| 1 | L1₹6.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.8 L+₹2,234 (0.33%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SSP CONSTRUCTION L2 | Annai Constructions L1 |
|---|---|---|---|---|---|
| 1.01CONSTRUCTION OF COMPOUND WALL @ GOVT HIGH SCHOOL IN KODUKKAPATTU PANCHAYAT | |||||
| 1.02 | Earth work excavation and depositing on bank with intial lead and lift in all clasuses of soil such as Hard Gravely soil, Gravely soil except Hard Rock requiring Blasting etc complete as per SS20B for narrow foundation | 18.77 | cum | 320 ₹6,006.4 | 220 ₹4,129.4 Lowest |
| 1.03 | Cement concrete 1:4:8 using 40.m.m H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15. cm. thick compacting ect completed complying with standard specification and as | 4.69 | cum | 5,172.79 ₹24,260.39 Lowest | 5,172.79 ₹24,260.39 Lowest |
| 1.04 | Supply and fabrication of steel including all labour charges etc,. | 1.37 | cum | 88,910.76 ₹1,21,541.01 Lowest | 88,910.76 ₹1,21,541.01 Lowest |
| 1.05 | Supplying and erecting centering shuttering including necessary supports for plane including all labour charges | 94.19 | cum | 469.66 ₹44,237.28 Lowest | 469.66 ₹44,237.28 Lowest |
| 1.06 | Reinforcement Cement concrete 1:1.5:3 using 20.m.m H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15. cm. thick compacting ect completed complying with standard specification and as | 15.53 | cum | 8,709.12 ₹1,35,252.63 Lowest | 8,709.12 ₹1,35,252.63 Lowest |
| 1.07 | Brick work in cm 1:5 (one cement and five sand) using country bricks ground moulded of size 23X11X7cm. For the following including curing,etc. completed complying with standard specification | 16.05 | cum | 6,617.7 ₹1,06,214.09 Lowest | 6,617.7 ₹1,06,214.09 Lowest |
| 1.08 | Plastering in cm 1:5 12mm thick for superstructure complying with standard specification as directed etc complete. | 271.31 | cum | 256.26 ₹69,525.9 Lowest | 256.26 ₹69,525.9 Lowest |
| 1.09 | Colour wash with two coats with Emulsion paint of approved colour including cost and conveyance of all charges etc., complete. | 271.32 | cum | 232.42 ₹63,060.19 Lowest | 232.42 ₹63,060.19 Lowest |
| 1.10 | Name Board Charges | 1 | cum | 500 ₹500 Lowest | 500 ₹500 Lowest |
Tender Value
₹6.8 L
EMD Value
₹6,770
Closing Date
8 Feb 2024, 3:00 pmClosed
BDO
Mugaiyur
Mugaiyur/15CFC/23-24/10
2024_RDTN_410865_10
Mugaiyur/15CFC/23-24
Open Tender
Civil Works
Works
90 days
Mugaiyur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,770
Yes
4 Dec 2025
19 Jan 2024
8 Feb 2024
19 Jan 2024
8 Feb 2024
19 Jan 2024
Amount
CONSTRUCTION OF COMPOUND WALL @ GOVT HIGH SCHOOL IN KODUKKAPATTU PANCHAYAT
Earth work excavation and depositing on bank with intial lead and lift in all clasuses of soil such as Hard Gravely soil, Gravely soil except Hard Rock requiring Blasting etc complete as per SS20B for narrow foundation
Cement concrete 1:4:8 using 40.m.m H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15. cm. thick compacting ect completed complying with standard specification and as
Supply and fabrication of steel including all labour charges etc,.
Supplying and erecting centering shuttering including necessary supports for plane including all labour charges
Reinforcement Cement concrete 1:1.5:3 using 20.m.m H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15. cm. thick compacting ect completed complying with standard specification and as
Brick work in cm 1:5 (one cement and five sand) using country bricks ground moulded of size 23X11X7cm. For the following including curing,etc. completed complying with standard specification
Plastering in cm 1:5 12mm thick for superstructure complying with standard specification as directed etc complete.
Colour wash with two coats with Emulsion paint of approved colour including cost and conveyance of all charges etc., complete.
Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SSP CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .