Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC 10 RASULPUR LAMAHI VARANASI UTTAR PRADESH 221007 | VARANASI | UTTAR PRADESH | 221007 | ₹1.3 Cr | L1 | Accepted-AOC AOC L1 |
| 2 | L2₹1.8 Cr+₹48.4 L (35.9%)Rejected-Finance | ₹1.8 Cr+₹48.4 L (35.9%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.9 Cr+₹51.1 L (37.9%)Rejected-Finance | ₹1.9 Cr+₹51.1 L (37.9%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical GONDA | UTTAR PRADESH | 271305 | - | - | Rejected-Technical As per uploaded Result |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per uploaded Result |
| Sl No | Description | Qty | Unit | M/s Nikhil Enterprises L1 | M/s Jeet Associates L3 | BALENDRA SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation for all structures of Dys all type of soil including lead upto 30.00m, lift upto 1.5m , and its proper disposal and back filling as per direction given by Engineer incharge, required for proper completion of work including cost of all T&P, labour etc. | 3,936.23 | Cum | 69.74 ₹2,74,512.33 Lowest | 100 ₹3,93,622.5 | 115.68 ₹4,55,326.76 |
| 2.00 | Laying C.C- A 20 M-10 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 23.21 | Cum | 7,976 ₹1,85,087.87 Lowest | 12,490 ₹2,89,837.94 | 12,095.16 ₹2,80,675.44 |
| 3.00 | Laying C.C- A 20 M-15 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 673.03 | Cum | 9,496 ₹63,91,067.24 Lowest | 12,900 ₹86,82,052.17 | 12,607.23 ₹84,85,011.31 |
| 4.00 | Laying C.C- A 20 M-20 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc. | 28.75 | Cum | 9,774 ₹2,81,051.37 Lowest | 13,586 ₹3,90,665.43 | 13,151.25 ₹3,78,164.14 |
| 5.00 | Centering & Shuttering for C.C / R.C.C. work in different parts of structures in Dhanoura dys with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. A-Upto 3.00m span | 371.52 | sqm | 406 ₹1,50,837.12 Lowest | 500 ₹1,85,760 | 484 ₹1,79,815.68 |
| 6.00 | Centering & Shuttering for C.C / R.C.C. work in different parts of structures in Dhanoura dys with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. B-Above 3.00m span | 1,070.92 | sqm | 406 ₹4,34,791.9 Lowest | 960 ₹10,28,079.36 | 968 ₹10,36,646.69 |
| 7.00 | Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures of dys. required for proper completion of work including cost of all material,labour T.&P. etc. | 11.85 | MT | 74,600 ₹8,84,010 Lowest | 80,000 ₹9,48,000 | 81,194.87 ₹9,62,159.23 |
| 8.00 | Laying and fixing joint filler board 20 mm. Thick as specified locations in different structures of dys. required for proper completion of work including cost of all material,labour and T.&P.etc. | 24.25 | Sqm | 999 ₹24,225.75 Lowest | 2,000 ₹48,500 | 2,023.12 ₹49,060.66 |
| 9.00 | Carriage and laying stone boulder(Weight 20kg to 40kg and minimum dimension of 200 mm) for drain bed & slope protection in dys required for proper completion of work including cost of all material,labour and T.&P.etc. | 581.99 | Cum | 4,446 ₹25,87,527.54 Lowest | 5,700 ₹33,17,343 | 5,589.23 ₹32,52,877.13 |
| 10.00 | providing and laying 4.75 to 20.mm size crushed stone grit (granite) in laying filter below cc block required for proper complection of work including cost of all materials, labour, T.&P.etc. | 15.02 | Cum | 2,999 ₹45,044.98 Lowest | 6,600 ₹99,132 | 6,630.8 ₹99,594.62 |
Tender Value
Refer Docs
EMD Value
₹3.8 L
Closing Date
30 Sept 2025, 2:00 pmClosed
Superintending Engineer
S.E. Rapti Nahar Nirman Mandal-2, Basti (U.P.)
Construction work of balance work of drainage crossing at km.1.700 of Banchauri Rajwaha in district Siddharth nagar
2025_UPIDC_1071582_5
Tender Notic 02/SE/2025-26
Open Tender
Civil Works
Item Wise
120 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,830
₹3.8 L
3 Dec 2025
9 Sept 2025
30 Sept 2025
9 Sept 2025
30 Sept 2025
9 Sept 2025
Amount
Earth work in excavation of foundation for all structures of Dys all type of soil including lead upto 30.00m, lift upto 1.5m , and its proper disposal and back filling as per direction given by Engineer incharge, required for proper completion of work including cost of all T&P, labour etc.
Laying C.C- A 20 M-10 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying C.C- A 20 M-15 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Laying C.C- A 20 M-20 with Cement (O.P.C.,43 grade). coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T.&P. etc.
Centering & Shuttering for C.C / R.C.C. work in different parts of structures in Dhanoura dys with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. A-Upto 3.00m span
Centering & Shuttering for C.C / R.C.C. work in different parts of structures in Dhanoura dys with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc. B-Above 3.00m span
Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures of dys. required for proper completion of work including cost of all material,labour T.&P. etc.
Laying and fixing joint filler board 20 mm. Thick as specified locations in different structures of dys. required for proper completion of work including cost of all material,labour and T.&P.etc.
Carriage and laying stone boulder(Weight 20kg to 40kg and minimum dimension of 200 mm) for drain bed & slope protection in dys required for proper completion of work including cost of all material,labour and T.&P.etc.
providing and laying 4.75 to 20.mm size crushed stone grit (granite) in laying filter below cc block required for proper complection of work including cost of all materials, labour, T.&P.etc.
providing and laying 20 to 40.mm size crushed stone grit (granite) in laying filter below cc block required for proper complection of work including cost of all materials, labour, T.&P.etc.
P/Laying coarse sand for filter base required for proper complection of work including cost of all materials, labour, T.&P.etc.
Supplying and driving "Z" type sheet piles of required size in different structures of dys. with cutting, welding & cost of material required for proper completion of work including cost of all materials, labour,T.&P.etc.
BALENDRA SINGH (BID ID -5574130)
M/s Jeet Associates (BID ID -5574161)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .