Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical UnComplete paper |
Tender Value
Refer Docs
EMD Value
₹5,900
Closing Date
25 Jun 2021, 1:00 pmClosed
SUPERINTENDING ENGINEER EDC Mirzapur
SUPERINTENDING ENGINEER EDC Mirzapur
INCREASING CAPACITY OF TRANSFORMER
2021_PVVNV_593637_1
21/EDC(M)/21-22
Open Tender
Electrical Works
Lump-sum
90 days
SUPERINTENDING ENGINEER EDC Mirzapur
Please refer tender
2 documents required · 2 mandatory
₹590
Executive Engineer(A)
₹5,900
Yes
12 Jul 2021
9 Jun 2021
26 Jun 2021
9 Jun 2021
25 Jun 2021
9 Jun 2021
Amount
Cartage of following material from Elect y. Store center, Mirzapur to dump site near work site including loading/unloading & proper stocking. ( Distance upto 70 Km.)
Due to overloaded of 10 KVA T/F, cartageof 25 KVA T/F from Store Center, Mirzapur to site & installation including construction of D.P. and cartage of 10 KVA T/F from site to Store Center, Mirzapur.
Due to Overloaded of 25 KVA T/F, Cartage from Store Center Mirzapur to site & installation of 63 KVA T/F and Cartage of 63 KVA T/f from site to Store Center, Mirzapur .
Due to Overloaded of 63 KVA T/F, Cartage from Store Center Mirzapur to site & installation of 100 KVA T/F and Cartage of 63 KVA T/f from site to Store Center, Mirzapur.
Due to Overloaded of 100 KVA T/F, Cartage from Store Center Mirzapur to site & installation of 250 KVA T/F and Cartage of 100 KVA T/f from site to Store Center, Mirzapur.
Construction of Transformer plinth for 250 KVA T/F of 2x2x1.5 Mtr. Including the work of excavation for foundation of plinth, plastering of walls and finishing including cost of all meterials.
Well type earthing of 250 KVA Transformer by using ‘B’ Class G.I. pipe of 1.5” dia and making hand pipe type earth boring IInd strata of water or 60 ft. whichever is deeper about 6” of G.I. pipe shall remain above ground level. 2 Nos. G.I. Earth Clamp shall also be welded to the portion of pipe which is above the ground level. Through this G.I. Clamp, a G.I. strip 30x5 mm duly galvanized shall be connected with Nut-bolt. Every D.T. shall have 2 such earthing. One earthing for transformer neutral and second earthing for transformer body. All the required materials shall be supplied by the contractor.
Fencing of T/F with M.S. Square mesh welded/fixed on M.s. Angle of size 65x65x6 mm with gate hinges & shutter assembly, of overall size 3x3x2.5 Mtr. as per drawing.
Lal Engineering co
M/S A.V. POWER CONSTRUCTION CO.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .