| 1 | L 1₹11.2 LAccepted-AOC NO 2 1ST MAIN ROAD ARUTHRA NAGAR PUDUCHERRY 605 009 | PONDICHERRY | PUDUCHERRY | 605009 | L 1 | Accepted-AOC As per the chart generated L1 is accepted and AOC issued to L 1 | |
| 2 | L 2₹11.5 L+₹27,690 (2.47%)Rejected-Finance N A | L 2 | Rejected-Finance Second Least |
Tender Value
₹11.8 L
EMD Value
₹23,690
Closing Date
19 Dec 2019, 11:00 amClosed
Executive Engineer, SBDI, PWD, Puducherry
Executive Engineer, SBDI, PWD, Puducherry
Sub Work. Improvement to the existing B.T road from North East car street of Veerampattinam to approach road Ch. 0m to 465m at Arikamedu Tourist Destination in Puducherry.
2019_PWDC1_5419_1
15/SBDI/2019-20/3
Open Tender
Road Works
Item Rate
60 days
Puducherry
Please refer tender documents.
2 documents required · 2 mandatory
₹525
Executive Engineer, SBDI, PWD, Puducherry
₹23,690
4 Feb 2020
13 Dec 2019
19 Dec 2019
13 Dec 2019
19 Dec 2019
13 Dec 2019
13 Dec 2019 - 18 Dec 2019
Amount
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg. per sqm. on the prepared bituminous / granular surface cleaned with mechanical broom. (As per MoRTH specification, 4th Revision).
Providing and laying bituminous macadam with hot mix plant of capacity not less than 40 -60 TPH using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 507.7 of MoRTH specification, 4th Revision, to achieve the desired compaction. - using grade II metal and bitumen 60/70 grade.
Providing and laying semi-dense bituminous concrete with HMP of capacity not less than 40 - 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MoRTH specification, 4th Revision, complete in all respects - Using grade-II material and using bitumen 60/70 grade.
N K Gunasekaran
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .