Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.2 LAccepted-AOC DOOR NO 7 121 SURVEY NO 7 121 K PUDUR | TIRUNELVELI | TAMIL NADU | 627001 | L1 | Accepted-AOC L1 bidder Accepted | |
| 2 | L2₹90.3 L+₹13,686 (0.15%)Rejected-AOC | L2 | Rejected-AOC L2 bidder Rejected |
Tender Value
₹90.2 L
EMD Value
₹55,500
Closing Date
29 Nov 2024, 12:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Inspector
Arulmigu Purantheeswarar Thirukkoil at Maruthadu Village in Vandavasi Taluk of Tiruvannamalai District.
Repairs and Renovation of Thirukulam for Arulmigu Purantheeswarar Thirukkoil at Maruthadu village in Vandavasi Taluk of Tiruvannamalai District
2024_HRCE_501059_1
11/2024-2025
Open Tender
Civil Works
Lump-sum
Maruthadu Village
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹55,500
30 Jun 2025
14 Nov 2024
29 Nov 2024
14 Nov 2024
29 Nov 2024
14 Nov 2024
Amount
Clearing the light jungle etc complete complying with standard specification and as directed by the departmental officers.
Earth work Open Well excavation excavation complying with relevant clauses of TNDSs well sinking and with lead upto 10 metre in sand,silt or other loose soil wet sand or silt not under water light black cotton soil sandy loam and ordinary soil etc., complete complying with standard specification and as directed by the Departmental officers.
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of M Sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Providing Rough stone dry packing for revetment including required tools and plants etc., all complete complying with standard specification and directed by departmental officers.
Using New Roughs stones
Using Old Roughs stones
Pointing the stone joints with Cement Mortar 1:4 (one of Cement and Four of M.Sand ) ) including cost and conveyance of all materials and all labour charges etc complete complying of standard specification and as directed by the Departmental Officers.
Supplying and Painting the walls with two coats of cement paint as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work).
SUB TOTAL
Lakshmanan (BID ID -1194494)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .