Loading…
Loading…
Tender Value
₹2.1 Cr
EMD Value
₹4.1 L
Closing Date
25 Sept 2026, 12:00 pm4d left
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
TENDER SEC
33 conditions · 5 needing a document upload
GST Registration details should be attached
Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also,as notified by Central/State Govt & as amended from time to time and applicable taxes before bidding.Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
The successful tenderer who is liable to be registered under GST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/ UTGST/ SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under GST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Special Conditions of contract has been uploaded as a document which will be in effect for this tender.
Note :- AMC of each Integrated Power Supply System will commence only after expiry of Warranty/AMC Period.
Note :- AMC will be discontinued in case the IPS is replaced by a new one.
Comprehensive Annual Maintenance Contract (CAMC) of Integrated Power Supply System (IPS) (Statcon Energiaa make) for a period of 05 (Five) years installed at different stations in Kharagpur Division of South Eastern Railway.
ST-AMC_IPS_StatconEnergia~SER
ST-AMC_IPS_StatconEnergia
Single
Works - General
60 Months
Paschim Medinipur, West Bengal
₹0
₹4.1 L
25 Sept 2026
10 Sept 2026
11 Sept 2026
1 item across 1 schedule · ₹2,06,11,396.2 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive Annual Maintenance Contract of Main Integrated Power Supply System (M/s Statcon Energiaa make). Annual Maintenance Charges for the entire system includes repair and replacement of Defective Card/Modules/Sub-System/Components/Parts either in Hardware or in Software of any other form involved for safe, reliable and trouble free functioning of the Integrated Power Supply System installed. It includes testing, checking and maintenance of IPS system along with all the equipments complete mainly consisting of DC-DC Converter of various capacities (including DC-DC Converter Module of Main IPS kept at East & West Goomties), SMPS Battery Chargers (SMR), Transformers of different ratings, CVT Regulators of different ratings, Inverters of different ratings, Manual Switches capacitor, B12 Auto Change over panel, AutoChange over Switches, Diode, Fuse trip indicator, push button, Resistance CT, Choke, Shunt & Socket of different ratings, or any other Accessories necessary to make the IPS functional. [Qty = 1740 = 29 Nos. of IPS x 60 Months = 1740 AMC charges for 01 IPS per year = 12 X Rs. 11,845.63/- = Rs. 1,42,147.56] | Numbers 1740.00 | — | 11,845.63 | 2,06,11,396.2 |
| Schedule total | ₹2,06,11,396.2 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Location.pdf
ATTACHMENT
Special Conditions of Contract
ATTACHMENT
BankGuarantee-converted.pdf BankGuarantee
ATTACHMENT
AnnexureV.pdf
ATTACHMENT
I_CT_GCC-
ATTACHMENT
LC Letter
ATTACHMENT
BankMandateForm.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
LCletter2018_CE-I_CT_9Date04_06_2018.pdf
ATTACHMENT
SpecialContidionsofContract-IPSSTATCONENERGIAA.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .