Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 1421 7Y BLOCK KIDWAI NAGAR KANPUR NAGAR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹1.5 Cr | L1 | Accepted-AOC Financial bid accepted |
| 2 | Not Admitted-Fee/PreQual/Technical 964 RAJENDRA NAGAR ORAI JALAUN | ORAI | JALAUN | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹10.7 L
Closing Date
31 Dec 2025, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Construction of Kalpi Mangraul road to Tigdeshwar Mandir Km- 1 and 2(210)
2025_CEJNS_1101416_1
9799/44 C-jhs-cir/25, Date 16.12.2025
Open Tender
Civil Works - Roads
365 days
Orai (Jalaun)
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,695
₹10.7 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
16 Mar 2026
24 Dec 2025
31 Dec 2025
24 Dec 2025
31 Dec 2025
24 Dec 2025
26 Dec 2025
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth roller to achieve the desired density, complete as per clause 401. for Grading-I (Ch- 4 page- 2) Including cost of material labour and T&P but excluding cost of GST.
Providing laying spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel 80-100 KN static roller in stages to proper grade and camber , Applying and brooming crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MORD specifications 405-3 (Ch- 4 page- 18) Including cost of material labour and T&P but excluding cost of GST.
Providing and applying primer coat with bitumen Emulsion S.S.-1 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 ( Page- 5-2) Including cost of material labour and T&P but excluding cost of GST.
Providing and applying tack coat with Bitumen VG-10 using bitumin pressure distributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Air compressor as per Technical Specification Clause 503. (Page 5-4) Including cost of material labour and T&P but excluding cost of GST.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a sutable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either type A or Type B or Type C as per Technical Sepecification Clause 508. (Page 5-26) Including cost of material labour and T&P but excluding cost of GST.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Page 5-52) Including cost of material labour and T&P but excluding cost of GST.
Providing and laying of 80mm Interlocking concrete block pavement laid in stone dust base and fill joint with fine sand. Joint filled after labling and dressing base including supply of all material, labour, T&P etc required for proper completion of the work. Including cost of material labour and T&P but excluding cost of GST.
Supply & fixing Km. Stone and theire pinting & Lerter writing etc. complete.( Ch-10 page-17-18) Including cost of material labour and T&P but excluding cost of GST.
Supply & fixing HM Stone and theire pinting & Lerter writing etc. complete.( Ch-10 page-17-18) Including cost of material labour and T&P but excluding cost of GST.
Providing and fixing road safety and signage board, Retro-reflectorised informatory sign board (1.2 m x 0.9 m) as per IRC: 67 made of high intensity grade sheething fixed over aluminium sheets sporated single mild steel angle iron post 75x75x6 etc. complete including fixing Including cost of material labour and T&P but excluding cost of GST.
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth roller to achieve the desired density, complete as per clause 401. for Grading-I (Ch- 4 page- 2) Including cost of material labour and T&P but excluding cost of GST.
Providing and laying of 80mm Interlocking concrete block pavement laid in stone dust base and fill joint with fine sand. Joint filled after labling and dressing base including supply of all material, labour, T&P etc required for proper completion of the work. Including cost of material labour and T&P but excluding cost of GST.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Including cost of material labour and T&P but excluding cost of GST.
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material. (Mord Specification No- 11.10- 300 (1) Ordinary soil) Including cost of material labour and T&P but excluding cost of GST.
Sand filling in foundation trenches abutment wall etc. in layers incuding watering, compacting including all lead & lift and also all materials, labour, T&P etc. required for proper completion of work. (Mord Specification No- 11.20- 300&1200 (1) sand filling) Including cost of material labour and T&P but excluding cost of GST.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specifications clauses 802,803,1202 & 1203 (Mord Specification No- 11.40- 800&1200 (1) (P.C.C. Grade M-10) Including cost of material labour and T&P but excluding cost of GST.
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5 (Mord Specification No- 13.10- 800 (II) (R.C.C. Grade M-25) Including cost of material labour and T&P but excluding cost of GST.
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications clauses 800,1205.4 and 1205.5 (RCC M-30) (Mord Specification No- 13.10-III) Including cost of material labour and T&P but excluding cost of GST.
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002,1005,1010 & 1202 (Mord Specification No- 12.60) Including cost of material labour and T&P but excluding cost of GST.
Back filling behind abutment, wing wall and return wall complete as per drawings & technical specification clause 1204.3.8 (Mord Specification No- 12.10 -1200-II sandy material) Including cost of material labour and T&P but excluding cost of GST.
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 ( As per Lucknow SOR) Including cost of material labour and T&P but excluding cost of GST.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Mord Specification No- 3.40- 301.50) Page- 3-3 Including cost of material labour and T&P but excluding cost of GST.
Construction of embankment with approved material obtained from borrow pits with al lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead uo to 1000 m as per techmnical spacification cause 303.1 including stablization with 2% staked lime including its mixing with rotabator complate two layer. (Mord Specification No- Clause 403. Page-4-10. Including cost of material labour and T&P but excluding cost of GST.
Providing laying spreading and compacting stone aggregates of specific size to water bound macadam Grade-II specification including spreading in uniform thickness, hand packing rolling with smooth wheel roller 80-100 Km in stages to proper grade and camber , MORD specifications 405-2 (Mord Specification No- Clause 4.80-405 (II). Page-4-16 Including cost of material labour and T&P but excluding cost of GST.
Providing laying spreading and compacting stone aggregates of specific size to water bound macadam Grad-III specification including spreading in uniform thickness, hand packing rolling with smooth wheel roller 80-100 Km in stages to proper grade and camber , MORD specifications 405-3 (Mord Specification No- Clause 4.80-405 (III). Page-4-18 Including cost of material labour and T&P but excluding cost of GST.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Mord Specification No- Clause 3.14-303.1 Page- 3-12 Including cost of material labour and T&P but excluding cost of GST.
Providing and applying primer coat with bitumen Emulsion S.S.-1 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 (Mord Specification No- Clause 5.10- 502 Page- 5-2. Including cost of material labour and T&P but excluding cost of GST.
Providing and applying tack coat with Bitumen VG-10 using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Mord Specification No- Clause 5.20- 502 (I)Page- 5-2. Including cost of material labour and T&P but excluding cost of GST.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a sutable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat Type C as per Technical Sepecification Clause 508. (Mord Specification No- Clause 5.9- 508 Page- 5-23. Including cost of material labour and T&P but excluding cost of GST.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 .(Mord Specification No- Clause 5.12- 510 Page- 5-39. Including cost of material labour and T&P but excluding cost of GST.
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over te entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8 (Sr no-12.11-1200, Page no- 12-12) Including cost of material labour and T&P but excluding cost of GST.
Providing and laying Pitching on slopes laid over prepared filter media as per drawing and Technical specifications Clause 1302. ( Sr No- 14.50-1300 page- 14-4) Including cost of material labour and T&P but excluding cost of GST.
Supply & Laying of Hume pipe in position with cement and sand mortar in 1:2 withsun including labour and T & P etc. required for proper completion of work as per direction of by the Engineer-in-charge (Labour rate only) N.P-3-Type (a) 1000 mm dia . Including cost of material labour and T&P but excluding cost of GST.
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.00% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.75% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.50% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.25% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3.00% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.00% Construction Cost) (Excluding GST) CC Work
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost) (Excluding GST) CC Work
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost) (Excluding GST) CC Work
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost) (Excluding GST) CC Work
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1.00% Construction Cost) (Excluding GST) CC Work
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
T2.pdf
Tender Documents • 1.31 MB
BOQ_2030063.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid