Loading…
Loading…
Tender Value
₹83.6 L
EMD Value
₹1.7 L
Closing Date
3 Sept 2026, 10:00 pm6d left
Karnataka Power Corporation Limited
K S Ramesh
9449596497
The Operational works of Chemical treatment of Cooling Water systems of Unit-1, 2 (500MW each) & Unit-3 (700MW), generation & dosing of Chlorine dioxide for Unit 1&2 and Sampling of pre-boiler/boiler and various other water samples at Ballari Thermal power Station (BTPS), Kuduthini for a period of ONE YEAR.
KPCL/2026-27/PS/WORK_INDENT4601
KPCL/2026-27/PS/WORK_INDENT4601
Open
Power stations
Two Tender Document System(Two Cover)
KPCL Chemical Office CHEM BTPS Bellary
4 documents required · 2 mandatory · 2 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
The intended bidder individually should have satisfactorily executed similar nature of work like work of Chemical treatment of Cooling Water systems generation dosing of Chlorine dioxide Sampling of pre boiler boiler and various other water samples in any thermal plant of 210 MW or above or any process industry. OR The bidder should have executed complete O and M works of similar nature like work of Chemical treatment of Cooling Water systems generation and dosing of Chlorine dioxide Sampling of pre boiler boiler and various other water samples in any thermal plant of 210 MW or above or any process industry. The bidder should have satisfactorily executed the above said work as a Prime Contractor for an amount of not less than Rs. 41.80 Lakhs in any one of the preceding five years. Work done value of previous years shall be given weightage of 10% per year to bring them to the present price level of the financial year in which tenders are invited. The intending bidder shall submit the Work Order and relevant work done certificate as a documentary proof issued by the Competent Authority. On demand original shall be produced for verification.
The bidder who has executed the works as mentioned above with a single work order shall submit the work order and relevant work done certificate for an amount of not less than Rs. 41.80 Lakhs as a documentary proof issued by the Competent Authority. On demand original shall be produced for verification. Work done values of previous years shall be given weightage of 10% per year to bring them to the present price level of the financial year in which the tender is invited. Bidder who has executed the contract as a sub-contractor shall not be considered for evaluation. In case, if the bidder has executed the complete O&M contract of entire power plant, the agency shall furnish work done certificate for having executed works as mentioned above, for an amount of not less than Rs. 41.80 Lakhs OR if the bidder submits lump sum work done certificate of the entire power plant contract for having executed the Complete O&M works, in such case 1/3rd amount of contract executed value will be considered for evaluation and same shall not be less than Rs. 41.80 Lakhs. The intending bidder who has executed the works as mentioned above with multiple work orders (limited to THREE) shall furnish corresponding work done certificate collectively for an amount of not less than Rs. 41.80 Lakhs.
The bidder should have achieved a minimum annual financial turnover of Rs. 167.21 Lakhs in any two of the previous five financial years. As a proof of turnover, bidder shall furnish financial report audited by Certified Auditor / Chartered Accountant of any two of the preceding five financial years along with the technical bid. The Bidder shall furnish the Profit and Loss statement duly certified by chartered accountant as a documentary proof. On demand original shall be produced for verification. Financial turnover of previous years shall be given a weightage of 10% per year to bring them to present price level of the financial year in which tender is invited.
The agency should have PF, GST, ESI, PAN, Insurance, Valid Labor license with statutory department and shall upload original copy of above registration certificate in e-portal
₹2,100
₹1.7 L
13 Aug 2026
13 Aug 2026
5 Sept 2026
27 Aug 2026
19 Aug 2026
The Operational works of Chemical treatment of Cooling Water systems of Unit-1, 2 (500MW each) & Unit-3 (700MW), generation & dosing of Chlorine dioxide for Unit 1&2 and Sampling of pre-boiler/boiler and various other water samples at Ballari Thermal power Station (BTPS), Kuduthini for a period of ONE YEAR
Supervision of CWT operation, generation of chlorine di oxide. Recording and reporting of analysis results and maintaining daily log sheets and log books. Reporting and maintaining records.
All associated chemical operation and handling of all required chemicals, stroke adjustment for dosing of chemicals. Sulphuric acid and chlorine di oxide dosing by mechanical means. Dosing of ozone to...
Collection of samples of pre-boiler, Boiler and steam line, Flue gas, Hydrogen, Make up water, Cooling water and any other samples as and when needed. Handling of chemicals. Chemical preparation perta...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender document 2026-27.pdf
Tender Document • 0.43 MB
corrigendum c1.pdf
pdf • 0.10 MB
dgm c corrigendum.pdf
pdf • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].