| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.7 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹19.7 L
EMD Value
₹59,081
Closing Date
5 Jan 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Construction of drain work using CC and RCC from Nausir house to Puppendra house in Kailakheda, Ward No. 23 Kailashnagar.
2025_DOLBU_1101517_49
103/Nirman/2025-26 Date 22.12.2025
Open Tender
Civil Works
Percentage
CE
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹59,081
6 Mar 2026
25 Dec 2025
5 Jan 2026
25 Dec 2025
5 Jan 2026
25 Dec 2025
Demolishing Reinforced cement concrete or reinforced brick work including stacking of materials as per directed by the of Engineer - in -charge.SOR 2022 S.I N0 694
Dismantling sundries brick work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet)
Cleaning of silt/sludge in foul condition lift upto 30 m distance etc all completed as per direction of engineer in charge .
E/W in Excavation in foundation in ordinary soil etc all complete as the direction of engineer in charge.
Earth Work in Embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkmene. AS per 2022/23 1(a)+253(a) S.I.No.4.03.
Disposal of earth up to 8.00 Km from site including etc. all complete work.
Providing & supply gunny bags including cost of sand and stitching of bags and laying in position
Dewatering/Diversion of water by diesal engine pump including opretor,fuel,required length of flexible pipe for proper disposel of water etc all .
S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge S.I N0-273
RCC work with cement, approved coarse sand and 2 cm gauge stone grit in proportions of 1:1.5:3 in slab wall etc extra.S.I.No. 283A
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars DSR 2023 ITEM N. 5.22.1
M-150 Brick work in 1:4 one cement and four course sand mortar in foundation and plinth Including suppy of all material labour,T&P etc required for proper completion of the work S.I No 305(a) SOR-2022
12 mm thcik plaster (1:4) with cement & coarse sand including all materials,labour,tools, & plant etc all completed as per the direction of engineer -in - charge.SOR 2022 S.I N0-584 New item
S/L of 22.4 to 53 mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge RMR
Consolidation stone aggregates of 45-63mm/22.4-53mm size to water bound macadam S.I.No752
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer. sealant, dowel bars near approaches to bridge/culvert and construction joints. admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine. Technical
P.c.c in 1:2:4 with 2 cm gauge stone grit of instead of 4 cm gauge stone ballast etc all complete.S.I No 279 (a)SOR 2022
Ded the cost of old bricks /batts
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.94 MB
BOQ_2030534.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .