| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.4 L+₹857 (0.25%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.5 L+₹3,256 (0.95%)Rejected-Finance 35 P C SEN STADIUM BUILDING JANNAGAR ROAD MAHESH SERAMPORE HOOGHLY 712202 | SERAMPORE | HOOGHLY | WEST BENGAL | 712202 | L3 | Rejected-Finance L3 |
Tender Value
₹3.4 L
EMD Value
₹6,900
Closing Date
11 Feb 2026, 2:00 pmClosed
EE(C)/BR-XV
The Executive Engineer ( C ), Borough - XV, Kolkata Municipal Corporation, E/3, Circular Garden Reach Road Kolkata-700024
RESTORATION OF HOT MIX ROAD WITH ALLIED WORKS AT ALIF NAGAR LANE IN WARD NO-134 BR-XV
2026_KMC_997387_1
KMC/EE(C)/Br-XV/134/143/2025- 2026/R
Open Tender
CIVIL WORKS
Percentage
90 days
IN WARD NO-134 BR-XV
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,900
17 Mar 2026
2 Feb 2026
13 Feb 2026
2 Feb 2026
11 Feb 2026
2 Feb 2026
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm)
Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For WBM / WMM Surface: (with primer @ 0.70-1.0 kg/sqm)
Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Night Time
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D) (ii) 25 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover: 680 mm X 90 mm Frame: 800 mm X 16.5 mm opening: 500mm Weight: 196 kg (approx)
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Compressor machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, Tools and plants all complete for cutting Road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of EIC . a) With Pneumatic hammers For minimum engagement of 8 hrs. In a day
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete
SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF NTERLOCKING CONCRETE BLOCK PAVEMENT (ICBP) WITH CONCRETE BLOCK (WITH CONCRETE GRADE AS SPECIFIED AS PER TABLE 1 OF IS 15658 :2006) MANUFACTURED FROM BIS LICENSEE MANUFACTURER ,WITH SPACER NIB (SMALL PROTRUDING PROFILES ON THE VERTICAL FACE OF PAVER BLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP IN BETWEEN THE PAVING BLOCK ,AS PER CI NO3.26 OF IS 15658) AND SPECIFIED SIZE AND SHAPE WITH ASPECT RATIO (THE RATIO OF LENGTH TO THICKNESS OF A PAVER BLOCK ,AS PER CI NO3.3 OF IS:15658)AS PER TABLE 2 OF IS:15658 WITH FLEXURAL STRENGTH /BREAKING LOAD AS PER ANNEXURE G OF IS:15658 AND COMPLETING THE EDGE WITH CUT BLOCKS AS PER CI NO 8.7 OF IRC SP -63(2018) WITH PROPER CONFINEMENT OF BEDDING AND JOINT FILLING SAND ,COMPACTION ,LEVELLING AND FILLING UP OF THE EDGE GAPE 50MM THICK (II) COLOURED DECORATIVE
Estimated amount
Add: 9%SGST
Add: 9%CGST
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
ROAD_new.pdf
Additional Documents • 2.42 MB
TENDERFORM134143.pdf
Tender Documents • 0.57 MB
BOQ_2441943.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .