Loading…
Loading…
Tender Value
₹46.6 L
EMD Value
₹93,500
Closing Date
15 Jul 2026, 6:00 pm
GE (MIS) Mhow
Garrison Engineer (Maint) Infantry School Mhow (MP) - 453441
SPL REPAIR TO BLDG NO SM 169 AT GAUR ENCLAVE UNDER GE MIS MHOW
2026_MES_774637_1
8976/GE (MIS)/Mhow
Open Tender
Civil Works - Others
150 days
GE (MIS) Mhow
All as per Tender document
8 documents required · 8 mandatory
₹500
GE (MIS) Mhow
₹93,500
Yes
24 Jun 2026
24 Jun 2026
17 Jul 2026
24 Jun 2026
15 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete (un-reinforced ) of any description & in any position not specifically provided for including dismantling of floor tiles etc complete all as specified and directed. | 42 | Cum | - | - |
| 2 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of any description & in any position not specifically provided for complete all as specified and directed. | 0.28 | Cum | - | - |
| 3 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 6.42 | Qtl | - | - |
| 4 | Dismantling of stone slabs of any description or thickness in floors, approaches, dado/Partitions etc complete all as specified and directed. | 9 | 10 Sqm | - | - |
| 5 | Demolition of brick work or rubbled stone masonry including all quoins arches , pillars etc built in cement mortar and including removal from the site complete all as specified and directed. | 2 | Cum | - | - |
| 6 | Taking down chowkats or frames with shutters (without taking off shutter from frames) not exc. 1.50 sqm each, including cutting holes for removing the hold fast etc (Disturbed surface of wall shall be make good by the contractor. The rate quoted shall be deemed included for the same) complete all as specified and directed. | 84 | Each | - | - |
| 7 | Taking down chowkats or frames with shutters (without taking off shutter from frames) exc. 1.50 Sqm but n exc 4.00 Sqm each, including cutting holes for removing the hold fast etc (Disturbed surface of wall shall be make good by the contractor. The rate quoted shall be deemed included for the same) complete all as specified and directed. | 33 | Each | - | - |
| 8 | Taking down shutter of any description area exc 1.00 Sqm and not exc 2.00 Sqm each and removing from site complete etc complete all as specified and directed. | 46 | Per Leaf | - | - |
| 9 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc and including removal of debris and rubbish from the site complete all as specified and directed. | 382 | Sqm | - | - |
| 10 | Taking down steel tubing & connections including cleaning for refixing serviceable pipe or removal balance pipe of 15 mm dia bore complete all as specified and directed. | 118 | RM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_867403.xls
BOQ • 0.53 MB
Tenderandspecialcondition8976.pdf
Tender Documents • 0.54 MB
ParticlularSpecifications8976.pdf
Tender Documents • 0.52 MB
ListOfMakeMake8976.pdf
Tender Documents • 0.51 MB
DetailsOfWorkInAndInHand.pdf
Additional Documents • 0.10 MB
Download all tender documents and submit your bid