Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 01₹10 LAccepted-Finance | ₹10 L | 01 | Accepted-Finance ok |
| 2 | 02₹10.3 LAccepted-Finance 145 GALI BATASHAN CHAWRI BAZAR CHAWRI BAZAR DELHI CENTRAL DELHI DELHI 110006 UDYAM DL 01 0033958 | NORTH DELHI | DELHI | 110006 | ₹10.3 L | 02 | Accepted-Finance ok |
Updated dates
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
14 May 2026, 5:00 pmClosed
Vdo And PRASASHAK
GRAM PANCHAYAT TEHANDESAR
SHMASAN BHUMI ME TIN SHED NIRMAAN KARY TEHANDESAR
2026_PRD_555848_1
TEH/2026-27/31-35
Open Tender
Civil Works
180 days
GRAM PANCHAYAT TEHANDESAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
GRAM PANCHAYAT TEHANDESAR
₹20,000
Yes
15 May 2026
4 May 2026
15 May 2026
4 May 2026
14 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 15 cm. To cover the ground surface by cutting the average soil and removing vegetation and small plants and lifting of raw material and shrubs for 1.5 meters and putting them up to a distance of 50 meters. | 450 | वर्ग मीटर | 7.81 | ₹3,514.5 |
| 2 | Digging soil up to 1.5 depths in the foundation, ditch, barn, crushing the bottom, pouring water, grooming the armpits, removing the carved soil, refilling the empty places with soil after filling the foundation and removing the remaining soil for a distance of 50 meters. | 5.83 | वर्ग मीटर | 178.46 | ₹1,040.42 |
| 3 | Cement concrete foundation or floor 40 mm. The stone of the renowned measure is to be poured into the limestone ballast /brick soil, cement-sand masala in the ratio of 1 cement : 4 sand : 8 ballast and cutting, including lowland. | 0.73 | घन मीटर | 3,514.97 | ₹2,565.93 |
| 4 | Cement Concrete 1:1.5:3 Pouring and supplying the mixture into the reinforced cement concrete, pressing in roof slabs, balconies, beams, lintles, etc., etc., but the cost of steel and shuttering, including restrictions, etc., and leveling the surface with 1:3 cement spices, etc. | 3.24 | घन मीटर | 5,761.62 | ₹18,667.65 |
| 5 | The work of cutting, folding and placing and tying iron for RCC work is done to supply. | 287.35 | KG | 92.78 | ₹26,660.33 |
| 6 | The function of iron in the grill/gate etc., including cutting, plating and applying flat corneas, t and chainls etc. BSR Item 63 | 2,876.05 | KG | 101.68 | ₹2,92,436.76 |
| 7 | Installation and supply of green or yellow lit roof expo corrugated sheets (anti-corrosion, sealing and weather proof and lamp resistant). Analysis 3.5 X for 4.5 = 15.75 m2 | 96 | वर्ग मीटर | 596.16 | ₹57,231.36 |
| 8 | Shuttring and crane charges Lumpsump | 1 | LMSP | 5,000 | ₹5,000 |
| 9 | Digging soil up to 1.5 depths in the foundation, ditch, barn, crushing the bottom, pouring water, grooming the armpits, removing the carved soil, refilling the empty places with soil after filling the foundation and removing the remaining soil for a distance of 50 meters. | 9.67 | घन मीटर | 178.46 | ₹1,725.71 |
| 10 | In the foundation and chair, they are made of stone in cement-gravel spices, including the edge of the side and the lowlands etc. In CM 1:6. | 16.92 | घन मीटर | 3,416.01 | ₹57,798.89 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
02.pdf
Tender Documents • 11.33 MB
BOQ_989906.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid