Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 CrAccepted-AOC MANDIPORA TEHSIL DOORU DISTRICT ANANTNAG | MANDIPORA | ANANTNAG | JAMMU KASHMIR | ₹8.0 Cr | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹8.4 Cr+₹33.4 L (4.15%)Rejected-Finance BONAGUND VERINAG ANANTNAG J K 192212 | ₹8.4 Cr+₹33.4 L (4.15%) | L2 | Rejected-Finance rejected |
| 3 | L3₹8.4 Cr+₹33.4 L (4.15%)Rejected-Finance H NO 04 GURHA BAKSHI NAGAR JAMMU | JAMMU | JAMMU | JAMMU AND KASHMIR | ₹8.4 Cr+₹33.4 L (4.15%) | L3 | Rejected-Finance rejected |
| 4 | L4₹8.9 Cr+₹87.0 L (10.8%)Rejected-Finance | ₹8.9 Cr+₹87.0 L (10.8%) | L4 | Rejected-Finance rejected |
Tender Value
₹11.6 Cr
EMD Value
₹23.2 L
Closing Date
9 Sept 2025, 5:00 pmClosed
Chief Engineer PMGSY (JKRRDA) Jammu
Office of The Chief Engineer PMGSY(JKRRDA) Jammu at 1st Floor, Mechanical Engineering Department (MED) Complex University Road Jammu
Construction and Maintenance of Road from L030-(Link Road) Livera to Gager Nag, Package No. JK19-4010, PMGSY-IV, Batch-I of 2025-26, Block-Ramsu, District Ramban Length-3.550 Kms
2025_JKRRD_143940_1
JK194010
Open Tender
Civil Works - Roads
Percentage
450 days
Ramsu
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
₹23.2 L
Office of The Chief Engineer PMGSY (JKRRDA) Jammu
26 Nov 2025
11 Aug 2025
11 Sept 2025
11 Aug 2025
9 Sept 2025
14 Aug 2025
13 Aug 2025 - 14 Aug 2025
13 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 8.30 MB
BOQ_223171.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .