Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.9 LAccepted-Finance | ₹4.9 L | L-1 | Accepted-Finance Accepted |
| 2 | L-2₹5.8 LAccepted-Finance | ₹5.8 L | L-2 | Accepted-Finance Accepted |
| 3 | L-3₹6.3 LAccepted-Finance | ₹6.3 L | L-3 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | NARENDER SINGH CONTRACTOR L1 | Chirakshi Construction Co. L2 | SHAMBHU DA CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical clause 201 of MORT&H specifications In area of Light Jungle (By Mechanical Means) PB CSR 2020 Ref 24.2 (c) | 6.5 | Hectare | 35,250 ₹2.3 L | 38,000 ₹2.5 L | 39,000 ₹2.5 L |
| 2.00 | Compaction of earth work & Preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 300-2 as per Technical clause 305 of MORT&H specifications. (In case of link roads earth work to be done by villagers) PB CSR 2020 Ref 24.4 (c) | 41,500 | Sqm | 6.3 ₹2.6 L | 8 ₹3.3 L | 9 ₹3.7 L |
Tender Value
Refer Docs
Closing Date
22 Dec 2025, 3:00 pmClosed
Er Rakesh kumar tewatia
Operation and Maintenance Division BBMB Bhiwani
E-Tender for Jungle Clearance and Levelling of site (for setting up a solar power project) at 400 KV Sub Station BBMB, Bhiwani and 220 KV Sub Station BBMB Ch Dadri
2025_BBMB_256300_1
ENIT06/O M BWN/2025-26
Open Tender
Civil Works
60 days
400 kV Sub station BBMB Bhiwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Sr. Account Officer BBMB Delhi
Exempted
5 Feb 2026
21 Nov 2025
23 Dec 2025
21 Nov 2025
22 Dec 2025
21 Nov 2025
Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical clause 201 of MORT&H specifications In area of Light Jungle (By Mechanical Means) PB CSR 2020 Ref 24.2 (c)
Compaction of earth work & Preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 300-2 as per Technical clause 305 of MORT&H specifications. (In case of link roads earth work to be done by villagers) PB CSR 2020 Ref 24.4 (c)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
TenderDoc.pdf
Tender Documents • 1.32 MB
BOQ_295508.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid