Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
22 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI COLLECTORATE MADURAI -625020
Construction of Drainage ,Soak Pits and other infrastructure facilities _13 nos. in AGAMT-II-2021-22 Village panchayats of Melur Block in Madurai District in Package no. Mel_05
2022_RDTN_240240_1
568/2022/D7Mel05/24.06.22
Open Tender
Civil Works
Item Rate
180 days
melur
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹36,000
1 Aug 2022
8 Jul 2022
22 Jul 2022
8 Jul 2022
22 Jul 2022
9 Jul 2022
90 days
Amount
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Cleaning Juliflora Jungle with Uprooting includingcost and conveyance of materials to site and removing the away from the site and all labour charges etc complete
Earth work excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including infinal leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth within the godown or inside compound in places shown with initial leads and lifts, clearing and levelling the site, shoring strutting baling of water wherever necessary etc., complete complying with standard specification.
Collection and supply of Cutstone roughly dressed of size 0.20x0.20x2mt from approved quarry the stacking site and labour charges etc., completed
supply and fixing of chainlink 2"*2" using 10 gauge galvanaised iron wire including cost and conveyance of materials to site all labour charges etc comp.SOR Page no 44
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces
600mm dia Rcc Ring
Cost of Fillter Material of 40mm metal
Cost of Fillter Material of 20mm metal
Cost of Fillter Material of sand
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Cleaning Juliflora Jungle with Uprooting includingcost and conveyance of materials to site and removing the away from the site and all labour charges etc complete
Earth work excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including infinal leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth within the godown or inside compound in places shown with initial leads and lifts, clearing and levelling the site, shoring strutting baling of water wherever necessary etc., complete complying with standard specification.
Collection and supply of Cutstone roughly dressed of size 0.20x0.20x2mt from approved quarry the stacking site and labour charges etc., completed
supply and fixing of chainlink 2"*2" using 10 gauge galvanaised iron wire including cost and conveyance of materials to site all labour charges etc comp.SOR Page no 44
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
E SURESH
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .