Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹11.9 Laccepted-aoc | ₹11.9 L | accepted-aoc |
Tender Value
₹15.9 L
EMD Value
₹15,917
Closing Date
23 Apr 2026, 3:00 pmClosed
Executive Engineer
Beside MRO Office, Uppal Circle-9, MMC
Repairs and Painting to Compound wall for Rajendra Nagar Graveyard in Ward No.26, Ramanthapur, Uppal Circle-9, GHMC
694883
02/EEC-9/UPL/MMC/06/2026-27, Dated : 15-04-2026
OPEN
Civil Engineering Works
MEDCHAL-MALKAJGIRI
9 documents required · 9 mandatory
₹564
₹15,917
8 May 2026
17 Apr 2026
17 Apr 2026
Dismatling of RR masonary including all cost and conveyance charges TBSC-U.I-01
Engaging of JCB for Jungle clearence including all charges etc. complete
Engaging of labour for Jungle clearence including all charges etc. complete
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with initial lift of 3 mts and lead upto 50 m as per Technical Specification Clause 302.3 MORD
Filling with Crusher Stone dust finer than 3mm with not more than 10% passing 0.075 sieve, including supply and delivery of crusher stone dust finer than 3mm for filling, including cost of crusher stone dust, seinourage charges and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.
Laying of PCC (1:5:10) using 40mm SS:5 HBG machine crushed metal and OPC including cost and convince of all materials, labours charges, centering machinery, laying in position, curing for 7 days and all incidental charges etc, complete for lean concrete
Construction of RR Masonary in C.M (1.6) prop. Using hard granite stone including cost and conveyance of all materials like cement, sand, water, Granite stone etc. including cost of seigniorage charges on all materials, all taxes including labour for cutting stones to required size and shape, mixing of cement mortar construction, Scaffolding charges etc. complete for finished item of work.
Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work.
Plastering 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work. (APSS 1001,1003 & 1004) (CSSR) Ground floor
Supply and placing of RCC M 30 Design Mix as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design - Raft
Supply and placing of RCC M 30 Design Mix as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design - Walls
Carting away the surplus excavated earth from the work site with a lead of 10.00 Kms beyond initial lead including loading, unloading and conveyance but excluding stocking charges etc., complete for the road - 1 Cum
Engaging of Hydralic excavator EX-200 (Hitachi) for removing of silt, jungle clearance, bushes from major open nala including hire, all incidental and operational charges etc., complete(0.5cum)
Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
02-06 BOQ.xls
TENDER_DOCUMENT • 0.03 MB
Declaration 100 Rs. non judicial stamp paper.docx
TENDER_DOCUMENT • 0.01 MB
PROFORMA OF RMC MOU.pdf
TENDER_DOCUMENT • 0.06 MB
Tender document.docx
TENDER_DOCUMENT • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .