Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LQualified 173 5 MOOKANAAKURICHIPO A G PUDUR EASANTHAM ROAD KARUR KARUR TAMIL NADU 639005 | KARUR | TAMIL NADU | 639005 | L1 | Qualified MSE, Category: OBC | |
| 2 | L2₹1.4 L+₹168 (0.12%)Qualified 176 D ABULANE 176 D ABU LANE MEERUT CANTT MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | L2 | Qualified MSE, Category: General | |
| 3 | L3₹1.4 L+₹616 (0.44%)Qualified BOMBAY TRADERS CHOTI BAGDOON INDUSTRIAL AREA SECTOR 3 PITHAMPUR MADHYA PRADESH 454775 | DHAR | MADHYA PRADESH | 454775 | L3 | Qualified | |
| 4 | L4₹1.6 L+₹17,528 (12.7%)Qualified 5 9 1111 KING KOTHI HYDERABAD TELANGANA 500001 | HYDERABAD | TELANGANA | 500001 | L4 | Qualified MSE, Category: General | |
| 5 | L5₹2.2 L+₹85,568 (61.8%)Qualified PLOT NO 83C AMRAPALLY PHASE VII SAILESHREE VIHAR 83 C AMRAPALI PHASE VII NEAR TULSI VIHAR COMPLEX SAILESHREE VIHAR BHUBANESWAR SAILESHREE VIHAR | L5 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
4 Aug 2025, 10:00 amClosed
Foam Mattress (V3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6268489 Dated : 21-07-2025 Bid Document 1/7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Director
GTRE Gas Turbine Research Establishment
DRDO
C V Raman Nagar
Bengaluru
Karnataka-560093 (Director Gtre) Splitting
7881742
GEM/2025/B/6268489
Two Packet Bid
Foam Mattress (V3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
30 days
BANGALORE CITY
Total value wise evaluation
PRODUCT
1 document required · 1 mandatory
Exempted
21 Jul 2025
21 Jul 2025
4 Aug 2025
Foam Mattress (V3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6268489 Dated : 21-07-2025 Bid Document 1/7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Director
GTRE Gas Turbine Research Establishment
C V Raman Nagar
Karnataka-560093 (Director Gtre) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7881742.pdf
GEM_BID
BIDaccLB_ae1799f0-5a5b-41e6-b7571747998295264_gtrebuycon1.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .