finance | |
| 2 | L2₹70.5 L+₹5.9 L (9.14%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹71.1 L+₹6.4 L (9.97%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹71.2 L+₹6.6 L (10.2%)Admitted-Finance R O JIB PANCHAYAT UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Admitted-Finance | |
| 5 | L5₹71.3 L+₹6.7 L (10.4%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | mohd aslam khan L14 | RAVINDER KUMAR GOVT CONTRACTOR L2 | Ram Pal Sharma L5 | Jaswant Singh L6 | JAS EXCAVATORS L12 | SUNIL KUMAR L10 | Harsh Vardhan Sons L3 | M/S RAVINDER SINGH L8 | sandeep jamwal ccontractor L15 | Pawan Kumar Gupta L9 | sh. Bashir Ahmed Wani L7 | Bhag Ali Choudhary L13 | Rakesh Kumar L11 | M/S NORTHERN CONSTRUCTION AND CO. L1 | balraj sharma Govt Contractor L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
All kinds of soil : | 332.77 | cum | 150 ₹49,915.5 | 250 ₹83,192.5 | 200 ₹66,554 | 200 ₹66,554 | 150 ₹49,915.5 | 200 ₹66,554 | 150 ₹49,915.5 | 200 ₹66,554 | 200 ₹66,554 | 219.88 ₹73,169.47 | 180 ₹59,898.6 | 200 ₹66,554 | 350 ₹1,16,469.5 | 80 ₹26,621.6 Lowest | 200 ₹66,554 |
| 2.00 | Providing and lying in position a layer of cement conc. in 1:5:10 mix with 40mm aggregate. | 48.94 | cum | 3,500 ₹1,71,290 | 3,000 ₹1,46,820 | 3,800 ₹1,85,972 | 2,500 ₹1,22,350 | 2,500 ₹1,22,350 | 2,498.29 ₹1,22,266.33 | 3,500 ₹1,71,290 | 2,500 ₹1,22,350 | 2,000 ₹97,880 Lowest | 3,400 ₹1,66,396 | 3,400 ₹1,66,396 | 4,000 ₹1,95,760 | 3,569.71 ₹1,74,701.61 | 2,500 ₹1,22,350 | 2,900 ₹1,41,926 |
| 3.00 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 461.84 | cum | 4,700 ₹21,70,648 | 4,200 ₹19,39,728 | 5,000 ₹23,09,200 | 3,900 ₹18,01,176 | 5,500 ₹25,40,120 | 5,000 ₹23,09,200 | 4,500 ₹20,78,280 | 4,600 ₹21,24,464 | 4,200 ₹19,39,728 | 4,800.01 ₹22,16,836.62 | 4,000 ₹18,47,360 | 3,525 ₹16,27,986 Lowest | 5,150 ₹23,78,476 | 3,800 ₹17,54,992 | 4,600 ₹21,24,464 |
| 4.00 | Cetring and shuttering including strutting, propping etc and removal of the formwork in Foundations, footings, bases of columns etc. for mass concrete | 2,602.38 | sqm | 150 ₹3,90,357 | 130 ₹3,38,309.4 | 200 ₹5,20,476 | 200 ₹5,20,476 | 150 ₹3,90,357 | 176 ₹4,58,018.88 | 210 ₹5,46,499.8 | 147.25 ₹3,83,200.46 | 100 ₹2,60,238 Lowest | 100 ₹2,60,238 Lowest | 150 ₹3,90,357 | 100 ₹2,60,238 Lowest | 136 ₹3,53,923.68 | 100 ₹2,60,238 Lowest | 150 ₹3,90,357 |
| 5.00 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | 25,178.28 | Kgs | 120 ₹30,21,394.05 | 115 ₹28,95,502.63 | 107 ₹26,94,076.36 | 120 ₹30,21,394.05 | 110 ₹27,69,611.21 | 100 ₹25,17,828.37 | 95 ₹23,91,936.95 Lowest | 115 ₹28,95,502.63 | 130 ₹32,73,176.88 | 112 ₹28,19,967.78 | 118 ₹29,71,037.48 | 165 ₹41,54,416.81 | 115 ₹28,95,502.63 | 98 ₹24,67,471.8 | 98.5 ₹24,80,060.95 |
| 6.00 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge.
Made of G.I. wire of dia 4 mm | 2,313.23 | Sqm | 790 ₹18,27,451.7 | 590 ₹13,64,805.7 | 449 ₹10,38,640.27 Lowest | 650 ₹15,03,599.5 | 800 ₹18,50,584 | 700 ₹16,19,261 | 650 ₹15,03,599.5 | 700 ₹16,19,261 | 900 ₹20,81,907 | 640 ₹14,80,467.2 | 640 ₹14,80,467.2 | 650 ₹15,03,599.5 | 665 ₹15,38,297.95 | 675 ₹15,61,430.25 | 650 ₹15,03,599.5 |
| 7.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work | 2,775.86 | Sqm | 150 ₹4,16,379 | 103 ₹2,85,913.58 | 90 ₹2,49,827.4 | 70 ₹1,94,310.2 | 120 ₹3,33,103.2 | 55 ₹1,52,672.3 | 90.78 ₹2,51,998.12 | 49.95 ₹1,38,660.97 Lowest | 200 ₹5,55,172 | 75 ₹2,08,189.5 | 100 ₹2,77,586 | 100 ₹2,77,586 | 80 ₹2,22,068.8 | 90 ₹2,49,827.4 | 99 ₹2,74,810.14 |
| 8.00 | Carriage of Sand | 240.07 | cum | 200 ₹48,013.32 | 0.5 ₹120.03 | 100 ₹24,006.66 | 20 ₹4,801.33 | 100 ₹24,006.66 | 150 ₹36,009.99 | 100 ₹24,006.66 | 0.01 ₹2.4 Lowest | 100 ₹24,006.66 | 179.55 ₹43,103.96 | 100 ₹24,006.66 | 128.75 ₹30,908.57 | 239 ₹57,375.92 | 30 ₹7,202 | 200 ₹48,013.32 |
| 9.00 | Carriage of Stone Aggregate | 454.59 | cum | 200 ₹90,918.84 | 0.5 ₹227.3 | 100 ₹45,459.42 | 20 ₹9,091.88 | 100 ₹45,459.42 | 150 ₹68,189.13 | 200 ₹90,918.84 | 0.01 ₹4.55 Lowest | 150 ₹68,189.13 | 179.57 ₹81,631.48 | 100 ₹45,459.42 | 128.75 ₹58,529 | 229.16 ₹1,04,174.81 | 30 ₹13,637.83 | 200 ₹90,918.84 |
| 23.00Measurable quantities may vary at the time of actual execution of the work and shall be allowed as per actual with in the cost. | ||||||||||||||||||
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
9 Jun 2023, 6:00 pmClosed
DGM
DGM, UNIT-II, SHASTRI NAGAR, JAMMU
Construction of Boundary Wall of Housing Colony at Chak Bhalwal
2023_HAUDD_212936_1
E NIT No - 13 of 2023-24
Open Tender
Civil Works
Item Rate
90 days
Bhalwal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
DGM, UNIT-II, SHASTRI NAGAR, JAMMU
₹2.0 L
2 Jul 2023
22 May 2023
10 Jun 2023
22 May 2023
9 Jun 2023
22 May 2023
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and lying in position a layer of cement conc. in 1:5:10 mix with 40mm aggregate.
Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level.
Cetring and shuttering including strutting, propping etc and removal of the formwork in Foundations, footings, bases of columns etc. for mass concrete
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia 4 mm
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work
Carriage of Sand
Carriage of Stone Aggregate
Measurable quantities may vary at the time of actual execution of the work and shall be allowed as per actual with in the cost.
RAVINDER KUMAR GOVT CONTRACTOR
Harsh Vardhan Sons
balraj sharma Govt Contractor
Ram Pal Sharma
Jaswant Singh
sh. Bashir Ahmed Wani
M/S RAVINDER SINGH
Pawan Kumar Gupta
SUNIL KUMAR
Rakesh Kumar
JAS EXCAVATORS
Bhag Ali Choudhary
mohd aslam khan
sandeep jamwal ccontractor
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .