| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance | ₹4.1 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹4.3 L+₹14,679.88 (3.54%)Rejected-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | ₹4.3 L+₹14,679.88 (3.54%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹4.3 L+₹15,184.63 (3.66%)Rejected-Finance | ₹4.3 L+₹15,184.63 (3.66%) | L3 | Rejected-Finance 3rd Lowest |
| 4 | Rejected-Technical 2 2B CHRISTOPHER ROAD KOLKATA 700014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | - | - | Rejected-Technical In sufficient document submitted Refer to Clause 3.2C(III) for details |
Tender Value
₹4.2 L
EMD Value
₹8,413
Closing Date
15 Aug 2026, 11:00 amClosed
SDO, Chandannagar (I) Sub-Division, Chandannag
O/O SDO, Chandannagar (I) Sub-Division, Chandannag
Emergent Widening of 01 no Ghats and allied works for different ghats located at right bank of River Hooghly under Ward No. 12, 16 under Baidyabati Municipality, P.S. Serampore in District- Hooghly
2026_IWD_1036661_1
WBIW/SDO/CISD/e-NIT-03/2026-27
Open Tender
CIVIL WORKS
Percentage
25 days
Baidyabati
Please refer Tender documents.
8 documents required · 8 mandatory
₹8,413
Yes
31 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
15 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and removal of debris (including floating debris) including sludge & slush mixed with all sorts of industrial waste, solid/semi-solid compact mass formed due to water hyacinth in combination with industrial wastes, carcasses, municipal garbage sludge, polypacks, thick and thorny jungles and long grass etc. and depositing, spreading the same on the canal bank and later burnt to ashes when dry including all leads and lifts complete. | 1,246.44 | Sqm | 35.75 | ₹44,560.23 |
| 2 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | 0.2 | Cum | 129.91 | ₹25.98 |
| 3 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). | 1,155 | Meter | 13.11 | ₹15,142.05 |
| 4 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary | 1,001 | Meter | 13.11 | ₹13,123.11 |
| 5 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | 220 | Meter | 26.22 | ₹5,768.4 |
| 6 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg) | 2,844 | Each | 7.15 | ₹20,334.6 |
| 7 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or
agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). | 2,844 | Each | 8.34 | ₹23,718.96 |
| 8 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 2,844 | Each Bag | 3.58 | ₹10,181.52 |
| 9 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 66 | Each | 139.44 | ₹9,203.04 |
| 10 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than
0.028 m3.
Size of Nylon crate is 1metre X 1metre X 1metre.
(b) Where boats are necessary. | 66 | Each | 512.47 | ₹33,823.02 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_2546566.xls
BOQ • 0.34 MB
2911_Form.pdf
Tender Documents • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .