Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹11.0 L |
Tender Value
₹16.1 L
EMD Value
₹32,200
Closing Date
7 Apr 2026, 3:00 pmClosed
Executive Engineer, BUILDING DIVISION Ara
EE
EE, Ara Division , BUILDING CONSTRUCTION DEPARTMENT, Ara, Bihar
Superintending Engineer, Ara Circle
SE
Construction of Covered walkway on path connecting main building to 15 court building of civil Court, Ara
127326
NIT 2/BCD/ARA/2025-26
Open Tender
CIVIL
Gaya
• as per nit
CIVIL
PERCENTAGE
L1
1
6 documents required · 6 mandatory
₹5,000
Processing Fee: 590
₹32,200
11 May 2026
13 Mar 2026
8 Apr 2026
13 Mar 2026
7 Apr 2026
13 Mar 2026
BOQ for Construction of Covered walkway on path connecting main building to 15 court building of civil Court, Ara
Sl No SOR Item of Work Quantity Rate (in Rs.) Unit Amount (in Rs.)
1 2.8.1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All Kinds of soil 22.68 m3 360.70 per m3 , ,81,81.00
2 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. 2.27 m3 287.30 per m3 , , 6,52.00
3 11.72 Providing designation 100 A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l, 15.12 m2 283.30 per m² , ,42,83.00
4 4.1.2 Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level 1:1.5:3(1 Cement :1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) 19.28 m3 4420.80 per m3 , 8,52,33.00
5 10.16.1 Steel work in built up tubular trusses including cutting, hoisting, fixing in position and applying a priming coar of approved steel primer, welded and bolted including special shaped washers etc. complete. Hot finished welded type tubes 9240.08 kg 123.90 per kg 1,14,48,46.00
6 12.47. Providing & fixing UV stabilised fiberglass reinforced plastic sheet roofing up to any pitch, including fixing with polymer coated 'J' or 'L' hooks, bolts & nuts 8mm dia. G.I plain/bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% ultra-violet stabiliser in resin system under approximately 2400 psi and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to IS 10192 and IS 12866.The sheets shall be opaque or translucent, clear or pigmented, textured or smooth as specified.
12.47.1 2 mm thick corrugated (2.5" or 4.2" or 6") or step-down (2" or 3" or 6" ) as specified 189.79 m2 1097.90 per m² ,20,83,70.00
7 13.82.1 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: New steel work (two or more coats) 184.50 m2 83.50 per m² , 1,54,06.00
8 Carriage of Materials
a Coarse Sand 8.5796 m3 584.13 per m3 , ,50,12.00
b Stone Chips 17.1592 m3 4729.57 per m3 , 8,11,56.00
c Bricks 487.77 Nos 941.28 Per‱ , , 4,59.00
9 Extra Cost of Materials
a Cement 123.392 Bags 13.14 per bag , ,16,21.00
Correction Factor (0.982) on Estimated Cost 1,52,72,25.00
Grand Total 1,60,90,84.00
Executive Engineer
Building Division, ARA
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT.pdf
NIT • 2.04 MB
1. BOQ of Covered Walkway.xlsx
NIT • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .