| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.4 LAdmitted-Finance | ₹39.4 L | L1 | Admitted-Finance |
| 2 | L2₹39.4 LAdmitted-Finance | ₹39.4 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s R.L Enterprise L1 | M/S T. TAGONG ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00 | SH:RCC Retaining wall. Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m. | 129.96 | cum | 213.5 ₹27,746.46 | 216.5 ₹28,136.34 |
| 2.00 | Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
a) Foundations and plinth | 8.55 | Cum | 6,651.7 ₹56,872.04 | 6,652 ₹56,874.60 |
| 3.00 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsg, fitting and placing HYSD bar reinforcement in sub?structure complete as per drawing and technical specifications:b) Tar/TMT steel | 247.94 | kg | 112.9 ₹27,992.43 | 112.9 ₹27,992.43 |
| 4.00 | Reinforced cement concrete in walls (any thickness) including attached
pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in:a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size) | 247.26 | Cum | 9,915.2 ₹24.5 L | 9,915.2 ₹24.5 L |
| 5.00 | Centring and shuttering including strutting, propping etc and removal of formwork for :a) Foundation, footings, bases of columns etc. and mass concrete. | 39.47 | sqm | 475.8 ₹18,779.83 | 475.8 ₹18,779.83 |
| 6.00 | Centring and shuttering including strutting, propping etc and removal of formwork for :b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc. | 308.17 | sqm | 676 ₹2.1 L | 676 ₹2.1 L |
| 7.00 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications | 40 | Nos | 249 ₹9,960 | 249 ₹9,960 |
| 8.00 | Back filling behind abutment, wing wall and return wall complete as per
drawing and Technical specification A) Granular Material | 111.28 | Cum | 1,930 ₹2.1 L | 1,930 ₹2.1 L |
| 9.00 | SH: CC Pavement. Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 meires.} | 96.08 | Cum | 366 ₹35,165.28 | 366 ₹35,165.28 |
| 10.00 | Preparation of Sub Grade:) Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. | 192.5 | Cum | 166 ₹31,955 | 166 ₹31,955 |
Tender Value
₹39.4 L
EMD Value
₹39,410
Closing Date
12 May 2026, 3:00 pmClosed
O/o EE, ND, IMC
O/o EE, ND, IMC
C/o Various Civic Infrastructure at Pachin Colony , D-Sector, C-Sector and Barapani Naharlagun (SH RCC Retaining Wall, CC Pavement).
2026_IMCAP_3441_1
IMC/EEND/XVFC/NIT-3/2026-27/2
Open Tender
Civil Works
Naharlagun
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Payable To Executive Engineer ND
₹39,410
19 May 2026
5 May 2026
13 May 2026
6 May 2026
12 May 2026
6 May 2026
6 May 2026 - 11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | SH:RCC Retaining wall. Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m. | 129.96 | cum | - | - | itemH1 |
| 2 | Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
a) Foundations and plinth | 8.55 | Cum | 100 | ₹855 | itemH2 |
| 3 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsg, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications:b) Tar/TMT steel | 247.94 | kg | 53 | ₹13,140.82 | itemH3 |
| 4 | Reinforced cement concrete in walls (any thickness) including attached
pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in:a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size) | 247.26 | Cum | 10 | ₹2,472.6 | itemH4 |
| 5 | Centring and shuttering including strutting, propping etc and removal of formwork for :a) Foundation, footings, bases of columns etc. and mass concrete. | 39.47 | sqm | 11 | ₹434.17 | itemH5 |
| 6 | Centring and shuttering including strutting, propping etc and removal of formwork for :b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc. | 308.17 | sqm | 10 | ₹3,081.7 | itemH6 |
| 7 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications | 40 | Nos | 10 | ₹400 | itemH7 |
| 8 | Back filling behind abutment, wing wall and return wall complete as per
drawing and Technical specification A) Granular Material | 111.28 | Cum | 22 | ₹2,448.16 | itemH8 |
| 9 | SH: CC Pavement. Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 meires.} | 96.08 | Cum | - | - | itemH9 |
| 10 | Preparation of Sub Grade:) Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. | 192.5 | Cum | 1 | ₹192.5 | itemH10 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_3638.xls
BOQ • 0.37 MB
SBDPackageII.pdf
Tender Documents • 1.21 MB
Download all tender documents and submit your bid