Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.0 L+₹48,889.20 (8.92%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹6.1 L+₹59,186.37 (10.8%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹6.1 L+₹63,484.32 (11.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹6.3 L+₹77,810.83 (14.2%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.9 L
EMD Value
₹17,900
Closing Date
24 Sept 2026, 4:00 pmClosed
Executive Engineer
XEN HANDWARA
Upgradation of road from PHC Magam to upper Mochi Mohalla via pyt.road BWO construction of Cause way
2026_PWDJK_324480_7
NIT NO 36 OF 2026-27
Open Tender
Civil Works
Percentage
60 days
Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer Handwara
₹17,900
Yes
25 Sept 2026
14 Sept 2026
25 Sept 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of Stream, removing of all sludge materials avg lead 5 km out of town by using jcb,tippers/tractors | 1 | job | 5,000 | ₹5,000 |
| 2 | Earth work in excavation by mechanical means in trenches for foundations drains, pipes cables etc (not exceeding 1.5Mtr in width and for shafts wells cesspits and the like not exceeding 10Sqm on plan depth up to 1.5Mtr including disposal of excavated earth up to 1 Mtr from cutting edge , disposed earth to be leveled and neatly dressed all kinds of soil. | 75.4 | cum | 256.85 | ₹19,366.49 |
| 3 | Supply and filling of dry stone soling in foundation trenches hand packed tightly incl. all carriages complete. | 16.73 | cum | 850 | ₹14,220.5 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering, All work upto plinth level, 1:4:8 ( 1 cement, 4 coarse sand ; 8 graded stone aggregate). | 25.09 | cum | 5,552 | ₹1,39,299.68 |
| 5 | Reinforced cement concrete work 1.1.5.3 in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement | 36.24 | cum | 9,500 | ₹3,44,280 |
| 6 | Centering and shuttering incl. strutting propping etc. and removal of from work for Foundation footing bases of columns etc m | 32.28 | sqm | 628 | ₹20,271.84 |
| 7 | Reinforcement of concrete work incl bending cutting in position complete job as per engineer site incharge | 28.65 | qtl | 12,320 | ₹3,52,968 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1094704.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .